INTEGRATION PLAN

Module Title Installing electrical metallic /non- metallic (PVC conduit)

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

1.1.1 Correct
PERFORM Install electrical drawings are
ROUGHING-IN metallic /non- interpreted based
ACTIVITIES, WIRING metallic (PVC on job
AND CABLING conduit) requirements
WORKS FOR SINGLE
PHASE
1.1.2 Correct
DISTRIBUTION, quantities of
POWER, LIGHTING conduit, fittings
AND AUXILIARY and accessories
SYSTEMS are determined
as per job
requirements

1.1.3 Tools and


equipment are
selected as per
job requirements

1.1.4 Conduit is
assembled
ensuring that
fittings are fully
inserted and
tightened as per
job requirements

1.1.5 Conduit is
bent with bends
not exceeding
90° as per job
requirements

1.1.6 Conduit
couplings and
elbows are
installed as per
job requirements

1.1.7 Conduit is
threaded in line
with job
requirements

1.1.8 Safety
procedures are Integrate 21st Century Skills | Page 41- 47 The trainer monitor the
followed in line USAID Opportunity 2.0 trainee how to apply safety
with standard Program procedure in Installin
operating electrical metallic /non-
Module 7: Practicing metallic (PVC conduit)
procedures
Occupational Safety and
(SOPs) Health Policies and
Procedures

Activity :Safe handling


procedures of tools,
equipment, and
materials

INTEGRATION PLAN
Module Title Installing wire ways and cable tray

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Criteria Integration Activity or Task in the Page Number How to tweak the
Competency Module activity/task?

Preparations for the


trainer?

1.2.1 Correct drawings


PERFORM Install wire ways are interpreted to
ROUGHING-IN and cable tray determine job
ACTIVITIES, WIRING requirements
AND CABLING
WORKS FOR SINGLE 1.2.2 Correct quantities
PHASE of materials are
DISTRIBUTION, selected as per job
POWER, LIGHTING requirements
1.2.3 Tools and
AND AUXILIARY equipment are
SYSTEMS selected as per job
requirements

1.2.4 Wire ways and


cable trays are
installed as per job
requirements.

1.2.5 Safety procedures


are followed in line Integrate 21st Century Skills | USAID Page 58- 68 The trainer motivate the
with SOPs Opportunity 2.0 Program trainee to enumerate the
different hazard that ca be
Module 7: Practicing find in Install wire ways
Occupational Safety and and cable tray
Health Policies and
Procedures

Activity 7: Executing Work


Activities According to
OSH Work Standards

INTEGRATION PLAN
INSTALL AUXILIARY TERMINAL CABINET AND DISTRIBUTION PANEL
Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL 1.3.1 Correct


PERFORM AUXILIARY drawings are
ROUGHING-IN TERMINAL interpreted to
ACTIVITIES, WIRING CABINET determine job
AND CABLING requirements
AND
WORKS FOR SINGLE
DISTRIBUTIO
PHASE 1.3.2 Correct
DISTRIBUTION, N PANEL
quantities of
POWER, LIGHTING materials are
AND AUXILIARY selected as per
job requirements
SYSTEMS
1.3.3 Tools and
equipment are
selected as per
job requirements

1.3.4 Auxiliary
terminal cabinet
is installed as per
job requirements

1.3.5 Auxiliary
main distribution
frame is installed
as per job
requirements

1.3.6 Safety
procedures are
followed in line
with SOPs

INTEGRATION PLAN

PREPARING FOR CABLE PULLING AND INSTALLATION


Module Title
Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

PREPARE FOR 1.4.1 Necessary


PERFORM CABLE tools, equipment,
ROUGHING-IN PULLING AND materials and
ACTIVITIES, WIRING INSTALLATION personal
AND CABLING protective
WORKS FOR SINGLE equipment (PPE)
PHASE are prepared in
DISTRIBUTION, line with job
POWER, LIGHTING requirements.
AND AUXILIARY
SYSTEMS 1.4.2 Cable
pulling &
installation
requirements and
constraints from
plan and site
inspection are
identified as per
job requirements.

1.4.3 Cable lay


out & installation
equipment is set
up in accordance
with
manufacturer's
and job
requirements.

1.4.4 Site is The trainer always


made safe and Integrate 21st Century Skills | Page 42- 46
promote safety
secure for cable USAID Opportunity 2.0
procedure in preparing
installation Program
for cable pulling and
Module 7: Practicing installation
Occupational Safety and
Health Policies and
Procedures

Activity 5: Setting the


Stage for a Safe
Workplace

1.4.5 Suitable
protective
clothing is
selected and
required safety
devices are used

1.4.6 Support
structure is
assessed as safe
for normal
working
conditions

INTEGRATION PLAN

Module Title PERFORMING WIRING AND CABLING LAY OUT

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN


CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

1.5.1 Safety
PERFORM PERFORM procedures are
ROUGHING-IN WIRING AND followed based
ACTIVITIES, WIRING CABLING LAY on safety
AND CABLING OUT regulations PPE
WORKS FOR SINGLE are identified and
PHASE selected in line
with safety
requirement

1.5.2 Tools,
DISTRIBUTION, equipment,
POWER, LIGHTING pulling
AND AUXILIARY compound and
SYSTEMS safety
requirements are
identified and
obtained for the
lay out and
installation.

