Professional Documents
Culture Documents
0009 SAP PP With S4 HANA Syllabus UCPL Technologies
0009 SAP PP With S4 HANA Syllabus UCPL Technologies
0009 SAP PP With S4 HANA Syllabus UCPL Technologies
SAP PP
(Production Planning & Controlling)
(Basic + Advance + Expert Levels)
Covers both ECC 6.0 & S/4 HANA
(Users Acitivities, SAP Support, & SAP Implementation)
Helps to become:
• End User,
• Super User,
• Power User,
• SAP Manager,
• SAP Consultant,
• SAP Auditor,
• Freelancer Professional,
• Solution Architect, & Others
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
A. ERP Concept,
B. SAP Concept,
C. SAP S/4 HANA Concept,
D. Why SAP,
E. Why SAP ECC and SAP S/4 HANA,
F. Difference between SAP R/1, SAP R/2, SAP R/3, SAP ECC, & SAP HANA,
G. Difference between SAP Embedded HANA & SAP S/4 HANA.
H. SAP Products,
I. SAP Professionals,
J. SAP Growth Chart,
K. SAP Projects,
L. ASAP methodology,
M. Business Blue Print Creation,
N. SAP Modules,
O. Why SAP PP,
P. SAP PP organization structure,
Q. Functional Requirement Specification,
R. Creation of Industry Print.
S. Real Time Functionality of SAP R/3, SAP ECC, & SAP HANA,
T. SAP GUI and SAP Logon/Login,
U. SAP LandScape,
V. SAP R/3, SAP ECC, & SAP S/4 HANA Architecture,
W. SAP ECC Concept.
X. PIS and Function Specification.
2. General Settings:
A. Defining Country,
B. Defining Regions,
C. Defining Currency, and
D. Defining Holidays Calenders.
E. Defining Factory Calenders,
3. Enterprise Structure:
A. Definition,
B. Identifying the organizational Units,
C. Assignment,
D. Enterprise Structure Navigation.
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
C. Activating Components for Costing,
D. Maintaining the Number Ranges for Costing Documnets,
E. Defining the Costing Version for Integrated Cost planning,
F. Maintaining the Cost center Hierarchy,
G. Identifying the Cost centers,
H. Cost center creation,
I. Performing changes in cost centers,
J. Integrating the Cost Center with Cost Elements.
K. Maintaining the Cost Center Groups,
L. Assigning the Cost Elements to Cost Element Group
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
A. Configurations of BOM,
B. BOM Usage,
C. BOM Status,
D. Item Category in BOM,
E. Types of BOM:
i. Multiple BOM,
ii. Recursion BOM,
iii. Alternative BOM.
F. Material Types for BOM,
G. BOM Default Settings,
H. Creation of BOM,
A. Configuration of Routing,
B. Material Types for Routing,
C. Operation Control Keys,
D. Routing Assignments:
i. Components Assignment,
ii. Material Assignment.
iii. Multiple products assignment to one routing,
iv. One Product Assignment to Multiple Routings
E. Standard Text Keys,
F. Routing. Master Data Creation.
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
A. Standard SOP:
i. Information Structure,
ii. Planning Method,
iii. Planning Type,
iv. Production Group..
B. Process of Standard SOP,
C. Flexible Planning,
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
H. Batch Determination and Batch Check,
I. Defining Process Order Access Sequence,
J. Setting Shelf Life Expiration Date.
A. Project Preparation,
B. Creation of Business Blue Print,
i. Creation of AS IS Document,
ii. Creation of TO BE Document,
iii. BBP Signoff activity,
C. Realization and Testing,
i. Realization:
a. Configuration and Customization,
b. Creation of FSD for the Development/Enhancement,
c. Getting Table and Field details and building the logics,
ii. Testing:
a. System Integration Testing(SIT),
b. User Acceptance Testing(UAT),
c. Getting Testing Documents Signoff.
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
D. Final Preperation,
i. Identifying the Cutover Activities,
ii. Performing the Cutover Activity.
E. Go Live and Post Implementation Support,
i. Documentation and precautions,
ii. Ticket Handling with priorities,
A. User Maintenance,
B. Roles Maintenance,
C. Profile Maintenance,
D. Assigning Transaction Codes
A. TR Creation,
B. TR Copy,
C. TR Release,
D. TR Movement.
A. Business
B. Defining the Schedules,
C. Business Process Dicussion techniques,
D. Brainstorming,
E. Documentation of Business Process.
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064
UCPL Technologies
(Approved SAP Training Center)
F. Uploading the open transaction Data,
G. Transpoting the TRs.
A. Trial Run,
B. Black Out Period,
C. Go or No-Go Activities,
D. MOM,
E. SAP GUI,
Course Details
Duration:
A. Classroom Training,
B. Online Trainig,
C. Corporate Training.
• SAP Implementation,
• SAP Rollout,
• SAP Support,
• SAP Outsourcing,
• SAP Staffing, and
• SAP Data Migration.
U-136, Ground Floor, Satyam Building, Near Laxmi Nagar Metro Station Gate No. 4, Delhi - 92
Visit us at www.ucpltechnologies.org.
Mob.: 931 832 4064, Whatsapp: 931 832 4064