Study on Total Quality Management and Reward (TQMR)

Abstract: - As the whole world is becoming a global village with the free trade movements of the products and services across the
countries and the Indian consumers getting exposed to the International best standard practices and products, the same also goes
true when it comes to the products of the construction projects like Infrastructure, Buildings projects. The India construction
companies can adopt the Total Quality Management tools and techniques to involve every activity and everyone associated with the
project to produce world class project.
Keywords-Total Quality Management, International best Practices, Global Village.
_______________________________ ***********____________________________________
1. Introduction forces jeopardizes and the actual construction at the site takes
With India being a member of the World Trade place more or less in the same old fashion.
Organization (WTO) with free trade zone, more and more It is a quite challenging task to implement the TQM
foreign companies are bringing their products and services to philosophy in factory conditions where the works are carried
India. The Online giants like Amazon, Flipkart, Snap deal, out inrepetitive manner on same set of machineries and for a
Jabong etc. have made available the best worldwide product particular product. However it becomes much more challenging
and technology at the doorsteps of the Indian consumers. to implement at construction project sites due to a new project
Today’s consumer is the most informed customer exposed to every time at different geographical locations, working with
the internet information and expects best products and services task forces comprising of migratory workers and unpredictable
when it comes to the Infrastructure, buildings and the Quality complications under varying situations.
products of the Construction Industries as well, which can be The importance of TQM in construction industry is
met by adoption of the Total Quality Management. evident from the fact that even today a good amount of Time
Moreover, due to the slowdown of the western and Cost is wasted in identification of snag on the completion
economy and due to the high Growth rate of Indian economy, of the project and its rectification. The bad quality of work
many of the Multinational construction related companies have executed resurfaces in the form of visible quality defects and
already opened up their offices in India and are available to the usability defects after the project is put to its intended use and
Indian Consumers whether it be the Private companies or the in many cases cannot be repaired. The need is to apply the
Govt. Tenders. Most of the developed nations have constructed TQM to the entire life cycle of the project involving a good
their Infrastructure for next 5 decades and hence their resources team work by various stake holders like Clients, Architects,
have been freed for next few years and are available for Engineers, Supervisors, Contractors and Work Force.
developing nations like India. All these above factors have TQM aims at improving the work culture, employee
contributed to the fact that more and more tenders are being empowerment, customer satisfaction, Maximization of Return
published as the global tenders and all such Multinational on Investment and overall performance excellence by adopting
companies are actively participating in such tenders. the Standard Operating Procedures and Statistical Quality
There are two fold effects due to the increased Control. It is not limited to material testing or quality assurance
competition from these companies: of end product only but it aims at the process of quality
1. Firstly, the Indian Construction related companies planning, quality improvement and quality controlat each and
need to raise their bars to match the International Best Practices every phase. Adoption of the ISO certification helps in
and Quality of Work to compete with them. documentation control and put emphasis on the procedural
2. Secondly, they need to match the International aspect eliminating the human error.
quality expectation to collaborate with the foreign companies to Once the organization decides to implement the TQM
bid for the works which is implemented for the first time in philosophy the biggest road block or resistance comes as non-
India. cooperation of the employees and the work force. The best way
The objective of this research is to identify the critical to overcome this difficulty is to motivate then with the reward
strategies and important practices of TQM that the Indian system based on quality of work based on TQM and the
companies in construction industry should apply to sustain the quantity of work done as per the KRA’s (Key Performance
competition from the Hammer of Global competition. Area) of the employee.
Construction Sector is one of the sector which has to
go through an enormous change to match the global quality
standards due to the age old practice followed by majority of 2. LITERATURE REVIEW
the Construction Industries. As the manpower in India is still In the quest to perfect the art of existence in the early
cheaper than other countries, the construction sector in India centuries among the animals in jungles to now fulfil the needs
engages the second highest workforce after agriculture. The and wants of today’s world, humans have every time perfected
Work force engaged stitches between the agriculture sector and the work by way of improvement over previous work, which is
construction sector during the harvest season. Due to this factor the basic definition of TQM of continuous improvement.The
the much needed training for the quality of work to the work aim of this chapter is to understand the variety of definition
provided by several worldwide researchers in the available

1
IJRITCC | Month 2014, Available @
http://www.ijritcc.org__________________________________________________________________________
_____________
literature in public domain and to establish the precise concept iii. Some features of the Japanese construction industry
of TQM and its Application to construction sector. which could be applied in the Egypt.
