Course Contents of Module

SAP PP
(Production Planning & Controlling)
(Basic + Advance + Expert Levels)
Covers both ECC 6.0 & S/4 HANA
(Users Acitivities, SAP Support, & SAP Implementation)

Helps to become:
• End User,
• Super User,
• Power User,
• SAP Manager,
• SAP Consultant,
• SAP Auditor,
• Freelancer Professional,
• Solution Architect, & Others

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)

1. Introduction of SAP and S/4 HANA:

A. ERP Concept,
B. SAP Concept,
C. SAP S/4 HANA Concept,
D. Why SAP,
E. Why SAP ECC and SAP S/4 HANA,
F. Difference between SAP R/1, SAP R/2, SAP R/3, SAP ECC, & SAP HANA,
G. Difference between SAP Embedded HANA & SAP S/4 HANA.
H. SAP Products,
I. SAP Professionals,
J. SAP Growth Chart,
K. SAP Projects,
L. ASAP methodology,
M. Business Blue Print Creation,
N. SAP Modules,
O. Why SAP PP,
P. SAP PP organization structure,
Q. Functional Requirement Specification,
R. Creation of Industry Print.
S. Real Time Functionality of SAP R/3, SAP ECC, & SAP HANA,
T. SAP GUI and SAP Logon/Login,
U. SAP LandScape,
V. SAP R/3, SAP ECC, & SAP S/4 HANA Architecture,
W. SAP ECC Concept.
X. PIS and Function Specification.

2. General Settings:
A. Defining Country,
B. Defining Regions,
C. Defining Currency, and
D. Defining Holidays Calenders.
E. Defining Factory Calenders,

3. Enterprise Structure:

A. Definition,
B. Identifying the organizational Units,
C. Assignment,
D. Enterprise Structure Navigation.

4. Cost Center Configurations for Planned and Actual Cost:

A. Maintaining the controlling area,


. Activating Control Indicators for Costing,

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
C. Activating Components for Costing,
D. Maintaining the Number Ranges for Costing Documnets,
E. Defining the Costing Version for Integrated Cost planning,
F. Maintaining the Cost center Hierarchy,
G. Identifying the Cost centers,
H. Cost center creation,
I. Performing changes in cost centers,
J. Integrating the Cost Center with Cost Elements.
K. Maintaining the Cost Center Groups,
L. Assigning the Cost Elements to Cost Element Group

5. Material Master on S/4 HANA:

A. Identifying the material Types,


B. Defining the Material Types,
C. Identifying the Material Number Ranges,
i. Internal Number Ranges,
ii. External Number Ranges.
D. Integration of Number Ranges with Material Types,
E. Maintaing/Creating the Material Masters(Materials Codes),
F. Extending the Material Masters(Materials Codes) in Plants,
G. Extending the Material Masters(Materials Codes) in Stores,
H. Extending the Material Masters(Materials Codes) in Purchasing,
I. Extending the Material Masters(Materials Codes) in Accounting,
J. Modifying the Material Masters(Materials Codes).

6. Vendor Master on S/4 HANA:

A. Screen layout for Vendor groups,


B. Identifying Vendor Groups,
C. Setting Field status for vendor creation,
D. Maintaining Vendor number ranges,
E. Reconciliation Vendor for A/P,
F. Integration of vendor with Accounts,
G. Vendor master creation,
H. Extending the Vendor in multiple purchase organizations,
I. Making changes in vendor,

7. Customer Master Data in S/4 HANA:

A. Screen layout for customer a/c groups,


B. Identifying Customer Groups,
C. Setting Field status for customer creation,
D. Customer number ranges,
E. Reconciliation a/c for A/R and G/L,
F. Customer master data creation,
G. Making changes in customer master,
H. Bulk creation/upload of customers by Migration Tools,

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)

I. Block/Unblock Customer Master.

8. BOM- Bill of Material in S/4 HANA:

A. Configurations of BOM,
B. BOM Usage,
C. BOM Status,
D. Item Category in BOM,
E. Types of BOM:
i. Multiple BOM,
ii. Recursion BOM,
iii. Alternative BOM.
F. Material Types for BOM,
G. BOM Default Settings,
H. Creation of BOM,

9. Work Center in S/4 HANA:

A. Configuration of Work Center,


B. Work Center Categories,
C. Task List Usage,
D. Standard Value Key and Parameters,
E. Capacity Configurations,
F. Pooled Capacity
G. Reference Capacity,
H. Work Center Scheduling and Costing Configurations,
I. Default Work Center,
J. Work Center Master Data Creation.

10. Routing in S/4 HANA:

A. Configuration of Routing,
B. Material Types for Routing,
C. Operation Control Keys,
D. Routing Assignments:
i. Components Assignment,
ii. Material Assignment.
iii. Multiple products assignment to one routing,
iv. One Product Assignment to Multiple Routings
E. Standard Text Keys,
F. Routing. Master Data Creation.

