Download as pdf
Download as pdf
You are on page 1of 1
PLACEMENT ON PIPE @ FINISHED WELD WED cary FINISHED _CP_HANDY-CAP MATERIAL LIST ‘PROCEDURE Orn] ‘DESCRPTION TOK WO a] | sree Pre 2| 1 | menue wevoine unr (CADWELDER) FOR PIPE SIZES 3/4"70 J=1/2" 212560 FOR PIPE SIZES 4° AND LARGER 212533 3| 1 | caomero carreioce/conpucror 748 212606 4 | 1 | sreawoeo copper wire: £5 THN-THIN ~ BLACK 211555 Be Tins — Weare. 211559 FiO HOPE YELLOW LOCATOR WiRE 2iis71 #12 (FROM ANODE OR TEST STATION) 5| 1 | sosprer suzeve (reouen ow #10 # | 202785, #12 wre) | 1 | seer pamer 209785 7| 1 | ce mnor-cae (comsosion erorecnan cap | 209730 FOR EXOTHERMIC GROUNDING CONNECTION) 7 2) 3 2 6) BOGE ae AEN TRG FAP" ta) With & WIRE BRUSH OR BF LiGHRY LING STRIP COATING FROM, WIRE AS SHOWN AND WSTALL COPPER SLEEVE TO #10 & #12 ANG WIRES. WIRE SHOULD EXTEND 178" wero me Siéeve END. PACE CADWELD CARTRIOGE INTHE WELDER AND CONNECT THE CONTROL BOX LEXD TO THE CARTRIOGE CONDUCTOR TAB. ACTva ER THE CONTROL BOK WHILE FIRMLY HOLDING he WELDER PLACE: PROPER WELD. APPLY PRUIER TO SURFACE (4%x6" MIM). PRMLY APPLY TO THE PIPE'S EXPOSED SURFACE REMOVE THE OIE, THE JaNDY=08P MAYBE OUTED IF OTHER CoAT (ARGE EXPOSED AREAS (REF. GS-450). GENERAL NOTES. CONSTRUCTION STANDARD 1 | #10 ANG OP SWALLER CONDUCTORS MUST BE BUILT UP TO THE WELDER BY USING & COPPER ADAPTER SLEEVE. KEEP EXPOSED COPPER WIRE TO & MINIMUM. 3 | CLEA Moo AFTER USE. Fr THE OPENING OF CITY UTILITIES OF SPRINGFIELD, MISSOURI THERMITE WELDING PROCEDURE 05/05/2007, 65-415

You might also like