Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project Name : Design and Build (DB) for FIFA Readiness Project 6 (FRP 6) for Surface and Ground

Water Network at Al Madinat Khalifa and


Immigration Underpass Scheme C851/6
Client : Ashghal Project Code: PA 2019 C 033 FPS
Consultant : Stantec Main Contractor : Petroserv Limited

PRESSURE TEST REPORT - SECONDARY IRRIGATION NETWORK


Inspection Request No : C851/6-WIR-CIV-
Start Date of Testing :
End Date of Testing :

Test Section Dia. of pipe Start Stop Elapsed Time


Sl. No Remarks
Road No. From To in Inches Pressure Pressure From To Total

Verified and Inspected


Petroserv Limited Stantec
Name Name
Desination Desination
Signature Signature
Date Date

C851/6-CLT-QMT-0014 Rev-00
26 July 2021