PROYEK PEMBANGUNAN BENDUNGAN LAU SIMEME (PAKET 1) (MYC)

SUMMARY TEST RESULT OF TRIAL EMBANKMENT ZONA 2A

Field Density LABORATORY TEST Density Sieve Analysis


Thickness Permeability
No. Location Material Passing Wet Density Water Dry density Min Max Determination Max. <4.75mm <0.074mm Remarks
Content
cm T/m3 (%) T/m3 T/m3 T/m3 (%) cm/sec. mm % %
1 Trial Embankment Filter Halus 0 1.415 7.29 1.319 1.325 1.666 0.00
2 Trial Embankment Filter Halus 1.573 9.61 1.435 1.325 1.666 37.46
2
3 Trial Embankment Filter Halus 1.564 10.17 1.419 1.325 1.666 32.49
4 Trial Embankment Filter Halus 1.714 7.23 1.598 1.325 1.666 83.52 2.83E-03 19 96.67 1.16
4
5 Trial Embankment Filter Halus 40 1.712 7.47 1.593 1.325 1.666 82.28
6 Trial Embankment Filter Halus 1.731 8.23 1.599 1.325 1.666 83.72
6
7 Trial Embankment Filter Halus 1.806 8.76 1.660 1.325 1.666 98.63 3.08E-03 19 96.36 1.06
8 Trial Embankment Filter Halus 1.632 7.31 1.521 1.325 1.666 63.05
8
9 Trial Embankment Filter Halus 1.733 6.35 1.630 1.325 1.666 91.41 2.93E-03 19 97.44 0.99

Mengetahui Diperiksa & Disetujui Diajukan


DIREKSI KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

(_________________________) (____________________________) (____________________________)


PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
FIELD DENSITY TEST - by WATER METHOD (ASTM D5030-89)
( Relative Density )

Date of Test 15-May-23 Tested by Lab WIKA-BK


Location Trial Embankment Checked by
Material Filter Halus Layer 2

Test No 1 2 3
Passing 0 4 4
Before Compaction 40
Thickness
After Compaction
FIELD DENSITY DETERMINATION
a Berat awal air dalam ring ( gr ) 15385 50050 8670
b Berat sisa air ( gr ) 7645 43360 1950
c Berat air dalam ring ( a-b ) ( gr ) 7740 6690 6720
( gr ) 38945 49880 44180
Berat Sampel dari lubang
d ( gr ) 26955 20340 28630
Total berat Sampel dari lubang ( gr ) 65900 70220 72810
( gr ) 26025 34320 30240
Berat Air Terpakai
e ( gr ) 31400 12220 18580
Total Berat Air Terpakai ( gr ) 57425 46540 48820
f Sisa air ( gr ) 3125 4870 5900
g Total Berat Air Dalam Lubang + Ring ( e-f ) ( gr ) 54300 41670 42920
h Berat Air Dalam Lubang ( g-c) ( gr ) 46560 34980 36200
i Wet density ( d/h ) (t/m3) 1.415 2.007 2.011
j Kadar Air (%) 7.29 7.18 7.59
k Dry density (100 x i) /(j +100) (t/m3) 1.319 1.873 1.869
LABORATORY TEST
l Lab Max Dry Density (t/m3) 1.666 1.666
m Lab Min Dry Density (t/m3) 1.325 1.325
RELATIVE DENSITY DETERMINATION
n lx(k-m)
o kx(l-m)
p D Value (%)
q Pecification Minimum Dry Density (%) > 70 %
WATER CONTENT
Dish No.
a Mass of wet soil + dish ( gr ) 574 838 848
b Mass of dry soil + dish ( gr ) 535 795 802
c Mass of dish ( gr ) 0 196 196
d Mass of water (a-b) ( gr ) 39 43 46
e Mass of dry soil (b-c) ( gr ) 535 599 606
f Moisture content (d / e ) x100 (%) 7.29 7.18 7.59

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
FIELD DENSITY TEST - by WATER METHOD (ASTM D5030-89)
( Relative Density )

