Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 10

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Construction Of Four Lane Bilaspur - Urga Section Of NH-130A From Design Ch. 0+000
To Ch. 70+200, (From NH-49 Near Dheka Village To Bhaisma Village) Under
Bharathmla Pariyojana (Lot-3/Chatisgarh/Packege-1 , Raipur -Dhabad Economic
Corridor) In The State Of Chatisgarh On HAM Mode.

CLIENT : M/s National Highway Authority of India

INDEPENDENT ENGINEER : M/S L N Malviya Infra Projects Private Limited

CONCESSIONAIRE :M/S G R Bilaspur Urga Highway Private Limited (GBUHPL)

CONTRACTOR : M/s GR Infra Projects Ltd.

RMC PLANT CALIBRATION


RFI No. GBUHPL/DHMA/QC/2022/03

Location : Base Camp @ 33+300 LHS Calibration Date 23.04.2022

RMC Plant Name : SCHWING STETTER S No -199 Calibration Due Date 22.07.2022

Capacity : 140 Cum/Hour & Per Batch 2.5 m 3 Calibrated By : Jointly

WATER SCALE
Standard Display Weight (in Kg)
% Error
Sr. No Weights Average
(in Kg) Loading Unloading

1 0 0 0 0.0 0.00

2 10 10 10 10.0 0.00

3 20 20 20 20.0 0.00

4 30 30 30 30.0 0.00

5 40 40 40 40.0 0.00

6 50 50 50 50.0 0.00

7 60 60 60 60.0 0.00

8 70 70 70 70.0 0.00

9 80 80 80 80.0 0.00

10 90 90 90 90.0 0.00

11 100 100 100 100.0 0.00

12 120 120 120 120.0 0.00

13 140 140 140 140.0 0.00

14 160 161 160 160.5 0.31

15 180 180 181 180.5 0.28

16 200 201 201 201.0 0.50


WATER SCALE
Standard Display Weight (in Kg)
Sr. No Weights Average % Error
(in Kg) Loading Unloading

17 220 221 221 221.0 0.45

18 240 241 241 241.0 0.42

19 260 261 261 261.0 0.38

20 280 281 281 281.0 0.36

21 300 301 301 301.0 0.33

22 320 321 320 320.5 0.16

23 340 342 341 341.5 0.44

24 360 362 362 362.0 0.56

25 380 382 382 382.0 0.53

26 400 402 402 402.0 0.50

27 420 422 422 422.0 0.48

28 440 443 442 442.5 0.57

29 460 462 463 462.5 0.54

30 480 484 483 483.5 0.73

31 500 504 504 504.0 0.80

Avg. Error (%) = 0.27


Acceptable Variation as per IS 4925-2004 +/- 1% Max.

For Contractor For Concessionaire For Independent


Engineer

(Name & Signature) (Name & Signature) (Name & Signature)


ONAL HIGHWAYS AUTHORITY OF INDIA
ur Lane Bilaspur - Urga Section Of NH-130A From Design Ch. 0+000
om NH-49 Near Dheka Village To Bhaisma Village) Under
jana (Lot-3/Chatisgarh/Packege-1 , Raipur -Dhabad Economic
ate Of Chatisgarh On HAM Mode.

hway Authority of India

ra Projects Private Limited

Urga Highway Private Limited (GBUHPL)

ects Ltd.

PLANT CALIBRATION

23.04.2022

22.07.2022

: Jointly

WATER SCALE

Remarks
WATER SCALE

Remarks

/- 1% Max.
For Independent
Engineer

(Name & Signature)


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Construction Of Four Lane Bilaspur - Urga Section Of NH-130A From Design Ch. 0+000 To Ch.
70+200, (From NH-49 Near Dheka Village To Bhaisma Village) Under Bharathmla Pariyojana
(Lot-3/Chatisgarh/Packege-1 , Raipur -Dhabad Economic Corridor) In The State Of Chatisgarh
On HAM Mode.

CLIENT : M/s National Highway Authority of India

INDEPENDENT ENGINEER : M/S L N Malviya Infra Projects Private Limited

CONCESSIONAIRE :M/S G R Bilaspur Urga Highway Private Limited (GBUHPL)

CONTRACTOR : M/s GR Infra Projects Ltd.

