Total QAD 58 0 5 0 4 0 0 0 0 0 0 0 0 0 3 0 6 0 0 0 0 0 0 0 0 0
PGA-SHE Arif Munandar 18 12 1 7 1 4 1 5 1 8 1 10 1
Prod. Plan & Inventory Control Hengki Cahyo N. 75 4 5 0 0 4 13 13
PAD Krw Logistics Opr. & Material Control #1 M Reza A. 475 3 142 9 93 2 4 2 21 8 78 6 121 7 127 7 249 257 348 72
( Amirul Chusni ) Logistics Opr. & Material Control # 2 Rinaldi 301 47 3 6 2 3 3 3 34 3 42 45 Suport (W) Relayout , Oil Part, Improvement & Running Test. Log Supp. Prjct.
PP & PC Agus Arifiyanto 25 3 3 2 2 3 3 3 3 25 25 2 2
Total PAD Krw 894 3 208 13 114 3 2 0 8 5 31 12 124 10 187 8 198 8 274 0 282 0 350 0 74 0
Utility Hanura 73 33 8 16 6 4 4 4 4 13 6 18 8 30 8 38 8
Plant Eng. Building Eng. F. Sales 10
(F. Sales)
SHE Anys Y 5 5 1 0 1 1 2 3 6
Total Plant Engineering 0 38 8 17 6 4 4 5 4 14 6 20 8 33 8 44 8 0 0 0 0 0 0 0 0
Press Production Engineering Irwan Nugraha 13 7 2 1 4 5 12 11 13 13 5 4
Body & Frame Production Engineering Hendri H 8 5 5 5 7 3 5 5 4 6 4 6 6 4 9 1 10 10 10 10
PED Toso Production Engineering A Bagus I 7 2 2 1 1 4 4 5 7 7 6 4
(Nicholas A) Assy Production Engineering Nova Evianto 6 6 4 3 6 7 6 5 8 8 7
Production Engineering Planning Nicholas A (*) 6 7 6 3 5 5 5 5 6 7 4 6
Vehicle Quality Prod Eng. Ndaru J 4 1 1 0 1 0 0 2 2 0
Total Production Engineering 132 5 28 5 21 3 0 0 14 5 20 6 26 6 33 4 35 1 46 0 47 0 32 0 24 0
Assembly Production Victor I S 548 18 4 6 82 94 82 323 323 10 0
PLANT # 2 Painting Production Agung Prasetyo 224 16 0 1 4 34 44 118 103 8 98
( I Nyoman W ) Welding Production & Inspection Pontjoyogo 504 23 37 23 24 22 17 38 20 27 18 67 31 77 10 264 9 273 6 129 240
AT Eng.Serv. & Maint. Anthonius H 50 16 2 6 10 32 36 36 19 15 15
Total Plant # 2 1326 23 87 23 30 0 0 0 22 17 51 20 123 18 227 31 239 10 741 9 718 6 162 0 353 0
TIIN 15
LPD 15
OTHERS
ISTD Pramono 8 3 4 4 4
Total Others 38 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 4 0 4 0 4 0 0 0 0 0
Note : 5638 71 1105 104 664 43 12 12 97 51 373 97 698 95 1078 93 1142 56 2347 17 2409 15 1262 9 1230 7
1.3% 19.6% 1.8% 11.8% 0.8% 0.2% 0.2% 1.7% 0.9% 6.6% 1.7% 12.4% 1.7% 19.1% 1.6% 20.3% 1.0% 41.6% 0.3% 42.7% 0.3% 22.4% 0.2% 21.8% 0.1%
Director DCO DH
MANPOWER ATTENDANCE PLANNING
PT. TOYOTA MOTOR MFG INDONESIA
KARAWANG PLANT NO PRODUCTION DAY ( 9 May 2020 ~ 19 May 2020) &
LEBARAN SHUTDOWN HOLIDAY ( 20 May 2020 ~ 1 Jun 2020 ) Update :
Nandi J I Nyoman W. Abdul M.S. Arif M. Bachtriar W. Hendri H.
