Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

Y Jamel.

Yaakob.
E n g i n e e r ( O p e r a t i o n S h i f t )

0192057585 ABOUT ME
jamely@tnb.com.my
I have previously work in multiple set up,
Klang, Selangor An independent,
allowing me to improve relevant technical skills
committed, hardworking to prepare me for the job being offer. I take
ownership of my tasks and willing to go the
and a reliable person extra mile to achieve or exceed expectations
SKILLS seeking career where possible.

 Process & Maintain Workplace advancement within TNB


Information
 Power Plant Maintenance Planning
EXPERIENCE
 SAP System
 Hazard Identification Risk Assessment Engineer (Operation Shift) – Level 6
 PI navigation and data collection TPGCB REMACO TNB Power Generation Sdn. Bhd Selangor
 Language – Malay (Good)| English 3 May 2021 - present
(Average)
 Computer: MS Office MS Excel
Responsible to:
 Ensure safe, efficient and reliable main plant including related auxiliaries
 Issued PTW for M&E works with Safe Isolation and normalization
EDUCATION  Monitor and analyze plant operational performance
 Implement timely action to rectify operational defects
Diploma Electrical Engineering (Power)
 Monitor, capture and manage operational data and plant status. Communicate
Politeknik Port Dickson
report in a timely manner.
2000 – 2001
 Manage staff welfare, leave coverage and performance appraisal including
competency requirements.
Certificate Electrical Engineering
 Ensure Daily report submission to Sniggle Buyers such DAD, DSOS and DASA
(Petroleum)
 Ensure compliance to statutory requirement such as DOSH, EQA etc.
Politeknik Kuching Sarawak
 Achievements
1998 – 1999
o Maintain unplanned outage rate
SPM/SPMV o Zero number of tripping on my working Shift from May 2021
Sekolah Menengah Vokasional P. Langkawi o Certified as Permit Issuer for Confine Space Works
1995-1997 o Zero Medical Leave at for since I posting to CBSB.

Safety
CERTIFICATION  Maintains Safe Working environment by following standard working
Procedures such as Issued PTW implement LOTO
Electrical Chargeman (B4)  Continues Monitoring Fire Fighting Alarm true management on common Area
22 November 2016 – 13 April 2025 and Operation Plant.
 Involving to performed and comply with pre start-up safety review during
start-up
 Act as One Since Commanded during Emergency
 Certified as Permit Issuer for Confine Space Works
EXPERIENCE -
Shift Charge Executive/ Operation Shift – Level 6
TPGSB GEN & EV TNB Power Generation Sdn. Bhd Putrajaya
1 July 2020 - 3 May 2021

Eksekutif Teknik / Jurutera – Giliran – Level 6


Production Shift, Generation – SJ Putrajaya
Putrajaya / 14 October 2014 – 1 July 2020
Responsible to:
 Ensure safe, efficient and reliable main plant including related auxiliaries
 Monitor and analyze plant operational performance
 Implement timely action to rectify operational defects
 Monitor, capture and manage operational data and plant status. Communicate report in a timely manner.
 Manage staff welfare, leave coverage and performance appraisal including competency requirements.
 Ensure on the job training program for operators is being carried out effectively according to yearly OJT training plan
 Ensure compliance to statutory requirement such as DOSH, EQA etc.
 Carried Training weekly for ERT Team including Operation and Maintenance Team
Achievements
Certified Chargman B4 33KV (Restricted TNB Generation) 2016
Successful Carried out yearly as Once since Commander
REGISTERED Ice Engineer Grade 2,
1.Fail Oral
2.Absent Exam paper 2- Failed due to transferred to CBSB
Eksekutif Teknik – Alat & Kawalan – E07-08
REMACO TNB Repair & Maintenance Sdn. Bhd Bakun, Sarawak
5 March 2013 – 14 October 2014

Responsible to:
 Seconded to Sarawak Hydro Sdn. Bhd. (Bakun)
 Planning Commission activities related to Electrical and Instrument for 4 x 300MW ALSTOM and 4x300 MW IMPSA
 To Plant Maintenance Activities related to Electrical and C&I section after COD
 Received a letter of appreciation for involvement in the Bakun project

Eksekutif Teknik – Elektrikal – E07-08


MTCE Electrical, SSJ C. Highlands - Penjanaan Cameron Highlands, Tapah, Perak
4 May 2009 - 5 March 2013

Responsible to:
 Promoted to Executive E07 Electrical Maintenance SSJ Cameron Highland
 To recommend budget (CAPEX & OPEX) related to C&I section 
 To Maintains all precision are registered and calibrated
 To Plan Outage Activities related to Electrical, Control and Instrument
 Arrangement with OEM on C/B servicing
 Ensure PM and CM are Carried out timely manner

Juruteknik T/Biasa – Control Operator CO- TT09 -10


Production Shift, SJS Paka - Penjanaan Paka, Terengganu
1 January 2003 - 4 May 2009

