Fixing of HOV Valve
Fixing of HOV Valve
Page no:-
Removal of ROSOV and fixing of HOV
Permite
No:-
TEAM MEMBERS : Mr. Ravinder Verma, Mr. S.Shanmugaraj , Mr. Aspak Bagban
Prepared by: Mr. S.Shanmugaraj Sign: ___________ Reviewed by: Mr. Aspak Bagban Sign: ___________
1 Work start-up Unauthorized work Obtain a hot work permit before starting the job PTW applicant
& obtaining Supervisor
PTW Invalid permit Get the permit validated for the specific day PTW holder
Lack of competency Supervisor must ensure that all work activities are
carried out by competent personnel
Lack or poor Conduct Toolbox meeting, review the Method
communication statement and Job safety analysis to all craftsmen
involved in the work activities.
Haste or shortcut Responsible person will conduct inspection,
monitor the work activities and have to ensure
safety standards and procedures are strictly
adhered to.
Project: Fixing of HOV
JOB SAFET ANALYSIS
Ref No.: IOTL//Maint/
Rev No.: 0
Page no:-
Removal of ROSOV and fixing of HOV
Permite
No:-