Nama : Kirana Candraningtyas DATA DRILLING LOGS

NIM : 201111019 Lokasi : Padalarang 18 Business Park


Kelas : 3A-KGE Kedalaman Fondasi : 30 m
Matkul : RKP-2 Jenis Fondasi : Tiang Pancang
Dimensi Penampang : 30 x 30 cm, 40 x 40 xm, 50 x 50 cm
Produsen Fondasi : WIKA BETON

Analisa Daya Dukung Tiang Pancang Diameter 30 cm Berdasarkan data N SPT dengan persamaan Mayerhof

A Berdasarkan data N SPT I BH-1 (Diameter 30 cm)

Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa


N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
1.55 0.45 2.7 2.7 2.86
Lempung 6 120 0.07 0.07
2.00 1.55 6 9.3 12 3.00
3.55 0.45 5.4 17.4 5.90
12 240 0.07 0.07
4.00 1.55 12 18.6 36 6.16
Lempung
5.55 0.23 2.76 38.76 24.10
50 1000 0.07 0.07
5.78 1.77 12 21.24 60 24.40
7.55 0.22 2.2 62.2 47.98
50 2000 0.07 0.07
7.77 1.78 10 17.8 80 48.23
9.55 0.20 2 82 48.26
Pasir 50 2000 0.07 0.07
9.75 1.80 10 18 100 48.51
11.55 1.25 12.5 112.5 48.69
50 2000 0.07 0.07
12.80 0.75 10 7.5 120 48.80
13.55 0.22 2.64 122.64 23.55
50 1000 0.07 0.07
13.77 1.78 12 21.36 144 25.58
15.55 0.23 2.76 146.76 25.62
50 1000 0.07 0.07
15.78 1.77 12 21.24 168 25.92
Lempung
17.55 0.45 5.4 173.4 10.46
17 340 0.07 0.07
18.00 1.55 12 18.6 192 10.72
19.55 0.45 5.4 197.4 12.68
21 420 0.07 0.07
20.00 1.55 12 18.6 216 12.94
Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa
N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
21.55 0.45 5.4 221.4 15.85
27 540 0.07 0.07
22.00 1.55 12 18.6 240 16.11
23.55 0.45 5.4 245.4 23.25
42 840 0.07 0.07
24.00 1.55 12 18.6 264 23.51
Lempung
25.55 0.25 3 267 27.32
sangat 50 1000 0.07 0.07
25.80 1.75 12 21 288 27.62
Kaku
27.55 0.22 2.64 290.64 27.66
50 1000 0.07 0.07
27.77 1.78 12 21.36 312 27.96
29.55 0.23 2.76 314.76 28.00
50 1000 0.07 0.07
29.78 0.22 12 2.64 317.4 28.03

B Berdasarkan Data N SPT I BH-2 (Diameter 30 cm)

Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa


N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
1.55 0.45 3.15 3.15 3.34
Lempung 7 140 0.07 0.07 7
2.00 1.55 10.85 14 3.49
3.55 0.45 5.4 19.4 6.87
14 280 0.07 0.07
4.00 1.55 12 18.6 38 7.13
5.55 0.25 3 41 24.13
50 1000 0.07 0.07
5.80 1.75 12 21 62 24.43
Lempung
7.55 0.45 5.4 67.4 24.50
50 1000 0.07 0.07
8.00 1.55 12 18.6 86 24.77
9.55 0.45 5.4 91.4 24.84
50 1000 0.07 0.07
10.00 1.55 12 18.6 110 25.10
11.55 1.22 12.2 122.2 48.83
Batu Pasir 50 2000 0.07 0.07
12.77 0.78 10 7.8 130 48.94
13.55 0.20 2.4 132.4 23.55
50 1000 0.07 0.07
13.75 1.80 12 21.6 154 25.73
15.55 0.23 2.76 156.76 25.77
50 1000 0.07 0.07
15.78 1.77 Lempung 12 21.24 178 26.07
Pasir
Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa
N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
17.55 0.25 Pasir 3 181 26.11
50 1000 0.07 0.07
17.80 1.75 12 21 202 26.40
19.55 0.22 2.64 204.64 26.44
50 1000 0.07 0.07
19.77 1.78 12 21.36 226 26.74
21.55 0.45 5.4 231.4 26.82
50 1000 0.07 0.07
22.00 1.55 12 18.6 250 27.08
23.55 0.45 5.4 255.4 27.16
50 1000 0.07 0.07
24.00 1.55 12 18.6 274 27.42
Lempung
25.55 0.45 5.4 279.4 27.50
Sangat 50 1000 0.07 0.07
26.00 1.55 12 18.6 298 27.76
Keras
27.55 0.22 2.64 300.64 27.80
50 1000 0.07 0.07
27.77 1.78 12 21.36 322 28.10
29.55 0.23 2.76 324.76 28.14
50 1000 0.07 0.07
29.78 0.22 12 2.64 327.4 28.18