iv. Proposed a new model for TQM implementation
2.1 Review of Technical papers: which issuitable to Egyptian construction industry.
New Model proposed to implement TQM through the
1. Kenneth T. Sullivan (2011) following steps:
i. The study identifies three classical quality 1. Commitment by Top Management
management programs of total quality management 2. Orientation
(TQM), lean production, and six sigma, which has 3. Planning of the Program
been widely implemented in manufacturing industry, 4. Training on the TQM
however the their application in construction industry 5. Conducting the Quality Projects
is very lean. 6. Improving Job site quality
ii. This paper analyses these three programs on the basis 7. Measuring Results.
of their success and failures in the construction
industry. 3. Tang, W., Qiang, M., Duffield, C., Young, D., and Lu, Y.
iii. First program, TQM application to the construction (2009).
industry was limited due to the low bid by the This paper focus on increasing trend of Total Quality
contractor and low cost benefit ratio on implementing management in Construction Industry with the key TQM
TQM to construction industry. factors as Customer focus, quality measurements and
iv. The Second program, lean production gives emphasis improvement, total involvement, leadership, training,
on less of everything in Production, time, tool, space empowerment teamwork, motivation, system approach and
and Human Efforts to produce same result which was culture. TQM implementation faces multiple barriers in
practiced by the Toyota Production System. It construction industry due to its fragmented nature each project
eliminates the waste efforts which do not add value to being unique leads to difficulty in developing standards,
the process. A major hurdle on implementing the Lean excessive price competiveness and high risk business. The
production in Construction industry is due tothe non- study bring out partnering as a solution to all the barriers and a
repetitive nature of unique projects and secondly as it way to effective implementation. Partnering brings the various
relies more on Inspection of defects and rectification stakeholders to form a united multifunctional project team to
rather than to get it right the first time. improve the quality.
v. The Third Program, Six sigma is the quantitative The Win – Win approach by partnering is by sharing
approach for improvement by limiting the number of the reward among the members to boost the performance. The
defects below 3.4 Parts per Million. Six sigma was data was collected through triangulated questionnaire survey
more user friendly for implementation in construction method, Interview and Case study involving the Chinese
industry by following the DMAIC process – Define, construction industries. The study reveals a strong positive
measure, analyze, improve and control. correlation between Partnering, use of incentive and TQM.
vi. These programs were then compared with the latest
developed “The best value system”, an owner-driven 4. Chokor, A., El Asmar, M., and Sai Paladugu, B. (2016).
quality program that focus on quality improvement by This Research paper address how the Construction
elimination of waste by two methods: fist one is to projects often suffer from cost overruns and time delays and
reduce client decision making by aligning the most how the Incentive scheme encourage the stakeholders to
appropriate contractor to the client through complete the project with optimal cost and time. The Study
performance information and second by minimizing analyses the adoption of incentive mechanisms which is more
the need for client management by transferring risk to and more adopted in last few decades in U.S Construction.
the appropriate third party. Here the incentive is categorized into four types based on Cost,
Time, Quality and Safety, the former two being more focused
2. Elghamrawy, T. and Shibayama, T. (2008) by the industry. Cost based incentive advocates the sharing of
The study recognizes Total quality management as a the saved cost, Time based incentive is incentivized to save
successful philosophy which can be implemented in the time and a reward associated with it, Quality and Safety based
construction Industry in Egypt. A comparison of management incentive is to minimize the defects and accidents.
system is made between a Japanese company working in Egypt The study showed the result that that cost-based
with the Egyptian company to demonstrate how TQM can be incentives scheme can reduce cost and schedule overruns by
implemented effectively in the Egyptian construction industry. 5.3% and 8.4%, respectively.
