Professional Documents
Culture Documents
Integration Plan Eim NC Ii Rose
Integration Plan Eim NC Ii Rose
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
1.1.1 Correct
PERFORM Install electrical drawings are
ROUGHING-IN metallic /non- interpreted based
ACTIVITIES, WIRING metallic (PVC on job
AND CABLING conduit) requirements
WORKS FOR SINGLE
PHASE
1.1.2 Correct
DISTRIBUTION, quantities of
POWER, LIGHTING conduit, fittings
AND AUXILIARY and accessories
SYSTEMS are determined
as per job
requirements
1.1.4 Conduit is
assembled
ensuring that
fittings are fully
inserted and
tightened as per
job requirements
1.1.5 Conduit is
bent with bends
not exceeding
90° as per job
requirements
1.1.6 Conduit
couplings and
elbows are
installed as per
job requirements
1.1.7 Conduit is
threaded in line
with job
requirements
1.1.8 Safety
procedures are Integrate 21st Century Skills | Page 41- 47 The trainer monitor the
followed in line USAID Opportunity 2.0 trainee how to apply safety
with standard Program procedure in Installin
operating electrical metallic /non-
Module 7: Practicing metallic (PVC conduit)
procedures
Occupational Safety and
(SOPs) Health Policies and
Procedures
INTEGRATION PLAN
Module Title Installing wire ways and cable tray
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Criteria Integration Activity or Task in the Page Number How to tweak the
Competency Module activity/task?
INTEGRATION PLAN
INSTALL AUXILIARY TERMINAL CABINET AND DISTRIBUTION PANEL
Module Title
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
1.3.4 Auxiliary
terminal cabinet
is installed as per
job requirements
1.3.5 Auxiliary
main distribution
frame is installed
as per job
requirements
1.3.6 Safety
procedures are
followed in line
with SOPs
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
1.4.5 Suitable
protective
clothing is
selected and
required safety
devices are used
1.4.6 Support
structure is
assessed as safe
for normal
working
conditions
INTEGRATION PLAN
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
1.5.1 Safety
PERFORM PERFORM procedures are
ROUGHING-IN WIRING AND followed based
ACTIVITIES, WIRING CABLING LAY on safety
AND CABLING OUT regulations PPE
WORKS FOR SINGLE are identified and
PHASE selected in line
with safety
requirement
1.5.2 Tools,
DISTRIBUTION, equipment,
POWER, LIGHTING pulling
AND AUXILIARY compound and
SYSTEMS safety
requirements are
identified and
obtained for the
lay out and
installation.
1.5.3 Pulling
materials is
properly installed
and tensioned to
required
specifications
1.5.4 Cable is
secured
permanently to
support structure
in accordance
with standard
installation
procedures
1.5.5 Bending
radius and loops
tolerance is
observed for
cable materials
at all times
1.5.6 Schedule
of wire cutting integrate 21st Century Skills | Page 17- 22 The trainer required their
lists is followed USAID Opportunity 2.0 trainee to make recycle
based on Program product after performing
wiring and cabling lay
estimates, Module 8: Exercising
quantity and Efficient and Effective out
Sustainable Practices
sizes to avoid
wastage.
1.5.7 Further
instructions are
sought if
unplanned
events or
conditions occur
1.5.8 Checking of
quality of work is
done in accordance
with instructions and
requirements.
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
1.6.3 Tools,
equipment and any
surplus resources
and materials
are, where
appropriate,
cleaned,
checked and
returned to storage
in accordance with
established
procedures
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Criteria Integration Activity or Task in the Page Number How to tweak the
Competency Module activity/task?
2.3.2 Correct
POWER, LIGHTING, procedures for
AUXILIARY, installation of
LIGHTNING electrical protective
PROTECTION AND devices are
GROUNDING performed in line
with job
SYSTEMS requirements and
PEC
2.3.4 Further
instructions are
sought from a
supervisor if
unplanned events or
conditions occur
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
2.4.3 Schedule of Integrate 21st Century Skills | USAID Page 33- 34 Teach the trainee how to use
work is followed to Opportunity 2.0 Program the already use materials to
ensure work is save after/ before installing
completed in an Module 8: Exercising Efficient lighting fixture and auxiliary
agreed time, to a and Effective Sustainable outlet
quality standard Practices
and with a minimum
waste Activity 6: Resource
Conservation and Waste
Reduction Technique
2.4.4 Further
instructions are
sought from a
supervisor if
unplanned events
or conditions occur
2.4.5 On-going
checks of quality of
work are
undertaken in
accordance with
instructions and
requirements.
INTEGRATION PLAN
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
Supervisor is
POWER, LIGHTING, notified upon
AUXILIARY, completion of
LIGHTNING work
PROTECTION AND
GROUNDING 2.5.2 Tools,
SYSTEMS equipment and
any surplus
resources and
materials are,
where
appropriate,
cleaned, checked
and returned to
storage in
accordance with
established
procedures
INTEGRATION PLAN
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
3.2.2 Correct
POWER, LIGHTING, procedures for
AUXILIARY, installation of
LIGHTNING wiring devices
PROTECTION AND are performed in
line with job
requirements
GROUNDING
SYSTEMS 3.2.3 Schedule of
work is followed Integrate 21st Century Skills | Page 35- 41 The trainer trained their
based on agreed USAID Opportunity 2.0 trainee to face the different
time, quality Program challenges in real situation
standard and in install wiring devices
Module 8: Exercising
minimum Efficient and Effective
wastage Sustainable Practices
Activity 7:
Inefficiencies in
Resource
Conservation and
Waste Reduction
3.2.4 Further
instructions are
sought if
unplanned
events or
conditions occur
3.2.5 On-going
checking of quality
of work is done in
accordance with
instructions and
requirements.
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
3.3.2 Correct
POWER, LIGHTING, procedures for
AUXILIARY, installation of
LIGHTNING lighting
PROTECTION AND fixtures/switches
GROUNDING are performed in
line with job
requirements
3.3.3 Schedule of
SYSTEMS work is followed to integrate 21st Century Skills | USAID Page 15-18 The trainer make some
ensure work is Opportunity 2.0 Program comparative price list of
completed in an different product and teach
agreed time, to a Module 9: Practicing the trainee to choice cheap
quality standard Entrepreneurial Skills in product but heavy duty
and with a minimum the Workplace
waste
Activity 3: Cost-conscious
Habits in Utilizing
Resources
3.3.4 Further
instructions are
sought from a
supervisor if
unplanned events
or conditions occur
3.3.5 On-going
checks of quality of Integrate 21st Century Skills | USAID Page 12-13 Always remember to the
work are Opportunity 2.0 Program trainee a good quality of
undertaken in work encourages some
accordance with Module 9: Practicing costumer to deal with them.
instructions and Entrepreneurial Skills in
requirements the Workplace
Activity 2: Quality
Standards in the
Workplace
INTEGRATION PLAN
CORE COMPETENCY
Objective or Core Learning Outcome Assessment Integration Activity or Task in the Page Number How to tweak the
Competency Criteria Module activity/task?
Supervisor is
POWER, LIGHTING, notified upon
AUXILIARY, completion of
LIGHTNING work
PROTECTION AND
GROUNDING 3.4.2 Tools,
SYSTEMS equipment and
any surplus
resources and
materials are,
where
appropriate,
cleaned, checked
and returned to
storage in
accordance with
established
procedures