WAP/INFRA/KERALA/2023/GMKY/452

Annexure –XII
Information Required to Calculate the BID Capacity

1. To Calculate the Value of “A”

A table containing value of Civil Engineering Works in respect to Projects (Turnkey Projects/
Item rate contract/ Construction works) undertaken by the Bidder during the last 5 Years is
as follows:

Sl.No. Year Value of Civil Engineering Works


undertaken w.r.t projects (Rs. In Crores)

1 2021-22
2 2020-21
3 2019-20
4 2018-19
5 2017-18

Maximum Value of projects that have been undertaken during the F.Y………
out of the last 5 Years and value there of is Rs………. Crore (Rupees
). Further, value updated to the price level of the Year indicated in Appendix is as follows:

Rs. ……. Crores X ………… (Updation Factor as per Appendix) = Rs. ….


Crores (Rupees ……………………………………………………….. )

………………… …………………..

…........................ ..…………………

Authorised Signator

For and on behalf of …………..(Name Name of the Statutory Auditor’s Firm Seal of the
Signatory) of the Bidder ) audit firm: (Signature, name and designation
and Membership No. of authorised Signatory).

143
WAP/INFRA/KERALA/2023/GMKY/452

2. To Calculate the value of “B”

A table containing value of all the existing commitments and on-going workings to be
completed during the next Years is as follows:

Sl. Name Percentage Dater of Value of Value Balance Anticip Balance


of of start / contract of value of ated value of
No
project participatio appointe as per work work to be date of work at
.
/ work n of Bidder d date of Agreemen compl completed comple 2021-22
in the project t / LOA eted tion price
project level

Rs. In Rs. In Rs. In Rs. In


Crore Crore Crore Crore

1 2 3 4 5 6 7=(5-6) 8 9(3x7xuf)

Updation Factor as given below:

For Year F.Y / Calender Year Updation Factor

1 2021-22 1.00

2 2020-21 1.05

3 2019-20 1.10

4 2018-19 1.15

5 2017-18 1.20

The Statement showing the value of allexisting commitments and ongoing works as well as the
stipulated period of completion remaining for each of the works mentioned above is verified
from the certificate issued that has been countersigned by the client or its Engineer-in-charge
not below the rank of Executive Engineer or equivalent in respect of projects or Concessionaire
/ Authorised Signatory of SPV in respect of BOT Projects. No awarded / ongoing works has
been left in the aforesaid statement which has been awarded to M/s…………. individually / and
other member M/s …………….. and M/s ……………, as on due date of this tender.

144
WAP/INFRA/KERALA/2023/GMKY/452

………………… …………………..

…........................ ..…………………

Authorised Signatory

For and on behalf of …………..(Name Name of the Statutory Auditor’s Firm Seal of the
Signatory) of the Bidder ) audit firm: (Signature, name and designation
and Membership No. of authorised Signatory).