Analisa Daya Dukung Tiang Pancang Diameter 40 cm Berdasarkan data N SPT dengan persamaan Mayerhof

A Berdasarkan Data N SPT I BH-1 (Diameter 40 cm)

Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa


N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
1.55 0.45 2.7 2.7 5.09
Lempung 6 120 0.13 0.13
2.00 1.55 6 9.3 12 5.33
3.55 0.45 5.4 17.4 10.49
12 240 0.13 0.13
4.00 1.55 12 18.6 36 10.95
Lempung
5.55 0.23 2.76 38.76 42.84
50 1000 0.13 0.13
5.78 1.77 12 21.24 60 43.37
7.55 0.22 2.2 62.2 85.30
50 2000 0.13 0.13
7.77 1.78 10 17.8 80 85.74
9.55 0.20 2 82 85.79
Pasir 50 2000 0.13 0.13
9.75 1.80 10 18 100 86.25
Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa
N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
11.55 1.25 12.5 112.5 86.56
50 2000 0.13 0.13
12.80 0.75 10 7.5 120 86.75
13.55 0.22 2.64 122.64 41.87
50 1000 0.13 0.13
13.77 1.78 12 21.36 144 45.48
15.55 0.23 2.76 146.76 45.55
50 1000 0.13 0.13
15.78 1.77 12 21.24 168 46.09
Lempung
17.55 0.45 5.4 173.4 18.59
17 340 0.13 0.13
18.00 1.55 12 18.6 192 19.06
19.55 0.45 5.4 197.4 22.54
21 420 0.13 0.13
20.00 1.55 12 18.6 216 23.01
21.55 0.45 5.4 221.4 28.17
27 540 0.13 0.13
22.00 1.55 12 18.6 240 28.64
23.55 0.45 5.4 245.4 41.33
42 840 0.13 0.13
24.00 1.55 12 18.6 264 41.80
Lempung
25.55 0.25 3 267 48.57
sangat 50 1000 0.13 0.13
25.80 1.75 12 21 288 49.10
Kaku
27.55 0.22 2.64 290.64 49.17
50 1000 0.13 0.13
27.77 1.78 12 21.36 312 49.70
29.55 0.23 2.76 314.76 49.77
50 1000 0.13 0.13
29.78 0.22 12 2.64 317.4 49.84

B Berdasarkan Data N SPT I BH-2 (Diameter 40 cm)

Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa


N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
1.55 0.45 3.15 3.15 5.94
Lempung 7 140 0.13 0.13 7
2.00 1.55 10.85 14 6.21
3.55 0.45 5.4 19.4 12.21
14 280 0.13 0.13
4.00 1.55 12 18.6 38 12.68
5.55 0.25 3 41 42.90
50 1000 0.13 0.13
5.80 1.75 12 21 62 43.42
Lempung
Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa
N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
Lempung
7.55 0.45 5.4 67.4 43.56
50 1000 0.13 0.13
8.00 1.55 12 18.6 86 44.03
9.55 0.45 5.4 91.4 44.16
50 1000 0.13 0.13
10.00 1.55 12 18.6 110 44.63
11.55 1.22 12.2 122.2 86.80
Batu Pasir 50 2000 0.13 0.13
12.77 0.78 10 7.8 130 87.00
13.55 0.20 2.4 132.4 41.87
50 1000 0.13 0.13
13.75 1.80 12 21.6 154 45.74
15.55 0.23 2.76 156.76 45.80
50 1000 0.13 0.13
15.78 1.77 Lempung 12 21.24 178 46.34
17.55 0.25 Pasir 3 181 46.41
50 1000 0.13 0.13
17.80 1.75 12 21 202 46.94
19.55 0.22 2.64 204.64 47.01
50 1000 0.13 0.13
19.77 1.78 12 21.36 226 47.54
21.55 0.45 5.4 231.4 47.68
50 1000 0.13 0.13
22.00 1.55 12 18.6 250 48.15
23.55 0.45 5.4 255.4 48.28
50 1000 0.13 0.13
24.00 1.55 12 18.6 274 48.75
Lempung
25.55 0.45 5.4 279.4 48.89
Sangat 50 1000 0.13 0.13
26.00 1.55 12 18.6 298 49.35
Keras
27.55 0.22 2.64 300.64 49.42
50 1000 0.13 0.13
27.77 1.78 12 21.36 322 49.96
29.55 0.23 2.76 324.76 50.02
50 1000 0.13 0.13
29.78 0.22 12 2.64 327.4 50.09
Analisa Daya Dukung Tiang Pancang Diameter 50 cm Berdasarkan data N SPT dengan persamaan Mayerhof

