055 - Implementation of Ageing Management Programmes and The Quantitative Effectiveness Performance Indicator
055 - Implementation of Ageing Management Programmes and The Quantitative Effectiveness Performance Indicator
AGENDA
1. INTRODUCTION
2. AGEING MANAGEMENT PROGRAMME IMPLEMENTATION
REPORT
3. PERFORMANCE INDICATOR FOR AMP
4. EXAMPLE OF CALCULATION AND ASSESSMENT OF THE KPI
5. CONCLUSIONS
AGENDA
1. INTRODUCTION
2. AGEING MANAGEMENT PROGRAMME IMPLEMENTATION
REPORT
3. PERFORMANCE INDICATOR FOR AMP
4. EXAMPLE OF CALCULATION AND ASSESSMENT OF THE KPI
5. CONCLUSIONS
Requirement 31 of SSR-2/1:
Guides the owners throughout the
lifetime of a NPP by publishing “Provision shall be made for monitoring, testing, sampling, and inspection to
assess ageing mechanisms predicted at the design stage, and to help to
identify unanticipated behaviour of the plant or degradation, that might
occur in service”
Requirement 14 of SSR-2/2:
“The operating organization shall ensure that an effective ageing
management programme is implemented to ensure that required safety
functions of systems, structures and components are fulfilled over the entire
operating lifetime of the plant”
1. INTRODUCTION
SSG-48 contains
“…a programme implemented to ensure that the effects of ageing will not prevent SSCs
from being able to accomplish required safety functions throughout the lifetime of facility
(including its decommissioning).
The programme must take into account changes that occur because of time and usage”
IDOM Nuclear Services ©2021 V5,1
6
AGENDA
1. INTRODUCTION
2. AGEING MANAGEMENT PROGRAMME IMPLEMENTATION
REPORT
3. PERFORMANCE INDICATOR FOR AMP
4. EXAMPLE OF CALCULATION AND ASSESSMENT OF THE KPI
5. CONCLUSIONS
Establishment of
AMPs
✓ Conclusions of this review should be documented. The findings, including modifications of the AMP or any
corrective actions and areas for improvement, should be addressed in a timely manner.
✓ The result of AMPIR is a perception of the AMP’s effectiveness during the analysed period.
✓ It is necessary to verify that each AMP is being developed effectively, and the definition of a well implemented
programme could be:
Programme which detects the ageing effects managed by the AMP before
a loss of intended functions of SSCs takes place.
AGENDA
1. INTRODUCTION
2. AGEING MANAGEMENT PROGRAMME IMPLEMENTATION
REPORT
3. PERFORMANCE INDICATOR FOR AMP
4. EXAMPLE OF CALCULATION AND ASSESSMENT OF THE KPI
5. CONCLUSIONS
Groups have been established to define the EAMP, considering the features of each one of them:
— Group 1: AMPs containing only periodic inspection or testing activities NPPs’ owners
Example: Flux thimble Tube Inspection
— Group 2: AMPs containing both chemical control and inspection or testing activities
Example: Fuel Oil Chemistry
— Group 3: AMPs containing only chemical control activities
Example: Water Chemistry
IDOM Nuclear Services ©2021 V5,1
14
There are different index considered in the calculation of the EAMP are:
— IACT “Activities” indicates the degree of compliance with the aims of the plant’s
activities included in the AMP:
— Inspection frequency
— Results of activities Ranges of each one from
0 to 100 points
— Evolution of degradation signals
— Corrective actions if needed
— IOE “Operational experience” shows the impact of the ageing mechanisms identified
both in own events or in external operational experiences related to the AMP.
IACT and IOE have different considerations in each of the above group, whereas
IRIP is the same for the three groups.
IDOM Nuclear Services ©2021 V5,1
15
AGENDA
1. INTRODUCTION
2. AGEING MANAGEMENT PROGRAMME IMPLEMENTATION
REPORT
3. PERFORMANCE INDICATOR FOR AMP
4. EXAMPLE OF CALCULATION AND ASSESSMENT OF THE KPI
5. CONCLUSIONS
AMP belongs to G1
Note: If during the implementation process of an AMP, non-compliance with any of its 9 attributes is identified, a Non-Conformity
will be issued, regardless of the EAMP value.
Note: If during the implementation process of an AMP, non-compliance with any of its 9 attributes is identified, Non-Conformity
will be issued, regardless of the EAMP value.
IDOM Nuclear Services ©2021 V5,1
26
Status Score
Where improvement needs have been identified, proposals for improvement have been included in the AMPIR
AGENDA
1. INTRODUCTION
2. AGEING MANAGEMENT PROGRAMME IMPLEMENTATION
REPORT
3. PERFORMANCE INDICATOR FOR AMP
4. EXAMPLE OF CALCULATION AND ASSESSMENT OF THE KPI
5. CONCLUSIONS
5. CONCLUSIONS
• A continuous improvement process is implemented in the Ageing Management Plan
• An assessment of the effectiveness of AMPs throughout a set period is recorded in the AMPIR
• A quantitative and qualitative indicator of the effectiveness of AMPs has been defined
• Qualitative indicator provides a quick and easy visualization of the status of the AMP and the
needs for AMPs improvement
Thank you
IMPLEMENTATION OF AGEING MANAGEMENT
PROGRAMMES AND THE QUANTITATIVE
EFFECTIVENESS PERFORMANCE INDICATOR
IDOM Nuclear Services ©2021 V5,1