Date of Test 15-May-23 Tested by Lab WIKA-BK


Location Trial Embankment Checked by
Material Filter Halus Layer 2

Test No 1 2
Passing 2 2
Before Compaction 40 40
Thickness
After Compaction 36.5 36.5
FIELD DENSITY DETERMINATION
a Berat awal air dalam ring ( gr ) 13385 13840
b Berat sisa air ( gr ) 6930 7260
c Berat air dalam ring ( a-b ) ( gr ) 6455 6580
( gr ) 40935 41120
Berat Sampel dari lubang
d ( gr ) 16500 16035
Total berat Sampel dari lubang ( gr ) 57435 57155
( gr ) 25255 31715
Berat Air Terpakai
e ( gr ) 24555 16710
Total Berat Air Terpakai ( gr ) 49810 48425
f Sisa air ( gr ) 6840 5295
g Total Berat Air Dalam Lubang + Ring ( e-f ) ( gr ) 42970 43130
h Berat Air Dalam Lubang ( g-c) ( gr ) 36515 36550
i Wet density ( d/h ) (t/m3) 1.573 1.564
j Kadar Air (%) 9.61 10.17
k Dry density (100 x i) /(j +100) (t/m3) 1.435 1.419
LABORATORY TEST
l Lab Max Dry Density (t/m3) 1.666 1.666
m Lab Min Dry Density (t/m3) 1.325 1.325
RELATIVE DENSITY DETERMINATION
n lx(k-m) 0.183 0.157
o kx(l-m) 0.489 0.484
p D Value (%) 37.46 32.49
q Pecification Minimum Dry Density (%) > 70 %
WATER CONTENT
Dish No.
a Mass of wet soil + dish ( gr ) 867 715
b Mass of dry soil + dish ( gr ) 791 649
c Mass of dish ( gr ) 0 0
d Mass of water (a-b) ( gr ) 76 66
e Mass of dry soil (b-c) ( gr ) 791 649
f Moisture content (d / e ) x100 (%) 9.61 10.17

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
FIELD DENSITY TEST - by WATER METHOD (ASTM D5030-89)
( Relative Density )

Date of Test 15-May-23 Tested by Lab WIKA-BK


Location Trial Embankment Checked by
Material Filter Halus Layer 2

Test No 1 2
Passing 4 4
Before Compaction 40 40
Thickness
After Compaction 34 34
FIELD DENSITY DETERMINATION
a Berat awal air dalam ring ( gr ) 15420 14240
b Berat sisa air ( gr ) 9165 6585
c Berat air dalam ring ( a-b ) ( gr ) 6255 7655
( gr ) 44660 36815
Berat Sampel dari lubang
d ( gr ) 23315 32860
Total berat Sampel dari lubang ( gr ) 67975 69675
( gr ) 30600 32795
Berat Air Terpakai
e ( gr ) 16020 16350
Total Berat Air Terpakai ( gr ) 46620 49145
f Sisa air ( gr ) 700 800
g Total Berat Air Dalam Lubang + Ring ( e-f ) ( gr ) 45920 48345
h Berat Air Dalam Lubang ( g-c) ( gr ) 39665 40690
i Wet density ( d/h ) (t/m3) 1.714 1.712
j Kadar Air (%) 7.23 7.47
k Dry density (100 x i) /(j +100) (t/m3) 1.598 1.593
LABORATORY TEST
l Lab Max Dry Density (t/m3) 1.666 1.666
m Lab Min Dry Density (t/m3) 1.325 1.325
RELATIVE DENSITY DETERMINATION
n lx(k-m) 0.455 0.447
o kx(l-m) 0.545 0.543
p D Value (%) 83.52 82.28
q Pecification Minimum Dry Density (%) > 70 %
WATER CONTENT
Dish No.
a Mass of wet soil + dish ( gr ) 816 892
b Mass of dry soil + dish ( gr ) 761 830
c Mass of dish ( gr ) 0 0
d Mass of water (a-b) ( gr ) 55 62
e Mass of dry soil (b-c) ( gr ) 761 830
f Moisture content (d / e ) x100 (%) 7.23 7.47

