This document contains a schedule for remaining construction activities on a project from January 2023 to March 2023. It includes 12 activities related to installations, plastering, painting, tiling, landscaping, walls and roofing. The schedule outlines the planned and actual start and end dates for each activity, along with current status and duration in days.
This document contains a schedule for remaining construction activities on a project from January 2023 to March 2023. It includes 12 activities related to installations, plastering, painting, tiling, landscaping, walls and roofing. The schedule outlines the planned and actual start and end dates for each activity, along with current status and duration in days.
This document contains a schedule for remaining construction activities on a project from January 2023 to March 2023. It includes 12 activities related to installations, plastering, painting, tiling, landscaping, walls and roofing. The schedule outlines the planned and actual start and end dates for each activity, along with current status and duration in days.
16-Jan-23 January January January February February February February March March March S.No. Activity Plan started Plan End 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Actual start Actual End Duration Status Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Sa Su 6-Feb-23 8-Feb-23 X X X 1 Installation of the gypsum bord and drop ceilings 3 Not started Intallation of all electrical line fixing and accesories installation 26-Jan-23 1-Feb-23 X X X X X X X 2 (including wiring) 6 In progress 26-Jan-23 5-Feb-23 X X X X X X X X X X X 3 Installation of all PPR and PVC pipes including accessories 9 In progress 17-Jan-23 23-Jan-23 X X X X X X X 4 Finalizing all remaining plastering work 6 In progress Finalizing all the painting work ( Includes White washing, stucco 13-Feb-23 12-Mar-23 X X X X X X X X X X X X X X X X X X X X X X X X X X X X 5 and sand paper ) 24 In progress 17-Jan-23 17-Jan-23 X 6 septic tank construction 1 In progress 26-Feb-23 13-Mar-23 X X X X X X X X X X X X X X X X 7 Tiling work for floors and walls 14 Not started 2-Feb-23 5-Feb-23 X X X X 8 Natural stone installation 3 Not started 24-Jan-23 31-Jan-23 X X X X X X X X 9 Landscape work 7 Not started 30-Jan-23 9-Feb-23 X X X X X X X X X X X 10 Finalizing all Boundary wall works 10 In progress 6-Mar-23 24-Mar-23 X X X X X X X X X X X X X X X X X X X 11 Window and door installation (includes main get fixing) 16 Not started 14-Mar-23 16-Mar-23 X X X 12 Water proofing work on the roof floor 3 Not started LEGEND