RMC PLANT CALIBRATION


RFI No. GBUHPL/DHMA/QC/2022/03

Location : Base Camp @ 33+300 LHS Calibration Date 23.04.2022

RMC Plant Name : SCHWING STETTER S No -199 Calibration Due Date 22.07.2022

Capacity : 140 Cum/Hour & Per Batch 2.5 m3 Calibrated By : Jointly

ADMIXTURE SCALE
Standard Display Weight (in Kg)
Sr. No Weights Average % Error Remarks
(in Kg) Loading Unloading

1 0 0 0 0.000 0
2 0.05 0.05 0.05 0.050 0.00
3 0.1 0.10 0.10 0.100 0.00
4 0.15 0.15 0.15 0.150 0.00
5 0.2 0.20 0.20 0.200 0.00
6 0.25 0.25 0.25 0.250 0.00
7 0.3 0.30 0.30 0.300 0.00
8 0.35 0.35 0.35 0.350 0.00
9 0.4 0.40 0.40 0.400 0.00
10 0.45 0.45 0.45 0.450 0.00
11 0.5 0.50 0.50 0.500 0.00
12 1 1.00 1.01 1.005 0.50
13 1.5 1.50 1.52 1.510 0.67
14 2 2.00 2.02 2.010 0.50
15 2.5 2.50 2.52 2.510 0.40
16 3 3.00 3.01 3.005 0.17
17 3.5 3.50 3.52 3.510 0.29
18 4 4.02 4.01 4.015 0.37
19 4.5 4.54 4.53 4.535 0.78
20 5 5.04 5.04 5.040 0.80
21 6 6.01 6.02 6.015 0.25
22 7 7.01 7.01 7.010 0.14
ADMIXTURE SCALE
Standard Display Weight (in Kg)
Sr. No Weights Average % Error Remarks
(in Kg) Loading Unloading

23 8 8.01 8.01 8.010 0.13


24 9 9.01 9.03 9.020 0.22
25 10 10.09 10.01 10.050 0.50
26 11 11.10 11.01 11.055 0.50
27 12 12.01 12.01 12.010 0.08
28 13 13.02 13.03 13.025 0.19
29 14 14.02 14.02 14.020 0.14
30 15 15.10 15.10 15.100 0.67

Avg. Error (%) = 0.24


Acceptable Variation as per IS 4925-2004 +/- 3 %Max.
For Contractor For Concessionaire For Independent Engineer

(Name & Signature) (Name & Signature) (Name & Signature)


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Construction Of Four Lane Bilaspur - Urga Section Of NH-130A From Design Ch. 0+000
To Ch. 70+200, (From NH-49 Near Dheka Village To Bhaisma Village) Under
Bharathmla Pariyojana (Lot-3/Chatisgarh/Packege-1 , Raipur -Dhabad Economic
Corridor) In The State Of Chatisgarh On HAM Mode.

CLIENT : M/s National Highway Authority of India

INDEPENDENT ENGINEER : M/S L N Malviya Infra Projects Private Limited

CONCESSIONAIRE :M/S G R Bilaspur Urga Highway Private Limited (GBUHPL)

CONTRACTOR : M/s GR Infra Projects Ltd.

RMC PLANT CALIBRATION


RFI No. GBUHPL/DHMA/QC/2022/03

Location : Base Camp @ 33+300 LHS Calibration Date 23.04.2022

RMC Plant Name : SCHWING STETTER S No -199 Calibration Due Date 22.07.2022

Capacity : 140 Cum/Hour & Per Batch 2.5 m3 Calibrated By : Jointly

CEMENT SCALE
Standard Display Weight (in Kg)
Sr. No Weights Average % Error Remarks
(in
Kg) Loading Unloading

1 0 0 0 0.0 0.00

2 20 20 20 20.0 0.00
3 40 40 40 40.0 0.00
4 60 60 60 60.0 0.00
5 80 80 80 80.0 0.00
6 100 100 100 100.0 0.00
7 120 120 120 120.0 0.00
8 140 140 141 140.5 0.36
9 160 160 161 160.5 0.31
10 180 180 181 180.5 0.28
11 200 200 201 200.5 0.25
12 220 220 221 220.5 0.23
13 240 240 241 240.5 0.21
14 260 260 260 260.0 0.00
15 280 280 281 280.5 0.18
16 300 300 302 301.0 0.33
17 320 320 322 321.0 0.31
18 340 340 342 341.0 0.29
19 360 360 362 361.0 0.28
20 380 380 382 381.0 0.26
21 400 400 402 401.0 0.25
22 420 420 422 421.0 0.24
23 440 440 442 441.0 0.23
24 460 460 463 461.5 0.33
CEMENT SCALE
Standard Display Weight (in Kg)
Sr. No Weights Average % Error Remarks
(in
Kg) Loading Unloading