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
Tes Permeabilitas Lapangan (FPT)
(Constant Head Method )
Date of Test 15-May-23 Tested by Lab WIKA-BK
Location Trial Embankment Checked by
Material Filter Halus Layer 2
1 Passing 4
2 No. Tes 1 2 3
3 Diameter Lubang Tes d cm 50.00 50.00 50.00
4 r = 1/2 x d r cm 25.00 25.00 25.00
5 Volume of Air V cc 1000 1000 1000
6 Tinggi Air H cm 36.00 36.00 36.00
7 Waktu t detik 21.91 27.56 20.5
8 [8] / [10] Q cc/detik 45.641 36.284 48.780
9 [9] / [7] H/r 1.4400 1.4400 1.4400
2 2
10 [12] (H/r) 2.0736 2.0736 2.0736
2
11 1 + [13] 1+ (H/r) 1.7532 1.7532 1.7532
2
12 [12] + [14] H/r + 1+ (H/r) 3.1932 3.1932 3.1932
13 [9] * log(e) [15] 41.7965 41.7965 41.7965
14 [7]2 + [9]2 r2 + H2 43.8292 43.8292 43.8292
15 [16] - [17] + [7] 22.9673 22.9673 22.9673
16 2 p [9]3 293148.3 293148.3 293148.3
17 [11] / [19] 1.56E-04 1.24E-04 1.66E-04
18 [18]*[20] KT cm/detik 0.003576 0.002843 0.003822
o
19 Suhu T C 28 28 28
20 mT (poises) 0.00836 0.00836 0.00836
21 m o
20 C 0.01009 0.01009 0.01009
22 [23] / [24] 0.82854 0.82854 0.82854
o
23 K 20 C = [21] x [25] cm/sec 2.96E-03 2.36E-03 3.17E-03
o
24 Rata-rata K 20 C cm/sec 2.83E-03
d

Note : (Q1 - Q2)   5% of Q1, H/r > 1 Alat


pengukur
kedalaman
air

(Q2 - Q3)   5% of Q2 bit


De s tan
ko
Q
n

Rumus:

K=
Q
[H Log(e) { H
+ 1+ ( r)2
H
}- r2 + H2 + r ] Gravel
H

2p H3 r

Ref. : Suyono Sosrodarsono-Kensaku Takeda, BTU, Hal. 66.


Turunan dari USBR 7300-89

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAU SIMEME (MYC) (PAKET I)
SIEVE ANALYSIS (ASTM C-136)

Tanggal Pengujian : 15-May-23 Sampel No. : 2


Material : Filter (Zona 2a) Diuji Oleh : LAB. WIKA-BK
Asal Material : ex Sungai Wampu Diperiksa Oleh :

Sampel 1 Sampel 2
Weight Total
Weight total sample 1014 gram gram
sample
Sieve Cumulative Percent Cumulative Percent Remarks
Size Wt.Sample % Retained Passing Wt.Sample % Retained Passing
mm (gr) (gr) (%) (gr) (gr) (%)
76.0 0 0.00 100.00
50.8 0 0.00 100.00
38.1 0 0.00 100.00
25.4 0 0.00 100.00
19.0 0 0.00 100.00
9.5 14 1.38 98.62
4.75 26 2.56 97.44
2.00 64 6.31 93.69
0.850 127 12.52 87.48
0.425 515 50.79 49.21
0.250 817 80.57 19.43
0.106 997 98.32 1.68
0.074 1004 99.01 0.99

0.07 0.7 Curva Gradasi 7


100

90

80

70
Percentage passing

60

50

40
`
30

20

10

0
19.0

38,1
0,074

25,4
2.00
0,105

4,75
0,850

9.5
0,250

0,425

Sieve Size ( mm )

Mengetahui : Diperiksa dan disetujui oleh : Diajukan oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
FIELD DENSITY TEST - by WATER METHOD (ASTM D5030-89)
( Relative Density )