May-19 Jun-19
Division Department PIC
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1
MP Remark
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N
Assy & Painting Assy Frame & PIO Dept Susilo * 213
Press & Welding Maintenance & Workshop KRW Dept Supriyanto 138
(I Nyoman W.) Plant Uti., Building Maint,GA & SHE Dept Enjang R. 79
4480 12 0 12 0 46 2 27 2 33 2 58 2 33 2 26 2 23 2 53 2 24 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2 4 2
Note :
0.3% 0.0% 0.3% 0.0% 1.0% 0.0% 0.6% 0.0% 0.7% 0.0% 1.3% 0.0% 0.7% 0.0% 0.6% 0.0% 0.5% 0.0% 1.2% 0.0% 0.5% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0% 0.1% 0.0%
Form Shutdown yg
Manager in sdh diisi
Division Department Piket Kehadiran
Charge
Manager Member
Assy & Painting Eng.Service Aji S. O O
Assy & Painting Maintenance Sulasdi O O
Assy & Painting Assy Production Pontjoyogo D. O O
Painting Production Aria Indratama O O
Frame Assy, PIO & Rectification Hengki C.N. O O
Body Production Wahyu DP O O
Frame Production Parlin B O O
Press Eng. Serv. Djoko P. O O
Press & Welding
Press Production M Mustofa O O
Press Welding Maint. & Workshop Supriyanto O O
Welding Eng Service & Insp Djoko P. O O
QC Eng.Project Roedy M. O O
QC Eng. Service Plant#1 Sigit Purnomo O O
QC Eng. Service Plant#2 M Dwira Aria O O
QCD
QC Inspection P#1 Anthonius H. O O
QC Inspection P#2 Herman P. O O
QC Planing Edy Susilo O O
Cust. Quality Audit Nova Evianto O O
Cust. Quality & Material Eng. Adhi Hanarto O O
QAD
EDER Project Dept Nur Purwanto O O
Qualty Planning Arie F. O O
Logistics Opr. Plant#1 Rinaldi O O
Logistics Opr. Plant# 2 Rinaldi O O
BR & PGA Arif Munandar O O
PAD Krw Employee Servis & SHE Ade Rohman O O
PPPC Yani K. O O
PPIC Ketut W. O O
TPS Group Victor IS O O
Environment Dept Hanura A.B. O O
Plant Eng.& SHED Utility & Plant Building Eng. Noto B. O O
Utility & Building Opr Veh. Karawang Enjang Ripandi O O
Assy Production Engineering Eka Fiskantoro O O
Body & Frame Production Engineering Agus S. O O
Press Production Engineering Daniel W. O O
PED
Production Engineering Planning Klemen Budi O O
Toso Production Eng. Gatot Widodo O O
Vehicle Quality Prod Eng. Mosadek O O
Assy Production Andrianto I. O O
AT Eng.Serv. Irvan A. O O
PLANT # 2
Painting Production Agung Prasetyo O O
Welding Production Isa Setyawan O O
LCD Muhammad Y. O O
OTHERS CEVD Arifarum N. O O
ISTD Bayu P. O O
JUMLAH KEHADIRAN MANPOWER -
PT. TOYOTA MOTOR MFG INDONESIA LEBARAN SHUTDOWN
KARAWANG PLANT LIBUR LEBARAN 1436H ( 15 - 22 Juli 2015 )
& NON PRODUCTION DAY( 23 - 24 Juli 2015 )
Jumlah MP Masuk Kerja
TOTAL MP
Division Department PIC CLASS 1 - 8 Lebaran Holiday Remark
15 16
WED THU
D % D %
Assembly Production Eka F 667 68 10% 158 24%
Painting Production Bachtiar W (*) 320 60 19% 59 18%
Assy Painting Maintenance Sulasdi 62 37 60% 11 18%
Assy & Painting AT Engineering Service Aria I 100 8 8% 7 7%
( Bachtiar W) PIO and Rectification Andrianto Iskandar 68 10 15% 10 15%
Assy Project Susilo 29 19 66% 3 10%
Painting Project Sudibyo 8 8 100% 3 38%
Total A&T 1254 210 17% 251 20%
Press Production Supriyanto 235 36 15% 11 5%
Body Production Edy Susilo D 504 68 13% 52 10%
Frame Production Luqman Utama 261 26 10% 22 8%
Press & Welding Press Eng. Serv. Parlin B 6 4 67% 1 17%
( Anang Sayogo ) Welding Eng. Serv. & Insp. Wahyu Dwi Poetranto 155 50 32% 21 14%
PW Maintenance & Workshop M Mustofa 122 61 50% 53 43%
P & W Project Arief Mustofa 42 33 79% 35 83%
Total P&W 1325 278 21% 195 15%
Q C Eng 1 Herman P 21
Q C Eng 2 M Dwira Aria 10 2 20% 0%
QCD QC Planning Djoko P 14 4 29% 0%
(Maruli S) QC Eng. Service Sigit Purnomo 51 16 31% 2 4% - CMM Calibration dan Calibration Tool's
QC Inspection P#1 Isa Setyawan 308 48 16% 26 8%
QC Inspection P#2 Ketut Wismantara 207 0 0
Total QCD 611 70 11% 28 5%
Cust. Quality Eng. Aripin 16 1 6%
QAD Cust. Quality Audit Arie F 21 3 14% 3 14%
(Daniel D) Quality Planning M Fuadi 21 1 5% 1 5%
Material Assurance Project M Hasanuddin 0
Total QAD 58 5 9% 4 7%
PGA-SHE Arif Munandar 18 12 67% 7 39%
Prod. Plan & Inventory Control Hengki Cahyo N. 75 2 3% 2 3%
PAD Krw Logistics Opr. & Material Control #1 M Reza A. 475 90 19% 93 20%
Suport (W) Relayout , Oil Part, Improvement & Running
( Amirul Chusni ) Logistics Opr. & Material Control # 2 Rinaldi 301 47 16% 6 2% Test. Log Supp. Prjct.
PP & PC Agus Arifiyanto 25 3 12% 3 12%
Total PAD Krw 894 154 17% 111 12%
Utility Hanura 73 33 45% 16 22%
Plant Eng.
Building Eng. F. Sales 10
(F. Sales)
SHE Anys Y 5 5 100% 1
Total Plant Engineering 88 38 43% 17 22%
Press Production Engineering Irwan Nugraha 13 7 54% 2 15%
Body & Frame Production Engineering Hendri H 8 5 63% 7 88%
PED Toso Production Engineering Gatot W 7 2 29% 2 29%
(Nicholas A) Assy Production Engineering Nova Evianto 6 6 100% 4 67%
Production Engineering Planning Nicholas A (*) 7 7 100% 6 86%
Vehicle Quality Prod Eng. Ndaru J 4 1 25% 0
Total Production Engineering 45 28 62% 21 47%
Assembly Production Victor I S 548 6 1% 4 1%
PLANT # 2 Painting Production Agung Prasetyo 224 16 7% 0 0%
( I Nyoman W ) Welding Production & Inspection Pontjoyogo 504 37 7% 24 5%
AT Eng.Serv. & Maint. Anthonius H 50 16 32% 2 4%
Total Plant # 2 1326 75 6% 30 2%
TIIN 15
LPD 15
OTHERS
ISTD Pramono 8 0 0
Total Others 38 0 0% 0 0%