Shaft
Identification:
GENERAL CHECK
New jersey concrete barriers are in place around the prop. excavation
1
area.
2 Setting out is done by survey team based on approved shop drawings / det
Existing utilities(if any) are located & protected as per approved method
3 statement.
4 Dewatering scheme is operating satisfactorily.
2 -2.00 to -4.00 m
3 -4.00 to -6.00 m
4 -6.00 to -8.00 m
5 -8.00 to -10.00 m
6 -10.00 to -12.00 m
7 -12.00 to -14.00 m
8 -14.00 to -16.00 m
TOTAL DEPTH:
PSL QC Remarks Consultant' s Comments / Approval
Name & Signature of PSL QC inspector/ Engineer Name & Signature of the Supervising Consultant (Stantec)