1.5.3 Pulling
materials is
properly installed
and tensioned to
required
specifications

1.5.4 Cable is
secured
permanently to
support structure
in accordance
with standard
installation
procedures

1.5.5 Bending
radius and loops
tolerance is
observed for
cable materials
at all times

1.5.6 Schedule
of wire cutting integrate 21st Century Skills | Page 17- 22 The trainer required their
lists is followed USAID Opportunity 2.0 trainee to make recycle
based on Program product after performing
wiring and cabling lay
estimates, Module 8: Exercising
quantity and Efficient and Effective out
Sustainable Practices
sizes to avoid
wastage.

Activity 3: Resource Use


in the Home and the
Workplace

1.5.7 Further
instructions are
sought if
unplanned
events or
conditions occur

1.5.8 Checking of
quality of work is
done in accordance
with instructions and
requirements.

INTEGRATION PLAN

NOTIFY COMPLETION OF WORK


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II


Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

NOTIFY 1.6.1 Final


PERFORM COMPLETI checks are made
ROUGHING-IN ON OF to ensure that
ACTIVITIES, WIRING WORK work conforms
AND CABLING with instructions
WORKS FOR SINGLE and job
PHASE requirement
DISTRIBUTION,
POWER, LIGHTING 21st Century Skills |
AND AUXILIARY USAID Opportunity 2.0
SYSTEMS 1.6.2 Supervisor Integrate Program Page 68-73 The trainee always practice
is notified upon before / after the work
completion of Module 7: Practicing always notify the trainer/
work Occupational Safety and supervisor
Health Policies and
Procedures
Activity 8: Reporting
OSH Non-Compliance
Activities

1.6.3 Tools,
equipment and any
surplus resources
and materials
are, where
appropriate,
cleaned,
checked and
returned to storage
in accordance with
established
procedures

1.6.4 Work area is


cleaned up and
made safe
according to OHSA
regulations

INTEGRATION PLAN

PLANNING AND PREPARING WORK


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II


Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL PLAN AND 2.2.1 Instructions


PROTECTIVE PREPARE WORK for the
DEVICES FOR preparation of
DISTRIBUTION, the work activity
are
POWER, LIGHTING,
communicated
AUXILIARY,
and confirmed to
LIGHTNING ensure clear
PROTECTION AND understanding
GROUNDING
SYSTEMS
2.2.2. Tools,
equipment and
PPE needed to
install electrical
wiring are
identified,
checked to
ensure they work
correctly as
intended and are
safe to use in
accordance with
established
procedures
2.2.3 Materials
needed for work
are obtained in
accordance with
established
procedures.

INTEGRATION PLAN

INSTALLING ELECTRICAL PROTECTIVE DEVICES


Module Title
Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Criteria Integration Activity or Task in the Page Number How to tweak the
Competency Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL INSTALL 2.3.1 Safety procedures


PROTECTIVE ELECTRICAL are followed in line
DEVICES FOR PROTECTIVE with job
DISTRIBUTION, DEVICES requirements
GROUNDING
SYSTEMS

2.3.2 Correct
POWER, LIGHTING, procedures for
AUXILIARY, installation of
LIGHTNING electrical protective
PROTECTION AND devices are
GROUNDING performed in line
with job
SYSTEMS requirements and
PEC

2.3.3 Schedule of work


is followed to ensure Integrate 21st Century Skills | USAID Page 23-31 Encourages the trainee to
work is completed in Opportunity 2.0 Program practice the 3r after install
an agreed time, to a electrical protective
Module 8: Exercising devices
quality standard and Efficient and Effective
with a minimum Sustainable Practices
waste
Activity 4: Sustainability
Policies and Practices in
the Workplace

2.3.4 Further
instructions are
sought from a
supervisor if
unplanned events or
conditions occur

2.3.5 On-going checks


of quality of work are
done in accordance
with instructions and
requirements
INTEGRATION PLAN

INSTALLING LIGHTING FIXTURE AND AUXILIARY OUTLET


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN


CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL 2.4.1Safety


PROTECTIVE INSTALL procedures are
DEVICES FOR LIGHTING followed
DISTRIBUTION, FIXTURE AND
AUXILIARY
OUTLET

POWER, LIGHTING, FIXTURE AND 2.4.2 Correct


AUXILIARY, LIGHTNING AUXILIARY procedures for
PROTECTION AND OUTLET installation of
GROUNDING SYSTEMS lighting fixture and
auxiliaries are
performed in line
with job
requirements

2.4.3 Schedule of Integrate 21st Century Skills | USAID Page 33- 34 Teach the trainee how to use
work is followed to Opportunity 2.0 Program the already use materials to
ensure work is save after/ before installing
completed in an Module 8: Exercising Efficient lighting fixture and auxiliary
agreed time, to a and Effective Sustainable outlet
quality standard Practices
and with a minimum
waste Activity 6: Resource
Conservation and Waste
Reduction Technique

