DETAILED ENGINEERING ESTIMATE (DUPA)

Item No./Description : 1 Example Item


Unit of Measurement : l.s.
Output per Hour : 1 l.s.

Description No. of Person/s No. of Hour/s

A. Labor
a.
b.
c.

Sub - Total for A

Name and Capacity No. of Unit/s No. of Hour/s

B. Equipment

a.
b.
c.
d.
e.
f.
g.

Sub - Total for B


C. Total (A + B)
D. Output per Hour = 1.00
E. Direct Unit Cost (C + D)
Hourly Rate Amount (Php)

Hourly Rate Amount (Php)


ITEM NO. DESCRIPTION UNIT UNIT PRICE
A. MATERIALS
Tarpaulin 8'x8'
Lumber, Good
Marine Plywood (1/2"x4'x8')
Assorted CWN (1kg/100 bd.ft. of Lumber)
Aggregate Subbase Course
Aggregate Base Course
Reinforcing Steel Bar, Grade 40
Asphalt Sealant
Steel Forms (Rental)
Sand
Gravel
Cement
Concrete Saw (diamond blade 14")
Grease/Tar
R.C. Pipes (910mm dia.)
Sand Bedding/Selected Sandy Soil
One Bagger Mixer
Water Truck (1000 gal)
Minor Tools (5% of Labor)
Safety Helmet
Safety Shoes
Safety Gloves
Safety Vest
Rain Coats
Dust Mask
Eye Google
Ear Muff
Rubber Boots

B. EQUIPMENT COST
Cargo Truck (10T, 270Hp)
Dump Truck (12 yd.cu.)
Dump Truck (10 cu.m.)
Transit Mixer (5 yd.cu.)
Motorized Road Grader, G710A
Water Truck/Pump (16000L)
Payloader (1.5 cu.m)
Payloader (1.5 cu.m) - at disposal area
Bulldozer, D6H SeriesII
Backhoe w/ Breaker (0.80 cu.m)