Hydro / Mobile Crane Inspection Checklist


Project site: Pre inspection
Subcontractor: Operator Name: Delivery
Register (PMA) No.: Monthly
Inspection date: Daily

No. Part Item Inspection method M T W T F S S Inspection photo


Overload When overloaded, the operation except
01.
limiter rotation will be stopped with alarm sound Overload limiter
Over winding
Before hook reaches to the top,
02. Prevention
operation stops with alarm sound Over-winding
device
stopper
Hook latch shouldn’t have any
03. Hook & Sheave abnormality such as detachment. Hook Brake & Clutch
and sheave should rotate smoothly

There should be no wire cut on wire


04. Wire rope
rope and end treatment should be good
Hook & Sheave
Balance should be kept for maximum
05. Outrigger expansion. More than 2 struts should not Outrigger Extension Pin
be used

Outrigger Certainly, in the fully withdrawn position


06.
Extension Pin where it will be fixed
Its weight should comply with manual
07. Counter weight and stably fixed without being arbitrarily Counter weight Hydraulic cylinder
manipulated
Hydraulic Hydraulic motor, cylinder, pipe should
08. system
not be worn, damaged and leak
and cylinder
Wire rope
Head, tail, fog, mars light should work
09. Lamps Lamps
normally

There should be no wire cut on wire


10. Wire rope
rope and end treatment should be good

Anti-break It shall be installed from drum to end Socket &


11. away of wire complying with manufacturer standard Anti-Brake away termination
rope to prevent from break away.
Socket and
Wire rope end termination including
wire
12. wedge socket size shall be complying
rope end
with safety standard.
termination

EXECUTION AND COMPLETION OF PROPOSED 1 BLOCK 35-STOREY OFFICE TOWER WITH 6-STOREY PODIUM
CARPARK AND 4-STOREY BASEMENT ON PART OF LOT PTB 24441, JALAN TRUS/ JALAN ABDULLAH IBRAHIM, JALAN
GEREJA, MUKIM BANDAR, DAERAH JOHOR DARUL TA’ZIM
Date: 25th NOVEMBER 2022
Doc No.: HSE/MCIC/CSCEM/007
TEMPLER RESIDENCE RAWANG Rev: 00
Page 2 of 2

Hydro / Mobile Crane Inspection Checklist


Day: Monday Tuesday Wednesday Thursday Friday Saturday Sunday

Date:

Inspector's /
operator
opinion

Inspector /
Operator
*(Name &
Signature, Daily
Basis)
Verify by Site
Supervisor /
Lifting
Supervisor

Inspector / Project
HSE REP
Operator Manager
(Name & Signature) (Name & Signature) (Name & Signature)

Note:
 Ensure that the crane is in good working condition.
 Pre-inspection before delivery at site to be conducted at supplier yard.
 Crane to be operated by competent operator registered with DOSH.
 Operator to hold valid CIDB and must be produced when required.
 Operator to hold valid driving license when driving crane on road.
 Crane to be inspected once arrival to project site.
 PMA and Competency of operator to be displayed at operator cabin.
 It is the operator’s responsibility to ensure that inspections are carried out.
 Operator to maintain a log book to record maintenance or any repair works carried out on
machinery.
 Site supervisor / lifting supervisor to ensure that operator has carried out inspection by
recording on checklist.
 HSE representative to review and verify that daily inspection has taken place.
 This checklist to be return to HSE department once completed weekly to be kept as record.

EXECUTION AND COMPLETION OF PROPOSED 1 BLOCK 35-STOREY OFFICE TOWER WITH 6-STOREY PODIUM
CARPARK AND 4-STOREY BASEMENT ON PART OF LOT PTB 24441, JALAN TRUS/ JALAN ABDULLAH IBRAHIM, JALAN
GEREJA, MUKIM BANDAR, DAERAH JOHOR DARUL TA’ZIM