Parcel9 @ ETV Micron Electricals

CONTRACTOR:

Micron Electricals
PROJECT:

EMBASSY TECH VILLAGE PARCEL 9,


BENGALURU

Document:

METHOD STATEMENT

For

Installation of Transformer

SIGNATURE:

NAME: SHRISHAIL R ARABALLI

DATE: 30.12.2019

Page 1 of 4
Parcel9 @ ETV Micron Electricals

MICRON ELECTRICALS SYNERGY EMBASSY GROUP

METHOD STATEMENT
TITLE: INSTALLATION OF TRANSFORMER DATE: 30.12.2019

EMBASSY TECH VILLAGE PARCEL 9,


PROJECT:
BENGALURU

CLIENT: EMBASSY GROUP REF No: EMBASSY / MS / 14 Rev: 00

This Method Statement is to give instructions regarding the unloading, Installation &
PURPOSE:
Testing of Transformer at the Project Site.

RESOURCES:
MATERIALS /
Crane, Drilling Machines, Electrician Tool Box, Spirit Level, Crimping Tool,
PLANT /
Welding Machine, Testing equipment’s.
TOOLS:
MAN POWER Engineers, Electricians, Skilled / Semi-skilled Workers, Helpers.

DRAWINGS Approved GFC / Shop Drawings


Quality Formats as required for Installation, Testing & Commissioning., and
DOCUMENTS:
O&M manuals.

Sl.
RESPONSIBILITY ACTIVITY DESCRIPTION
No.

1 Site Supervisor / Unloading Of  Get necessary permits to bring and unload


Safety supervisor Transformer
the transformer. Ensure that Packing List,
Test Certificates, etc., are available.
 Identify the area for unloading & storing
Transformer near to the final location.
 Unload the transformer at the designated
area safely with the help of Tripod or
Crane.
 Check the transformer for any visible
damage.
 Mark the final location for the installation
of the transformer as per the Approved

Page 2 of 4
Parcel9 @ ETV Micron Electricals

Drawing.
 At the time of installation, move the
transformer carefully with a crane to the
identified location for installation.
 Take adequate care to ensure that
transformer is not damaged during
movement and also ensure safety of the
personnel handling the transformer.
Sl.
RESPONSIBILITY ACTIVITY DESCRIPTION
No.

2 Project Engineer / Installation SHIFTING OF TRANSFORMER


Site Supervisor /  Transformer will be lifted / shifted desired
Safety supervisor
location by means of crane.
INSTALLATION OF TRANSFORMER
 Take necessary permits from the competent
authority to install the transformer
 Install the transformer as required on the
plinth at the position indicated in the
drawing with the help of a crane and
accessories as required.
 Align the position of transformer.

QUALITY CONTROL
TERMINATION / EARTHING / TESTING
3 Site Engineer / Installation /
 After the installation of transformer
Quality Termination /
Supervisor Testing connect the outgoing Panel cable on
transformer.
 Connect the Body Earth and Neutral Earth
Strips.
 Conduct the simulated site tests and Record
the readings in the Test Formats and get the
Approval of the concerned Engineers
 Quality Formats for Installation, Testing

Page 3 of 4
Parcel9 @ ETV Micron Electricals

and Commissioning activities to be used.


QUALITY
 Manufacturer’s Operation & Installation
CONTROL
Manual to be followed.
 Ensure that all the instructions as per this
Method Statement are followed at site.