C8516-CLT-QMT-0008 Rev.00-Inspection Checklist For Excavation of Deepshaft (Micro Tunneling)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

INSPECTION CHECKLIST FOR EXCAVATION OF DEEP SHAFT (MICRO TUNNEL)

Subject: Excavation of Deep Shaft (Micro tunnel) Date:


Location / Area: WIR. No.:
Chainage/
Depth: Dwg. Ref. No:

Shaft
Identification:
GENERAL CHECK

PSL Construction / PSL Inspectors / Consultant


S.No Activities to be checked Survey Engineers (Stantec)
(Initials & Date) (Initials (Initials & Date)
& Date)

New jersey concrete barriers are in place around the prop. excavation
1
area.

2 Setting out is done by survey team based on approved shop drawings / det
Existing utilities(if any) are located & protected as per approved method
3 statement.
4 Dewatering scheme is operating satisfactorily.

5 Type of Soil checked (Visual Inspection)

6 Check for Face stability: Checked every 2 meter depth of excavation

7 Formation level (Excavated surface) checked as per designated level.

8 Water Seepage (Y/N): Precautions applied & checked


STABILITY CHECK PER DEPTH
PSL Engineers / Consultant
Type of Soil / Rock Inspectors (Stantec)
SN Depth Range Strata Stability Remarks (Initials (Initials & Date)
& Date)
1 0 to -2.00 m

2 -2.00 to -4.00 m

3 -4.00 to -6.00 m

4 -6.00 to -8.00 m

5 -8.00 to -10.00 m

6 -10.00 to -12.00 m

7 -12.00 to -14.00 m

8 -14.00 to -16.00 m

TOTAL DEPTH:
PSL QC Remarks Consultant' s Comments / Approval

Name & Signature of PSL QC inspector/ Engineer Name & Signature of the Supervising Consultant (Stantec)

Date & Time: Date & Time:

C851/6-CLT-QMT-0008 REV 00

You might also like