11. Production Order in S/4 HANA:

A. Configuring Production Order Types,


B. Number Ranges configurations for Production Order,
C. Order Type Dependent Parameters,

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)

D. Availability Check Configurations,


E. Configurations of Scheduling Parameters,
F. Configuration of Confirmation Parameters.
G. Production Order Creation and Processing:
i. Material Avaiolability check,
ii. Capacity Planning,
iii. Release Order,
iv. Goods Issue for Production,
v. Order Confirmation,
vi. Finished Product Receipt,
vii. Production Cost Calculation.
viii. Technically Completion and Closeure of Order.

12. SAP MRP and Production Planning Config in S/4 HANA:

A. Configuration of MRP Plant parameter,


B. Configuration of MRP type, and MRP Group,
C. Configuration of Requirement type and Requirement Class,
D. Configuration of scheduling parameter for Planned orders,
E. Configuration of lot sizing procedure.

13. Demand Management in S/4 HANA:

A. Concept of Demand Management,


B. Configurations fo Planning Strategy Group,
C. Planned Independent Requirement/Make to Stock,
D. Customer Independent Requirement/Make to Order,

14. SOP Configuration in S/4 HANA:

A. Standard SOP:
i. Information Structure,
ii. Planning Method,
iii. Planning Type,
iv. Production Group..
B. Process of Standard SOP,
C. Flexible Planning,

15. Batch Mangement in S/ HANA:

A. Specifying Batch Level and Batch Activation,


B. Batch Status Management,
C. Internal Batch Assignment for Goods Receipt,
D. Maintaining Internal Batch Number Assignment Range,
E. Defining Batch Creation for Process Order,
F. Defining Batch Creation for Goods Movement,
G. Batch Valuation,

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
H. Batch Determination and Batch Check,
I. Defining Process Order Access Sequence,
J. Setting Shelf Life Expiration Date.

16. Process Industry- PI process in S/4 HANA:

A. Material Master for PI,


B. BOM for PI,
C. Resource for PI,
D. Master Receipe for PI,
E. Product Version,
F. PI Process Run.

17. Repetitive Industry- Repetitive Manufacturing Process in S/4 HANA:

A. Repetitive Profile Configurations,


B. REM Settings in Material Master ,
C. REM- Production Line,
D. Rate Routing,
E. Production Version for REM,
F. REM- Product Cost Controller,
G. Line Loading,
H. REM Backflushing,
I. REM Document Flow.

18. Data Migration in S/4 HANA:

A. Creating the Raw Data File for Master Data Upload


B. Configuring the LSMW,
C. Uploading the Data File Through LSMW.
D. Verifying the Uploaded Data.

19 Project Scenarios and SAP Implementation Life Cycle:

A. Project Preparation,
B. Creation of Business Blue Print,
i. Creation of AS IS Document,
ii. Creation of TO BE Document,
iii. BBP Signoff activity,
C. Realization and Testing,
i. Realization:
a. Configuration and Customization,
b. Creation of FSD for the Development/Enhancement,
c. Getting Table and Field details and building the logics,
ii. Testing:
a. System Integration Testing(SIT),
b. User Acceptance Testing(UAT),
c. Getting Testing Documents Signoff.

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
D. Final Preperation,
i. Identifying the Cutover Activities,
ii. Performing the Cutover Activity.
E. Go Live and Post Implementation Support,
i. Documentation and precautions,
ii. Ticket Handling with priorities,

20. Creation of Functional Specification Document:

A. Getting field details and building the logics,


B. Creation of Input Screen,
C. Creation of Selection Screen,
i. Fetching the Technical Details,
ii. Verifying the Records,
D. Creation of Output Screen,
i. Fetching the Technical Details,
ii. Writting the Logics,
iii. Verifying the Logics authentication.

21. Authorization Management in S/4 HANA:

A. User Maintenance,
B. Roles Maintenance,
C. Profile Maintenance,
D. Assigning Transaction Codes

22. Customization Request or TR in S/4 HANA:

A. TR Creation,
B. TR Copy,
C. TR Release,
D. TR Movement.

23. Business Process Discussions Activities

A. Business
B. Defining the Schedules,
C. Business Process Dicussion techniques,
D. Brainstorming,
E. Documentation of Business Process.

24. Cutover Activities

A. List of Cutover activities,


B. Defining User Screen Variaint,
C. Maintaing Z Table Data,
D. Maintaing the Number Ranges,
E. Uploading the Master Data,

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
F. Uploading the open transaction Data,
G. Transpoting the TRs.

25. SAP Project Other Activities

A. Trial Run,
B. Black Out Period,
C. Go or No-Go Activities,
D. MOM,
E. SAP GUI,

Course Details
Duration:

A. Regular Classes : 2 Months,


B. Weekend Classes : 3 Months,
C. Only Sunday Classes : 4 Months,
D. Only Saturday Classes : 4 Months,
E. Fast Track : 15 Days.

Available Class/Training Types:

A. Classroom Training,
B. Online Trainig,
C. Corporate Training.

Services of UCPL Technologies

• SAP Implementation,
• SAP Rollout,
• SAP Support,
• SAP Outsourcing,
• SAP Staffing, and
• SAP Data Migration.

Please do not print this document if not required


Save Papers, Save Trees, Save Environment, Save Earth

(End of the Document)

U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064

You might also like