A Berdasarkan Data N SPT I BH-1 (Diameter 50 cm)

Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa


N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
1.55 0.45 2.7 2.7 7.96
Lempung 6 120 0.20 0.20
2.00 1.55 6 9.3 12 8.32
3.55 0.45 5.4 17.4 16.38
12 240 0.20 0.20
4.00 1.55 12 18.6 36 17.11
Lempung
5.55 0.23 2.76 38.76 66.94
50 1000 0.20 0.20
5.78 1.77 12 21.24 60 67.77
7.55 0.22 2.2 62.2 133.27
50 2000 0.20 0.20
7.77 1.78 10 17.8 80 133.97
9.55 0.20 2 82 134.05
Pasir 50 2000 0.20 0.20
9.75 1.80 10 18 100 134.76
11.55 1.25 12.5 112.5 135.25
50 2000 0.20 0.20
12.80 0.75 10 7.5 120 135.54
13.55 0.22 2.64 122.64 65.42
50 1000 0.20 0.20
13.77 1.78 12 21.36 144 71.07
15.55 0.23 2.76 146.76 71.18
50 1000 0.20 0.20
15.78 1.77 12 21.24 168 72.01
Lempung
17.55 0.45 5.4 173.4 29.05
17 340 0.20 0.20
18.00 1.55 12 18.6 192 29.78
19.55 0.45 5.4 197.4 35.22
21 420 0.20 0.20
20.00 1.55 12 18.6 216 35.95
21.55 0.45 5.4 221.4 44.01
27 540 0.20 0.20
22.00 1.55 12 18.6 240 44.75
23.55 0.45 5.4 245.4 64.58
42 840 0.20 0.20
24.00 1.55 12 18.6 264 65.31
Lempung
25.55 0.25 3 267 75.90
sangat 50 1000 0.20 0.20
25.80 1.75 12 21 288 76.72
Kaku
Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa
N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
Kaku
27.55 0.22 2.64 290.64 76.82
50 1000 0.20 0.20
27.77 1.78 12 21.36 312 77.66
29.55 0.23 2.76 314.76 77.77
50 1000 0.20 0.20
29.78 0.22 12 2.64 317.4 77.87

B Berdasarkan Data N SPT I BH-2 (Diameter 50 cm)

Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa


N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
1.55 0.45 3.15 3.15 9.28
Lempung 7 140 0.20 0.20 7
2.00 1.55 10.85 14 9.71
3.55 0.45 5.4 19.4 19.08
14 280 0.20 0.20
4.00 1.55 12 18.6 38 19.81
5.55 0.25 3 41 67.03
50 1000 0.20 0.20
5.80 1.75 12 21 62 67.85
Lempung
7.55 0.45 5.4 67.4 68.06
50 1000 0.20 0.20
8.00 1.55 12 18.6 86 68.79
9.55 0.45 5.4 91.4 69.00
50 1000 0.20 0.20
10.00 1.55 12 18.6 110 69.73
11.55 1.22 12.2 122.2 135.63
Batu Pasir 50 2000 0.20 0.20
12.77 0.78 10 7.8 130 135.94
13.55 0.20 2.4 132.4 65.42
50 1000 0.20 0.20
13.75 1.80 12 21.6 154 71.46
15.55 0.23 2.76 156.76 71.57
50 1000 0.20 0.20
15.78 1.77 Lempung 12 21.24 178 72.40
17.55 0.25 Pasir 3 181 72.52
50 1000 0.20 0.20
17.80 1.75 12 21 202 73.35
19.55 0.22 2.64 204.64 73.45
50 1000 0.20 0.20
19.77 1.78 12 21.36 226 74.29
21.55 0.45 5.4 231.4 74.50
50 1000 0.20 0.20
22.00 1.55 12 18.6 250 75.23
Dept Li Jenis qc Ap Ast fi Li.fi Σli.fi Pa
N SPT
(m) (m) Tanah (t/m²) (m²) (m) (t/m²) (t/m) (t/m) (ton)
23.55 0.45 5.4 255.4 75.44
50 1000 0.20 0.20
24.00 1.55 12 18.6 274 76.17
Lempung
25.55 0.45 5.4 279.4 76.38
Sangat 50 1000 0.20 0.20
26.00 1.55 12 18.6 298 77.11
Keras
27.55 0.22 2.64 300.64 77.22
50 1000 0.20 0.20
27.77 1.78 12 21.36 322 78.06
29.55 0.23 2.76 324.76 78.16
50 1000 0.20 0.20
29.78 0.22 12 2.64 327.4 78.27