Date of Test 15-May-23 Tested by Lab WIKA-BK


Location Trial Embankment Checked by
Material Filter Halus Layer 2

Test No 1 2
Passing 6 6
Before Compaction 40 40
Thickness
After Compaction 32.3 32.3
FIELD DENSITY DETERMINATION
a Berat awal air dalam ring ( gr ) 15310 15245
b Berat sisa air ( gr ) 8460 7460
c Berat air dalam ring ( a-b ) ( gr ) 6850 7785
( gr ) 41665 43655
Berat Sampel dari lubang
d ( gr ) 14690 42000
Total berat Sampel dari lubang ( gr ) 56355 85655
( gr ) 30775 32085
Berat Air Terpakai
e ( gr ) 16720 29910
Total Berat Air Terpakai ( gr ) 47495 61995
f Sisa air ( gr ) 8080 6770
g Total Berat Air Dalam Lubang + Ring ( e-f ) ( gr ) 39415 55225
h Berat Air Dalam Lubang ( g-c) ( gr ) 32565 47440
i Wet density ( d/h ) (t/m3) 1.731 1.806
j Kadar Air (%) 8.23 8.76
k Dry density (100 x i) /(j +100) (t/m3) 1.599 1.660
RELATIVE DENSITY
l Lab Max Dry Density (t/m3) 1.666 1.666
m Lab Min Dry Density (t/m3) 1.325 1.325
D VALUE
n lx(k-m) 0.456 0.558
o kx(l-m) 0.545 0.566
p D Value (%) 83.72 98.63
q Pecification Minimum Dry Density (%) > 70 %
WATER CONTENT
Dish No.
a Mass of wet soil + dish ( gr ) 592 770
b Mass of dry soil + dish ( gr ) 547 708
c Mass of dish ( gr ) 0 0
d Mass of water (a-b) ( gr ) 45 62
e Mass of dry soil (b-c) ( gr ) 547 708
f Moisture content (d / e ) x100 (%) 8.23 8.76

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
Tes Permeabilitas Lapangan (FPT)
(Constant Head Method )
Date of Test 15-May-23 Tested by Lab WIKA-BK
Location Trial Embankment Checked by
Material Filter Halus Layer 2
1 Passing 6
2 No. Tes 1 2 3
3 Diameter Lubang Tes d cm 50.00 50.00 50.00
4 r = 1/2 x d r cm 25.00 25.00 25.00
5 Volume of Air V cc 1000 1000 1000
6 Tinggi Air H cm 36.00 36.00 36.00
7 Waktu t detik 21.89 19.52 22.06
8 [8] / [10] Q cc/detik 45.683 51.230 45.331
9 [9] / [7] H/r 1.4400 1.4400 1.4400
2 2
10 [12] (H/r) 2.0736 2.0736 2.0736
2
11 1 + [13] 1+ (H/r) 1.7532 1.7532 1.7532
2
12 [12] + [14] H/r + 1+ (H/r) 3.1932 3.1932 3.1932
13 [9] * log(e) [15] 41.7965 41.7965 41.7965
14 [7]2 + [9]2 r2 + H2 43.8292 43.8292 43.8292
15 [16] - [17] + [7] 22.9673 22.9673 22.9673
16 2 p [9]3 293148.3 293148.3 293148.3
17 [11] / [19] 1.56E-04 1.75E-04 1.55E-04
18 [18]*[20] KT cm/detik 0.003579 0.004014 0.003552
o
19 Suhu T C 28 28 28
20 mT (poises) 0.00836 0.00836 0.00836
21 m o
20 C 0.01009 0.01009 0.01009
22 [23] / [24] 0.82854 0.82854 0.82854
o
23 K 20 C = [21] x [25] cm/sec 2.97E-03 3.33E-03 2.94E-03
o
24 Rata-rata K 20 C cm/sec 3.08E-03
d
Note : (Q1 - Q2)   5% of Q1, H/r > 1 Alat
pengukur
kedalaman

(Q2 - Q3)   5% of Q2 air


bit
De s tan
n
ko
Q

Rumus:

K=
Q
[H Log(e) { H
+ 1+ ( r)2
H
}- r2 + H2 + r ]
2p H3 r H
Gravel

Ref. : Suyono Sosrodarsono-Kensaku Takeda, BTU, Hal. 66.


