Professional Documents
Culture Documents
Saudi Aramco Oil Company: SECTION 03210 Epoxy Coated Concrete Reinforcement
Saudi Aramco Oil Company: SECTION 03210 Epoxy Coated Concrete Reinforcement
OPERNS.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
SECTION 03210
CERT
SUBSECTION INDEX
PART 1 - GENERAL
DESCRIPTION
PART 2 - PRODUCTS
2.01 Materials
DATE JOB/EWO
PART 3 - EXECUTION
REV.
NO.
3.01 Installation
DISCIPLINE
ENGINEER 3.02 Repair of Coated Bars
__ ________ _
DATE: ________
PROJECT PART 1 - GENERAL
ENGINEER
____________
DATE ______ 1.01 Description of Work
CERTIFIED
A. The work of this Section includes furnishing, fabrication and
_ __________ placement of reinforcement with protective epoxy coatings for
DATE: ________
cast-in-place concrete and precast concrete, including bars, ties
CONSTRUCTION
AGENCY
and supports. The coatings shall be applied by the electrostatic
________________
spray method.
DATE: _________
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
specified.
B. Mill Certificates:
EDSD
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
C. Shop Drawings:
CERT
D. LEED Submittals
1. Product Data for LEED Credit MR 4.1 and Credit MR 4.2:
For products having recycled content, documentation
indicating percentages by weight of postconsumer and
preconsumer recycled content. Include statement
indicating costs for each product having recycled content.
DATE JOB/EWO
DISCIPLINE
ENGINEER 1.04 Delivery, Handling and Storage
__ ________ _
DATE: ________ A. Deliver epoxy coated reinforcement to the project site bundled,
PROJECT tagged and marked. Use metal tags indicating bar size, lengths,
ENGINEER
and other information corresponding to markings shown on
____________
DATE ______ placement diagrams.
CERTIFIED
B. Store epoxy coated concrete reinforcement materials at the site in
_ __________ protected racks above ground in an approved manner so as to
DATE: ________
avoid damage to the coating. Direct metal to coating contact shall
CONSTRUCTION
AGENCY
be avoided wherever possible.
________________
DATE: _________ C. Equipment for handling epoxy coated bars shall have padded
OPERATIONS contact areas. Bundles shall be lifted with strongback or have
______________ multiple supports to prevent bar-to-bar abrasion from sags in the
DATE:_________
bundle. Bars or bundles shall not be dragged or dropped. Any
coating damaged due to handling, shipment and placing shall be
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
Date:
By:
PART 2 - PRODUCTS
OF THIS DRAWING IS COVERED, FOR ALL
2.01 Materials
REVISION CERTIFICATION
A. All reinforcing bars shall be deformed and shall comply with the r
equirements of ASTM A615 and as follows:
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
__ ________ _
4. Over waterproofing membranes, use precast concrete
DATE: ________ chairs to prevent penetration of the membrane.
PROJECT
ENGINEER
E. Recycled Content of Steel Products: Provide products with an
____________
DATE ______ average recycled content of steel products so postconsumer
CERTIFIED recycled content plus one-half of preconsumer recycled content is
not less than 60 percent.
_ __________
DATE: ________
CONSTRUCTION
AGENCY
2.02 Epoxy Coating
________________
DATE: _________ A. MATERIAL:
OPERATIONS
Aramco.
EDSD
B. Coating Application
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
1. Surface Preparation:
CERT
CERTIFIED
4. Continuity of Coating:
holidays.
EDSD
6. Flexibility of Coating:
REVISION CERTIFICATION
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
CONSTRUCTION
AGENCY
3. Plant Inspection:
________________
DATE: _________ a. Saudi Aramco reserves the right to have its
OPERATIONS authorized representative observe the preparation,
______________ coating and testing of the reinforcing bars. The
DATE:_________ representative shall free access to the plant and
any work done when access has been denied shall
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
be automatically rejected.
EDSD
2.03 Fabrication
REVISION CERTIFICATION
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
3.01 Installation
DISCIPLINE
ENGINEER
__ ________ _
A. Comply with the Concrete Reinforcing Steel Institute (CRSI)
DATE: ________ recommended practice for placing reinforcing bars, for details and
PROJECT methods of reinforcement placement and supports, and as herein
ENGINEER
specified for reinforced concrete construction.
____________
DATE ______
CERTIFIED
B. Clean reinforcement to remove dirt and other materials which
reduce or destroy bond with concrete.
_ __________
DATE: ________
C. Place reinforcement to obtain the minimum concrete cover as
CONSTRUCTION
AGENCY
specified. Arrange, space, and securely tie bars supports and
________________
reinforcement together with 1.52 mm diameter coated wire to hold
DATE: _________ reinforcement accurately in position during concrete placement
OPERATIONS operations. Set wire ties so that twisted ends are directed away
______________ from exposed concrete surfaces.
DATE:_________
beyond the last leg of any continuous bar support. Do not use
supports as basses for runways for concrete conveying equipment
Date:
By:
Minimum lap for bar splices shall be as noted on the plans. Bar
splices shall be made by lapping ends, placing bars in contact,
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
CERTIFIED
_ __________
DATE: ________
CONSTRUCTION
AGENCY
________________
DATE: _________
OPERATIONS
______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL
Section 03210
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. REV. NO.