Customer Name: M/s.

RS Concrete
Location: Bangalore
Date: 16.03.2023
Cost Sheet for Plant
Sr.No Description Basic Price Qty Sub Total IGST @ 18% TCS @ 0.1% Total
1 M1CR with 3Nos Screw Conveyors 6,800,000.00 1 6,800,000.00 1,224,000.00 8,024.00 8,024,000.00
- - - -
Total 6,800,000.00 1,224,000.00 8,024.00 8,024,000.00

Cost Sheet for Silo & Silo Acc


Sr.No Description Basic Price Qty Sub Total IGST @ 18% TCS @ 0.1% Total
1 Cement Silo 600,000.00 3 1,800,000.00 324,000.00 2,124.00 2,124,000.00
2 Bottom Filter 300,000.00 1 300,000.00 54,000.00 354.00 354,000.00
3 Silo Acc 95,000.00 3 285,000.00 51,300.00 336.30 336,300.00
4 Blower 500,000.00 1 500,000.00 90,000.00 590.00 590,000.00
Total 2,885,000.00 519,300.00 3,404.30 3,404,300.00
Note: The above prices are excluding Transportation
Quote valid for 15 days only
Delivery Lead time 2 - 3 Weeks
Above price includes Engineer Supervision for errection
Customer need to provide Cranes, Manpower and all civil works for successful Commissioning of plant
AC & Water Pump as per the requirement to be supplied by customer
Suitable DG, Loader as per requirement to be supplied by customer

Cost Sheet for Pump & PLA


Sr.No Description Basic Price Qty Sub Total IGST @ 18% TCS @ 0.1% Total
1 SP1407 1,925,000.00 1 1,925,000.00 346,500.00 2,271.50 2,271,500.00
2 SP1807 2,325,000.00 1 2,325,000.00 418,500.00 2,743.50 2,743,500.00
3 100M PLA 520,000.00 2 1,040,000.00 187,200.00 1,227.20 1,227,200.00

Total 5,290,000.00 952,200.00 6,242.20 6,242,200.00


Note: The above prices are excluding Transportation
Quote valid for 15 days only
Delivery Lead time 2 - 3 Weeks
Above price includes Engineer Supervision for errection
Customer need to provide Cranes, Manpower and all civil works for successful Commissioning of plant