D
Turunan dari USBR 7300-89

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAU SIMEME (MYC) (PAKET I)
SIEVE ANALYSIS (ASTM C-136)

Tanggal Pengujian : 15-May-23 Sampel No. : 2


Material : Filter (Zona 2a) Diuji Oleh : LAB. WIKA-BK
Asal Material : ex Sungai Wampu Diperiksa Oleh :

Sampel 1 Sampel 2
Weight Total
Weight total sample 1202 gram gram
sample
Sieve Cumulative Percent Cumulative Percent Remarks
Size Wt.Sample % Retained Passing Wt.Sample % Retained Passing
mm (gr) (gr) (%) (gr) (gr) (%)
76.0 0 0.00 100.00
50.8 0 0.00 100.00
38.1 0 0.00 100.00
25.4 0 0.00 100.00
19.0 0 0.00 100.00
9.5 18 1.50 98.50
4.75 40 3.33 96.67
2.00 90 7.49 92.51
0.850 178 14.81 85.19
0.425 497 41.35 58.65
0.250 934 77.70 22.30
0.106 1173 97.59 2.41
0.074 1188 98.84 1.16

0.07 0.7 Curva Gradasi 7


100

90

80

70
Percentage passing

60

50

40
`
30

20

10

0
19.0

38,1
0,074

25,4
2.00
0,105

4,75
0,850

9.5
0,250

0,425

Sieve Size ( mm )

Mengetahui : Diperiksa dan disetujui oleh : Diajukan oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
FIELD DENSITY TEST - by WATER METHOD (ASTM D5030-89)
( Relative Density )

Date of Test 15-May-23 Tested by Lab WIKA-BK


Location Trial Embankment Checked by
Material Filter Halus Layer 2

Test No 1 2
Passing 8 8
Before Compaction 40 40
Thickness
After Compaction 31.1 31.1
FIELD DENSITY DETERMINATION
a Berat awal air dalam ring ( gr ) 15580 15880
b Berat sisa air ( gr ) 9500 9555
c Berat air dalam ring ( a-b ) ( gr ) 6080 6325
( gr ) 42210 46525
Berat Sampel dari lubang
d ( gr ) 34875 40380
Total berat Sampel dari lubang ( gr ) 77085 86905
( gr ) 34300 33550
Berat Air Terpakai
e ( gr ) 26570 26195
Total Berat Air Terpakai ( gr ) 60870 59745
f Sisa air ( gr ) 7570 3285
g Total Berat Air Dalam Lubang + Ring ( e-f ) ( gr ) 53300 56460
h Berat Air Dalam Lubang ( g-c) ( gr ) 47220 50135
i Wet density ( d/h ) (t/m3) 1.632 1.733
j Kadar Air (%) 7.31 6.35
k Dry density (100 x i) /(j +100) (t/m3) 1.521 1.630
LABORATORY TEST
l Lab Max Dry Density (t/m3) 1.666 1.666
m Lab Min Dry Density (t/m3) 1.325 1.325
RELATIVE DENSITY DETERMINATION
n lx(k-m) 0.327 0.508
o kx(l-m) 0.519 0.556
p D Value (%) 63.05 91.41
q Pecification Minimum Dry Density (%) > 70 %
WATER CONTENT
Dish No.
a Mass of wet soil + dish ( gr ) 661 553
b Mass of dry soil + dish ( gr ) 616 520
c Mass of dish ( gr ) 0 0
d Mass of water (a-b) ( gr ) 45 33
e Mass of dry soil (b-c) ( gr ) 616 520
f Moisture content (d / e ) x100 (%) 7.31 6.35