2.4.4 Further
instructions are
sought from a
supervisor if
unplanned events
or conditions occur

2.4.5 On-going
checks of quality of
work are
undertaken in
accordance with
instructions and
requirements.

INTEGRATION PLAN

NOTIFY COMPLETION OF WORK


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN


CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL NOTIFY 2.5.1 Final checks


PROTECTIVE COMPLETION are made to
DEVICES FOR OF WORK ensure the work
DISTRIBUTION, conforms with
instructions and
requirements

Supervisor is
POWER, LIGHTING, notified upon
AUXILIARY, completion of
LIGHTNING work
PROTECTION AND
GROUNDING 2.5.2 Tools,
SYSTEMS equipment and
any surplus
resources and
materials are,
where
appropriate,
cleaned, checked
and returned to
storage in
accordance with
established
procedures

2.5.3 Work area is


cleaned and
made safe.

INTEGRATION PLAN

SELECTING WIRING DEVICES


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II

Prepared by ROSE ANN B. VILLAGEN


CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL WIRING SELECT WIRING 3.1.1 Drawings are


DEVICES OF FLOOR DEVICES read and
AND WALL MOUNTED interpreted to
OUTLETS, LIGHTING determine job
requirements
FIXTURE/SWITCHES
understanding
AND AUXILLIARY
OUTLETS
3.1.2 Correct type
and quantity of
wiring devices
and consumable
items are
identified in line
with job
requirements
3.1.3 Tools and
equipment are
selected in line
with job
requirements

3.1.4 Correct PPE


are identified and
selected in line
with safety
requirements

INTEGRATION PLAN

INSTALLING WIRING DEVICES


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II


Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL 3.2.1 Safety


PROTECTIVE INSTALL procedures are
DEVICES FOR WIRING followed based
DISTRIBUTION, DEVICES on safety
regulations

3.2.2 Correct
POWER, LIGHTING, procedures for
AUXILIARY, installation of
LIGHTNING wiring devices
PROTECTION AND are performed in
line with job
requirements
GROUNDING
SYSTEMS 3.2.3 Schedule of
work is followed Integrate 21st Century Skills | Page 35- 41 The trainer trained their
based on agreed USAID Opportunity 2.0 trainee to face the different
time, quality Program challenges in real situation
standard and in install wiring devices
Module 8: Exercising
minimum Efficient and Effective
wastage Sustainable Practices

Activity 7:
Inefficiencies in
Resource
Conservation and
Waste Reduction

3.2.4 Further
instructions are
sought if
unplanned
events or
conditions occur

3.2.5 On-going
checking of quality
of work is done in
accordance with
instructions and
requirements.
INTEGRATION PLAN

INSTALLING LIGHTING FIXTURE/ SWITCHES


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II


Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL 3.3.1 Safety


PROTECTIVE INSTALL procedures are
DEVICES FOR LIGHTING followed
DISTRIBUTION, FIXTURE/
SWITCHES

3.3.2 Correct
POWER, LIGHTING, procedures for
AUXILIARY, installation of
LIGHTNING lighting
PROTECTION AND fixtures/switches
GROUNDING are performed in
line with job
requirements
3.3.3 Schedule of
SYSTEMS work is followed to integrate 21st Century Skills | USAID Page 15-18 The trainer make some
ensure work is Opportunity 2.0 Program comparative price list of
completed in an different product and teach
agreed time, to a Module 9: Practicing the trainee to choice cheap
quality standard Entrepreneurial Skills in product but heavy duty
and with a minimum the Workplace
waste
Activity 3: Cost-conscious
Habits in Utilizing
Resources

3.3.4 Further
instructions are
sought from a
supervisor if
unplanned events
or conditions occur

3.3.5 On-going
checks of quality of Integrate 21st Century Skills | USAID Page 12-13 Always remember to the
work are Opportunity 2.0 Program trainee a good quality of
undertaken in work encourages some
accordance with Module 9: Practicing costumer to deal with them.
instructions and Entrepreneurial Skills in
requirements the Workplace
Activity 2: Quality
Standards in the
Workplace
INTEGRATION PLAN

NOTIFING COMPLETION OF WORK


Module Title

Qualification ELECTRICAL INSTALLATION AND MAINTENANCE NC II


Prepared by ROSE ANN B. VILLAGEN

CORE COMPETENCY

Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?

Preparations for the


trainer?

INSTALL ELECTRICAL 3.4.1 Final checks


PROTECTIVE NOTIFY are made to
DEVICES FOR COMPLETION ensure that work
DISTRIBUTION, OF WORK conforms with
instructions and
to requirements

Supervisor is
POWER, LIGHTING, notified upon
AUXILIARY, completion of
LIGHTNING work
PROTECTION AND
GROUNDING 3.4.2 Tools,
SYSTEMS equipment and
any surplus
resources and
materials are,
where
appropriate,
cleaned, checked
and returned to
storage in
accordance with
established
procedures

3.4.3 Work area is


cleaned and
made safe