Professional Documents
Culture Documents
2023.5.2 Memo To PB Re SGLGB Requirements
2023.5.2 Memo To PB Re SGLGB Requirements
MEMORANDUM
This pertains to the CY 2023 Seal of Good Local Governance for Barangay (SGLGB)
covering the 2022 performance.
The barangay through the barangay secretary is hereby directed to submit the
accomplished and duly signed Data Capture Form (SGLGB Form No. 1) and means
of verifications (MOVs) through the following links on or before May 15, 2023.
Zone Link
1-9 bit.ly/SGLGZone1-9
10-16 bit.ly/SGLGBZone10-16
DILGCAL/RAJ/AFFJR/Lea
Annual Report
• Barangay Financial Report
• Barangay Budget
• Summary of Income and
Expenditures
• 20% Component of the IRA
Utilization
• Annual Procurement Plan or
Procurement List
Quarterly Report
• List of Notices of Award (4th
Quarter of CY 2022)
Monthly Report
• Itemized Monthly Collections and
Disbursements (October-
December 2022)
1.1.2 Accomplished prescribed BFR Barangay Financial Report on Statement
form with the "stamp receipt" of the of Receipt and Expenditure (Annex 7)
Office of the C/M Accountant.
1.2 INNOVATIONS IN REVENUE GENERATION OR EXERCISE OF
CORPORATE POWERS
1.2.1 Increase in local resources in CY Barangay Budget Form 2: Actual Income
2022 and Expenditure CY 2022 and 2021
1.3 APPROVAL OF THE BARANGAY BUDGET ON THE SPECIFIED
TIMEFRAME
1.3.1 Presence of a Barangay Approved Barangay Appropriation
Appropriation Ordinance approved on or Ordinance (approved on or before
before December 31, 2021. December 31, 2021)
1.4 ALLOCATION FOR STATUTORY PROGRAMS AND PROJECTS AS
MANDATED BY LAWS AND/OR OTHER ISSUANCES
1.4.1 With allocated funds for the Approved Barangay Appropriation
following statutory programs and Ordinance (approved on or before
projects: December 31, 2021)
1.6.1.2 If the barangay does not have 12 monthly deposit slips reflecting the
Barangay-SK Agreement but with Account No./Name of Barangay SK
current account
1.6.1.3 If the barangay does not have SK a) Proof of transfer of the 10% SK fund
Officials or with SK Officials but no to the trust fund of the barangay such as
quorum and/or No SK Bank Account: deposit slip or Official Receipt or
corresponding legal form/document
issued by the city/municipal treasurer if
the barangay opted that the
corresponding SK fund be kept as a trust
fund in the custody of the C/M treasurer.
OR
2.1.4 b. At least 50% fund utilization of Annual Report on the Utilization of the
the 70% component of the CY 2022 LDRRMF
LDRRMF - Preparedness component as
of December 31, 2022.
2.2 EXTENT OF RISK ASSESSMENT AND EARLY WARNING SYSTEM (EWS)
2.2.1 Conducted an activity in relation to Post-activity Report of activities such as
Risk Assessment in the barangay not Contingency Planning, Climate, and
earlier than 2019 Disaster Risk Assessment, Participatory
Disaster Risk Assessment, BDRRM
Planning, etc.
2.2.2 A Certified Risk Map Photo Documentation of the certified
Barangay Risk Map
2.2.3 An established Early Warning Photo documentation of the EWS
System for the top two (2) hazards
present in the barangay
2.3 EXTENT OF PREPAREDNESS FOR EFFECTIVE RESPONSE AND
RECOVERY
2.3.1 A barangay must have a Photo documentation of the
permanent or alternate evacuation permanent/alternate evacuation center
center
2.3.2 A barangay must have the Photo documentation of disaster
following disaster supplies/equipment supplies equipment
a) Communication equipment (i.e.2-way
radio, mobile phone
b) Rescue vehicle/barangay patrol
c) Generator set/alternative sources of
energy
d) First aid kit
e) Flashlight with batteries
f) Personal Protective Equipment
OR
OR
OR
OR
OR