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAUSIMEME KAB. DELI SERDANG (MYC) (PAKET I)
Tes Permeabilitas Lapangan (FPT)
(Constant Head Method )
Date of Test 15-May-23 Tested by Lab WIKA-BK
Location Trial Embankment Checked by
Material Filter Halus Layer 2
1 Passing 8
2 No. Tes 1 2 3
3 Diameter Lubang Tes d cm 50.5 50.5 50.5
4 r = 1/2 x d r cm 25.25 25.25 25.25
5 Volume of Air V cc 1000 1000 1000
6 Tinggi Air H cm 40.00 40.00 40.00
7 Waktu t detik 13 14.21 15.14
8 [8] / [10] Q cc/detik 76.923 70.373 66.050
9 [9] / [7] H/r 1.5842 1.5842 1.5842
2 2
10 [12] (H/r) 2.5096 2.5096 2.5096
2
11 1 + [13] 1+ (H/r) 1.8734 1.8734 1.8734
2
12 [12] + [14] H/r + 1+ (H/r) 3.4575 3.4575 3.4575
13 [9] * log(e) [15] 49.6223 49.6223 49.6223
14 [7]2 + [9]2 r2 + H2 47.3029 47.3029 47.3029
15 [16] - [17] + [7] 27.5694 27.5694 27.5694
16 2 p [9]3 402123.9 402123.9 402123.9
17 [11] / [19] 1.91E-04 1.75E-04 1.64E-04
18 [18]*[20] KT cm/detik 0.005274 0.004825 0.004528
o
19 Suhu T C 28 28 28
20 mT (poises) 0.00836 0.00836 0.00836
21 m o
20 C 0.01009 0.01009 0.01009
22 [23] / [24] 0.82854 0.82854 0.82854
o
23 K 20 C = [21] x [25] cm/sec 4.37E-03 4.00E-03 3.75E-03
o
24 Rata-rata K 20 C cm/sec 4.04E-03
d
Note : (Q1 - Q2)   5% of Q1, H/r > 1 Alat
pengukur
kedalaman

(Q2 - Q3)   5% of Q2 air


bit
De s tan
n
ko
Q

Rumus:

K=
Q
[H Log(e) { H
+ 1+ ( r)2
H
}- r2 + H2 + r ]
2p H3 r H
Gravel

Ref. : Suyono Sosrodarsono-Kensaku Takeda, BTU, Hal. 66.


D
Turunan dari USBR 7300-89

Diketahui Oleh : Diperiksa & Disetujui Oleh : Dibuat Oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR
PROYEK PEMBANGUNAN BENDUNGAN LAU SIMEME (MYC) (PAKET I)
SIEVE ANALYSIS (ASTM C-136)

Tanggal Pengujian : 15-May-23 Sampel No. : 2


Material : Filter (Zona 2a) Diuji Oleh : LAB. WIKA-BK
Asal Material : ex Sungai Wampu Diperiksa Oleh :

Sampel 1 Sampel 2
Weight Total
Weight total sample 1317 gram gram
sample
Sieve Cumulative Percent Cumulative Percent Remarks
Size Wt.Sample % Retained Passing Wt.Sample % Retained Passing
mm (gr) (gr) (%) (gr) (gr) (%)
76.0 0 0.00 100.00
50.8 0 0.00 100.00
38.1 0 0.00 100.00
25.4 0 0.00 100.00
19.0 0 0.00 100.00
9.5 27 2.05 97.95
4.75 48 3.64 96.36
2.00 100 7.59 92.41
0.850 188 14.27 85.73
0.425 578 43.89 56.11
0.250 1082 82.16 17.84
0.106 1294 98.25 1.75
0.074 1303 98.94 1.06

0.07 0.7 Curva Gradasi 7


100

90

80

70
Percentage passing

60

50

40
`
30

20

10

0
19.0

38,1
0,074

25,4
2.00
0,105

4,75
0,850

9.5
0,250

0,425

Sieve Size ( mm )

Mengetahui : Diperiksa dan disetujui oleh : Diajukan oleh :


PU BWS S II KONSULTAN SUPERVISI KONTRAKTOR