Based on the research findings, the paper presents
i. The Characteristics of the Egyptian Construction 3. THEORY OF TOTAL QUALITY MANAGEMENT
industry. 3.1Concept and Definition:
ii. Issues in Application of TQM in Construction
industry. Total Quality Management
The word “Quality’ is originated from the Latin word

2
IJRITCC | Month 2014, Available @
http://www.ijritcc.org__________________________________________________________________________
_____________
'qualis', which means 'such as the thing really is'. In today’s  Sheigo Shingo
world of full of internet knowledge there is no single best  He was the founder of Single minute Exchange of
definition of Quality. However it is better to understand Dies which was the reduction of set up time of
the definition perceived by various quality Gurus to change over to less than 10 minutes i.e. a single
understand the genesis of the concept of quality to the digit minutes to change the set-up of
latest buss word of Total Quality Management: manufacturing, which earlier used to be few
hours or days where by a considerable time was
 Walter Shewart saved due to this approach.
 Founder of P-D-C-A (Plan- Do- Check – Act)
applied in situations where the processes are  A V Feigenbaum
repeated again and again improvising in every  He was American quality control expert who was
next cycle. the father of TQM. The word TQM has originated
from his concept of Total Quality Control.
 W. Edward Deming
 Popularized the P-D-C-D cycle and defined  Masaaki Imai
Quality as a key Competitive advantage. After the  He was founder of Kaizen Gemba which means
world war-II when Japanese Industries were improvement in work place. It was upgraded
struggling to get a foot hold in the Western version of the Quality Circle which was the group
market, Daming led the quality revolution in effort of colleagues meeting periodically to
Japan. For his contributions, Japan has named the resolve the work related quality issues.
most prestigious award for quality on his name as
Daming Award. He formulated the Deming’s  Taiichi Ohno
Fourteen Points for excellence and seven diseases  He was a Japanese Engineer who initiated the
for the fall of the organization. Toyota Production System later was called as
Lean manufacturing, by eliminating the Wastes
 Joseph M Juran (Muda). He found the Just In Time and Kanban
 He also led the Quality revolution of the Japanese system of Manufacturing.
industries after world war-II. He defined Quality
as fitness for use by the customer. Juran gave the
holistic method for Business excellence as Juran’s 4. Need of Total Quality Management in Construction
trilogy of quality planning, quality control and Sector:
quality improvement. He introduced the concept The aim of any construction project is to use to
Cost of poor quality to measure the financial available resources in the best possible manner to
impact on overall profitability of the business. produce the results which should satisfy the end
objective of the customer and at the same time should
 Kaoru Ishikawa provide the highest rate of return for the investment
 A legendary Japanese quality guru who was the made by all the stake holders. As Total Quality
founder of the problem solving technique “Cause Management has been defined as Systematic and
and Effect or Fish Bone diagram”. He classified Scientific Method for the Continuous Improvement of
the causes into five categories namely Men, quality for customer satisfaction, by optimisation of
Machine, Material, Method and Mother Nature resources, it should provide the best solution to the
and each causes was divided into further sub above mentioned objectives for construction projects.
clauses till the root cause is identified and TQM advocates the process approach by the
solution is found out for the corrective and the involvement of every activity by each one involved in
preventive action. the construction project during the Pre-construction,
Construction and Post construction stage.
 Philip b Crosby
 He was a Quality guru who wrote books like
“Quality is Free”, Quality without Tears”, etc. 5. CONCLUSION
 He defined quality as conformance to The world has become a Global village, the
requirements. He was of the opinion that the consumers have access to the best products and services across
responsibility of quality solely lies with the the countries and hence the same expectation of quality
management and how a small percentage of standard also applies to the construction projects. So the Indian
earning spent on required training can Construction Industry has to gear up to stand andfulfil the
substantially improve the quality. He propagated needs and aspirations of trillion dollar Indian economy to
the concept of do it right the first time and the satisfy the customer needs
Zero Defect Concept. As the goal of TQM matches with the objective of
construction projects of continuous improvement of quality,
3
IJRITCC | Month 2014, Available @
http://www.ijritcc.org__________________________________________________________________________
_____________
customer satisfaction and optimisation of resources, it can be
applied successfully with the desired results to the stakeholders.