PART 1 - GENERAL

1.01 SECTION INCLUDES


DESCRIPTION

A. Parapet, cap, sill, and lintel, flashing.

B. Counter flashings over base flashing.

C. Counter flashing for roof mounted equipment and vent stacks.

1.02 RELATED SECTIONS


DATE JOB/EWO

A. Section 07220 Roof and Deck Insulation.

B. Section 07531 Roofing System.


REV.
NO.

C. Section 07820 Metal Framed Skylights.


DISCIPLINE
ENGINEER D. Section 07920 Sealant and Caulking.
__ ________ _
 DATE: ________ E. Section 09900 Painting: Prime and finish painting. 
PROJECT
ENGINEER
F. Section 01532 LEED Requirements
____________
DATE ______

CERTIFIED G. Section 01524 – Construction Waste Management

_ __________
DATE: ________
1.03 REFERENCES
CONSTRUCTION
AGENCY
________________
A. ASTM A525 Steel Sheet, Zinc Coated, (Galvanized) by the
DATE: _________ Hot-Dip Process.
OPERATIONS

______________ B. ASTM B32 Solder Metal.


DATE:_________

C. ASTM B209 Aluminum and Alloy Sheet and Plate.


APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

D. FS O-F-506 Flux, Soldering, Paste and Liquid.


Date:
By:

E. NRCA (National Roofing Contractors Association) –


Roofing Manual.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

F. SMACNA Architectural Sheet Metal Manual.


REVISION CERTIFICATION

1.04 SUBMITTALS
SECTION 07620

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 1
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 4
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

A. Submit under provision of Saudi Aramco Contract Documents.


CERT

B. Shop Drawings: Indicate material profile, jointing pattern, jointing


ENG’G

details, fastening methods, flashing, termination's, and installation


details.

C. LEED Submittal
1. Product Data for Credit EQ 4.2: For Paintings and Coatings used at
DESCRIPTION

Project site, including printed statement of VOC content

1.05 QUALITY ASSURANCE

A. Perform work in accordance with AISI CDA SMACNA standard details


and requirements.

1.06 QUALIFICATIONS
DATE JOB/EWO

A. Fabricator and Installer: Company specializing in sheet metal flashing


work with 2 years experience.
REV.
NO.

1.07 DELIVERY, STORAGE, AND HANDLING


DISCIPLINE
ENGINEER A. Deliver, store, protect and handle products to site under provisions of
__ ________ _
Saudi Aramco Contract Documents.
 DATE: ________ 
PROJECT B. Stack preformed and prefinished material to prevent twisting, bending,
ENGINEER
or abrasion, and to provide ventilation. Slope metal sheets to ensure
____________
DATE ______ drainage.
CERTIFIED
C. Prevent contact with materials which may cause discoloration or
_ __________ staining.
DATE: ________

CONSTRUCTION
AGENCY
PART 2 - PRODUCTS
________________
DATE: _________ 2.01 SHEET MATERIALS
OPERATIONS

______________ A. Galvanized Steel: ASTM A446, Grade A, G90 zinc coating; 24 gauge
DATE:_________
(0.6 mm) core steel.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION

2.02 ACCESSORIES
EDSD

A. Fasteners: Galvanized steel, with soft neoprene washers.


Date:
By:

B. Primer: Zinc chromate or Galvanized iron type.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

C. Protective Backing Paint: Zinc chromate alkyd.


REVISION CERTIFICATION

D. Down spout Supports: Brackets. Straps.


SECTION 07620

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 2
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 4
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

E. Solder: ASTM B32; 50/50 type.


CERT

F. Flux: FS O-F-506.
ENG’G

2.03 COMPONENTS

A. Accessories: Profiled to suit gutters and down spouts.


DESCRIPTION

B. Splash Pads: Precast concrete type, of size and profiles indicated;


minimum 3000psi (20 MPa) at 28 days, with minimum 5 percent air
entrainment.

C. Down spout Galvanized Steel.

2.04 FINISH
DATE JOB/EWO

A. Back paint concealed metal surfaces with protective backing paint to a


minimum dry film thickness of 15 mic (0.6 mils).

B. All paintings and Coatings, Adhesives and Sealants shall be compliant


REV.
NO.

with Section 01352 – LEED Requirements.


DISCIPLINE
ENGINEER PART 3 - EXECUTION
__ ________ _
 DATE: ________ 3.01 EXAMINATION 
PROJECT
ENGINEER
A. Verify roof openings, curbs, pipes, sleeves, ducts, or vents through roof
____________
DATE ______ are solidly set, reglets in place, and nailing strips located.
CERTIFIED
B. Verify roofing termination and base flashing are in place, sealed, and
_ __________ secure.
DATE: ________

CONSTRUCTION
AGENCY
3.02 PREPARATION
________________
DATE: _________ A. Install starter and edge strips, and cleans before starting installation.
OPERATIONS

______________ 3.03 INSTALLATION


DATE:_________

A. Conform to drawing details included in the SMACNA manual.


APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

B. Secure flashing in place using concealed fasteners. Use exposed


fasteners only where approved by Company Representative.
Date:
By:

C. Apply plastic cement compound between metal flashing and felt


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________

flashing.
REVISION CERTIFICATION

D. Fit flashing tight in place. Make corners square, surfaces true and
straight in planes, and lines accurate to profiles.
SECTION 07620

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 3
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 4
15-May-10 
Saudi Aramco 2616-ENG (3/99) 
OPERNS.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY

E. Solder metal joints for full metal surface contact. After soldering, wash
CERT

metal clean with neutralizing solution and rinse with water.


ENG’G

F. Secure gutters and down spouts in place using fasteners.

G. Slope gutters 1/8 inch per foot (10 mm/m) minimum.

H. Seal connections watertight


DESCRIPTION

I. Set splash pads under down spouts.

J. Seal metal joints watertight.

3.04 FIELD QUALITY CONTROL

A. Inspection will involve surveillance of work during installation to


DATE JOB/EWO

ascertain compliance with specified requirements.

END OF SECTION
REV.
NO.

DISCIPLINE
ENGINEER

__ ________ _
 DATE: ________ 
PROJECT
ENGINEER
____________
DATE ______

CERTIFIED

_ __________
DATE: ________

CONSTRUCTION
AGENCY
________________
DATE: _________

OPERATIONS

______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD

Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO.________

(DCC) NO.: __________________________


REVISION CERTIFICATION

SECTION 07620

CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

KING ABDULLAH PETROLEUM STUDIES DOC


K55 A VE-425113 4
AND RESEARCH CENTER OF 00
RIYADH SAUDI ARABIA JOB/EWO# BI-25-00013 4
15-May-10 

You might also like