PD 4

PD
PD 3

1
PD 1

PD 2

PD
2

PD 2
PD 1

BIKE- PLANT WALKWAY


ACCESS RAMP PD
3

5.00
PD 4

BIKE- PLANT WALKWAY


5.00
PD 4 PD 3

WAY STRIP
PD 4

3.00 1.60
WAY STRIP
3.00 1.60

PLANT
STRIP
2.05
PLANT
STRIP
2.50
PEDESTRIAN
PEDESTRIAN CROSSING

CARRIAGE WAY
CROSSING 10.00

(3 LANES)
TYPICAL TREE SPACING

CARRIAGE WAY
PALM ROW TO SIGNAL INTERSECTION 10.00 PEDESTRIAN

11.00
CROSSING
PALM ROW TO SIGNAL INTERSECTION

14.44
5.00 PALM ROW TO SIGNAL INTERSECTION
PEDESTRIAN REFUGE TYPICAL PALM
SPACING 5.00 5.00
3.00
TYPICAL PEDESTRIAN REFUGE PEDESTRIAN REFUGE TYPICAL
PALM SPACING PALM SPACING 10.00
1.30

CENTER
ISLAND
ROAD WIDTH BIKE WAY

1.80
(SEE BLOW UP DETAIL "G")
1.80

2.00

CENTER
ISLAND
CENTER-LINE ROAD WIDTH

2.80
ACCESS RAMP CENTER-LINE
ACCESS RAMP BIKE WAY BIKE WAY

CARRIAGE
(SEE BLOW UP DETAIL "G")

(3 LANES)
(SEE BLOW UP DETAIL "G")

11.00

WAY
10.00

CARRIAGE
TYPICAL TREE SPACING ACCESS RAMP

14.46
WAY
0.50

WALKWAY PLANT BIKE- PLANT


STRIP WAY STRIP
1.60 3.00 2.50

WALKWAYPLANT BIKE- PLANT


STRIP WAY STRIP
1.46 3.00 2.39
5.00
PD 1

PD 4
2
PD PD 1

5.00
3
PD

PD
2 PD 3

ACCESS RAMP ACCESS RAMP

2
PD
PD 4

PD 3
BIKE WAY
(SEE BLOW UP DETAIL "G")

1
PD
PEDESTRIAN REFUGE

PD 4
PD 1

PD 4
PEDESTRIAN
CROSSING

TYPICAL PALM SPACING

PALM ROW TO SIGNAL INTERSECTION


5.00
1 URBAN STREETSCAPE SPOT DETAIL "A" 1 URBAN STREETSCAPE BLOW UP DETAIL "B"
2 1:100M 2 1:100M

Name Sign Date


OWNER : PROJECT TITLE : SUBMITTED BY : CHECKED and REVIEWED BY : RECOMMENDING APPROVAL: APPROVED BY:
DRAWN BY
CONSTRUCTION OF NEW CLARK CITY POSITIVE BUILDERS & TRADING URBAN INTEGRATED CONSULTANTS INCORPORATED
BASES CONVERSION DEVELOPMENT AUTHORITY CONNECTING ROAD PACKAGE 1 ENGINEERING
BCDA Corporate Center SCALE:
2/F Bonifacio Technology Center SHEET NO: MTR DWG No. REV.
CONTENT :
31st. St. cor, 2nd Ave. Bonifacio Global City
Taguig City, Philippines RYAN P. PINEDA RYAN S. GALURA 2
MANOLITO A. MAÑALAC EDMUNDO B. ONIAS REV1 DATE REV REV BY CHECKED BY: APPROVED BY:

Project Manager Project Manager Project Manager OIC-PMD Head Clark Project
BCDA BCDA