RINGKASAN KEGIATAN LAB.

TECHNICIAN

Nama : Reki Setia Budiman, ST


Jabatan : Lab. Technician
Paket : PENGAWASAN TEKHNIS PERSERVASI JALAN BTS. PROV. SUMBAR - BTS. KOTA MUARA BUNGO – BTS. KAB. BUNGO/ KAB. MERANGIN – BTS. KAB. TEBO/
KAB. BUNGO - MUARA TEBO. PPK 2.3

No. TANGGAL URAIAN KEGIATAN Ket.

1. Monitoring Produksi Laston AC-BC AMP PT. Megasari Sejati


28/03/2023 2. Pembuatan bricket sampel Laston AC-BC

1. Monitoring Produksi Laston AC-BC 61.10 Ton | Suhu 155°C


2. Monitoring Produksi Beton Fc 10 Mpa
3. Monitoring Pek. Rigid Beton Bahu Jalan Fc 10 Mpa (Lean Concrete) | Ruas N.10 Mayor 1
29/03/2023 4. Monitoring CoreDrill overlay AC-BC | Ruas N.10

1. Monitoring Produksi Laston AC-WC


30/03/2023 2. Monitoring Pek. Plat Duiker

1. Monitoring Produksi Laston AC-WC


2. Monitoring Pek. Overlay AC-WC | Ruas N.10 Mayor 2
31/03/2023 3. Monitoring CoreDrill overlay AC-BC | Ruas N.10

1. Monitoring Produksi Laston AC-WC


01/04/2023

1. Produksi Laston AC-WC


2. Monitoring Pek. Overlay AC-WC | Ruas N.10 Mayor 2
3. Monitoring CoreDrill overlay AC-BC | Ruas N.10
02/04/2023 4. Pengujian daya dukung Tanah dengan DCP | Mayor 1

1. Monitoring Produksi Laston AC-WC


2. Pemeriksaan/ Pengujian Sampel CoreDrill AC-BC
03/04/2023

1. Monitoring Produksi Laston AC-BC | Overlay Mayor 1


2. Pemeriksaan/ Pengujian Sampel CoreDrill AC-WC
04/04/2023

1. Monitoring Produksi Laston AC-BC | Overlay Mayor 1


2. Pemeriksaan/ Pengujian Sampel CoreDrill AC-WC
05/04/2023 3. Uji Marshall Laston AC-BC

1. Monitoring Produksi Beton fc 20 Mpa | Rigid Bahu Jalan Mayor 1


2. Monitoring Produksi Beton fc 10 Mpa | LC Rigid Bahu Jalan Mayor 1
06/04/2023 3. Uji Marshall Laston AC-BC
4. Ekstraksi Laston AC-BC

1. Monitoring Produksi Beton fc 20 Mpa | Rigid Bahu Jalan Mayor 1


07/04/2023

1. Monitoring pek. Bahu Jalan LPA Klas S Mayor 2


2. Monitoring Pek. Penanganan Longsoran STA 00+300 Ruas N.10
08/04/2023

1. Monitoring Produksi Beton fc 20 Mpa | Rigid Bahu Jalan Mayor 1 5 TM


2. Core Drill AC-BC Mayor 1
09/04/2023

1. Monitoring Produksi AC-WC (overlay mayor 1)


2. Core Drill AC-BC Mayor 1
10/04/2023

1. Monitoring Produksi AC-WC (overlay mayor 1)


2. Monitoring Suhu Campuran Aspal saat pemadatan di lapangan
11/04/2023 3. Pemeriksaan/ Timbang sampel CoreDrill AC-BC Mayor 1

1. CoreDrill AC-WC Mayor 1


12/04/2023 2. Uji Marshall Laston AC-BC

1. Trial Mix Beton fs 4,5 Mpa Fast Track 7 Hari


13/04/2023

14/04/2023

Muara Bungo, 28 Maret 2023


Diketahui Oleh, Dibuat Oleh,

Edy Sumihar Simanjuntak, ST Reki Setia Budiman, ST


Team Leader Lab. Technician
RINGKASAN KEGIATAN LAB. TECHNICIAN

Produksi Laston AC-BC Pemeriksaan Bukaan Pintu Cold Bin


Trial Compaction Laston AC-WC Produksi Laston AC-WC

Pembuatan Bricket Pengujian Marshall


RINGKASAN KEGIATAN LAB. TECHNICIAN

Monitoring Produksi Laston AC-WC Monitoring Produksi Laston AC-WC


Water Bath Pengambilan Sampel Produksi Laston AC-WC

Gradasi Klas A Core Drill Trial Compaction AC-WC