25 480 480 483 481.5 0.31


26 500 500 503 501.5 0.30
27 520 520 523 521.5 0.29
28 540 541 543 542.0 0.37
29 560 562 563 562.5 0.45
30 580 582 584 583.0 0.52
31 600 602 604 603.0 0.50
32 620 622 623 622.5 0.40
33 640 642 644 643.0 0.47
34 660 662 665 663.5 0.53
35 680 682 685 683.5 0.51
36 700 704 705 704.5 0.64
37 720 722 721 721.5 0.21
38 740 742 746 744.0 0.54
39 760 762 766 764.0 0.53
40 780 780 786 783.0 0.38
41 800 800 806 803.0 0.37
42 820 820 826 823.0 0.37
43 840 840 845 842.5 0.30
44 860 866 865 865.5 0.64
45 880 885 880 882.5 0.28
46 900 903 903 903.0 0.33
47 920 925 923 924.0 0.43
48 940 945 945 945.0 0.53
49 960 965 965 965.0 0.52
50 980 988 982 985.0 0.51
51 1000 1005 1005 1005.0 0.50
52 1020 1025 1023 1024.0 0.39
53 1040 1045 1042 1043.5 0.34
54 1060 1065 1062 1063.5 0.33
55 1080 1087 1084 1085.5 0.51
56 1100 1107 1102 1104.5 0.41
57 1120 1127 1125 1126.0 0.54
58 1140 1145 1143 1144.0 0.35
59 1160 1165 1162 1163.5 0.30
60 1180 1185 1185 1185.0 0.42
61 1200 1207 1207 1207.0 0.58
Avg. Error (%) = 0.33
Acceptable Variation as per IS 4925-2004 +/- 1 %Max.
For Contractor For Concessionaire For Independent Engineer
CEMENT SCALE
Standard Display Weight (in Kg)
Sr. No Weights Average % Error Remarks
(in
Kg) Loading Unloading

(Name & Signature) (Name & Signature) (Name & Signature)


NATIONAL HIGHWAYS AUTHORITY OF INDIA

Construction Of Four Lane Bilaspur - Urga Section Of NH-130A From Design Ch. 0+000 To Ch. 70+200, (From NH-
49 Near Dheka Village To Bhaisma Village) Under Bharathmla Pariyojana (Lot-3/Chatisgarh/Packege-1 , Raipur
-Dhabad Economic Corridor) In The State Of Chatisgarh On HAM Mode.

CLIENT : M/s National Highway Authority of India

INDEPENDENT ENGINEER : M/S L N Malviya Infra Projects Private Limited

CONCESSIONAIRE :M/S G R Bilaspur Urga Highway Private Limited (GBUHPL)

CONTRACTOR : M/s GR Infra Projects Ltd.

RMC PLANT CALIBRATION


RFI No. GBUHPL/DHMA/QC/2022/03

Location : Base Camp @ 33+300 LHS Calibration Date 23.04.2022

RMC Plant Name : SCHWING STETTER S No -199 Calibration Due Date 22.07.2022

Capacity : 140 Cum/Hour & Per Batch 2.5 m3 Calibrated By : Jointly

AGGREGATE SCALE
Standard Weights Display Weight (in Kg)
Sr. No Average % Error Remarks
(in Kg) Loading Unloading

1 0 0 0 0.0 0.00
2 100 100 100 100.0 0.00
3 200 200 200 200.0 0.00
4 300 300 298 301.0 0.33
5 400 399 399 399.0 -0.25
6 500 499 500 499.5 -0.10
7 600 599 598 598.5 -0.25
8 700 701 698 699.5 -0.07
9 800 801 799 800.0 0.00
10 900 900 900 900.0 0.00
11 1000 1000 999 999.5 -0.05
12 1100 1099 1105 1102.0 0.18
13 1200 1199 1205 1202.0 0.17
14 1300 1298 1305 1301.5 0.12
15 1400 1398 1405 1401.5 0.11
16 1500 1498 1505 1501.5 0.10
17 1600 1599 1600 1599.5 -0.03
18 1700 1700 1702 1701.0 0.06
19 1800 1800 1803 1801.5 0.08
20 1900 1902 1902 1902.0 0.11
21 2000 2002 2004 2003.0 0.15
22 2100 2105 2102 2103.5 0.17
23 2200 2204 2200 2202.0 0.09
24 2300 2306 2304 2305.0 0.22
25 2400 2405 2400 2402.5 0.10
26 2500 2509 2500 2504.5 0.18
27 2600 2609 2606 2607.5 0.29
28 2700 2718 2718 2718.0 0.67

Avg. Error (%) = 0.08

Acceptable Variation as per IS 4925-2004 +/- 2 %Max.


For Contractor For Concessionaire For Independent Engineer

(Name & Signature) (Name & Signature) (Name & Signature)