The document is a bill of materials and cost estimate for the construction of an Eco-Chalk Factory located in Brgy. Dalahican, Lucena City. It provides a breakdown of the total construction cost of 7,029,544.51 Philippine Pesos across seven categories: general requirements/siteworks, structural works, architectural works, plumbing and sanitary works, electrical works, auxiliary works, and fire protection works. The document was prepared by Engineer Joseph L. Domingo.
The document is a bill of materials and cost estimate for the construction of an Eco-Chalk Factory located in Brgy. Dalahican, Lucena City. It provides a breakdown of the total construction cost of 7,029,544.51 Philippine Pesos across seven categories: general requirements/siteworks, structural works, architectural works, plumbing and sanitary works, electrical works, auxiliary works, and fire protection works. The document was prepared by Engineer Joseph L. Domingo.
The document is a bill of materials and cost estimate for the construction of an Eco-Chalk Factory located in Brgy. Dalahican, Lucena City. It provides a breakdown of the total construction cost of 7,029,544.51 Philippine Pesos across seven categories: general requirements/siteworks, structural works, architectural works, plumbing and sanitary works, electrical works, auxiliary works, and fire protection works. The document was prepared by Engineer Joseph L. Domingo.
Owner: ECO-CHALK MANUFACTURING CORPORATION Subject: BILL OF MATERIALS AND COST ESTIMATE
SUMMARY TOTAL (Php)
I. GENERAL REQUIREMENTS / SITEWORKS 409,026.56
II. STRUCTURAL WORKS 2,872,655.46 III. ARCHITECTURAL WORKS 2,331,442.04 IV. PLUMBING AND SANITARY WORKS 378,725.63 V. ELECTRICAL WORKS 577,706.54 VI. AUXILLIARY WORKS 119,979.12 VII. FIRE PROTECTION WORKS 340,009.15
TOTAL CONSTRUCTION COST 7,029,544.51
Prepared by:
Engr. Joseph L. Domingo
Civil Engineer
PRC: 120593 TIN: 270-445-754-000 PTR: 1106360 Date Issued: Jan.12,2021 Issued at: Lucena City