Responsible to:
 Lead & manage each team member (operators and Patrolman in ensuring his shift work execution and instruction. 
 Act as a leader for safe plant electrical isolations prior to the issuance of Permit to Work
 Handover process to next shift with precise information on plant status and follow up actions.  
 Demonstrate and encourage staff to demonstrate personal integrity and high ethics when delivering work. 
 Monitor performance parameter on MV and LV board, participated On-The-Job Training.
 Carried out routine reading followed Work Instruction

Juruteknik T/Biasa. Electrical Maintenance Section -TT09


TNG. STN Jan Sultan Ismail Paka
1 July 2002 - 1 January 2003

Responsible to:

 Carried out Maintenance on electrical equipment’s such as Circuit Breaker, Motorize Valve, Electrical motor, Transformer. Etc
 Carried out Corrective action within the time period set by the supervisor
 Ensure precision using are calibrated and Valid date
 Comply ISO 14001 and 9000

LEARNING HISTORY
Learning History

AESP

E-LEARNING MODUL INTEGRITI & TNB CORPORATE INTEGRITY MANAGEMENT SYSTEM

ONLINE

Completion date 4 Aug 2022

Complete

UNDERSTANDING, EVALUATING AND IMPLEMENTING EFFECTIVE HIRARC AT THE WORKPLACE

ILT

Completion date 26 May 2022

Complated

E-LEARNING MODUL INTEGRITI & TNB CORPORATE INTEGRITY MANAGEMENT SYSTEM

ONLINE

Completion date 24 Mar 2022

Complete
TAKLIMAT KESEDARAN DO’S AND DON’TS DI BAWAH PROSEDUR TATATERTIB TNB EDISI KETUJUH
2021, TCIMS DAN POLISI-POLISI DI DALAMNYA & RA

ONLINE

Completion date 24 Mar 2022

Complete

TAKLIMAT KESEDARAN DO’S AND DON’TS DI BAWAH PROSEDUR TATATERTIB TNB EDISI KETUJUH
2021, TCIMS DAN POLISI-POLISI DI DALAMNYA & RA

ONLINE

Completion date 22 Mar 2022

Complete

Tenaga Safety Passport (TSP) + CIDB

DIGITAL

Completion date 22 Dec 2021

Digital Learning Complete

TAKLIMAT INTEGRITI

ONLINE

Completion date 20 Oct 2021

Complete

Office Ergonomic E-Learning

ONLINE

Completion date 19 Oct 2021

Complete

TNB GenCo Reimagining Culture

ONLINE

Completion date 14 Apr 2021

Complete
HAZARD IDENTIFICATION RISK ASSESSMENT DETERMING CONTROL (HIRADC)

ILT

Completion date 31 Mar 2021

Complete

CYBER SECURITY MODULES AWARENESS 101

ONLINE

Completion date 23 Aug 2020

Complete

AUTHORISED ENTRANT AND STANDBY PERSON (AESP) FOR CONFINED SPACE

ILT

Completion date 10 Mar 2020

Complete

BASIC OCCUPATIONAL FIRST AID, CPR & AED TRAINING

ILT

Completion date 17 Jul 2019

Complete

CYBER SECURITY MODULES PHISHING 102

ONLINE

Completion date 23 Jun 2019

Complete

INTERNAL COMBUSTION ENGINE (ICE) ENGINEER GRADE 2

ILT

Completion date 16 May 2019

Complete
ISO 14001:2015 - AWARENESS

ILT

Completion date 5 Mar 2019

Complete

Cyber Security Modules Phishing 101

ONLINE

Completion date 1 Aug 2018

Complete

INTERNAL COMBUSTION ENGINE (ICE) DRIVER GRADE 2

ILT

Completion date 17 Aug 2017

Complete

HEALTH, SAFETY & ENVIRONMENT HANDHOLDING

ILT

Completion date 11 Jul 2017

Complete

Peperiksaan PJE Khas B4

ILT

Completion date 26 Aug 2016

Complete
Penyegerakan Sistem Voltan Tinggi

ILT

Completion date 29 Jul 2016

Complete

SYSTEM GRID HV SWITCHING AND BLACK START OPERATION

ILT

Completion date 27 May 2016

Complete

SUBSTATION MAINTENANCE (MALIM NAWAR)

ILT

Completion date 20 May 2016

Complete

SUBSTATION MAINTENANCE (MALIM NAWAR)

ILT

Completion date 18 May 2016

Complete
Sistem Kendalian 33kV

ILT

Completion date 29 Apr 2016

Complete

ON SCENE COMMANDER

ILT

Completion date 14 Apr 2016

Complete

FUNDAMENTAL OF POWER PLANT OPERATION

ILT

Completion date 1 Apr 2016

Complete

SAFETY IN ENGINEERING ENVIRONMENT PART 2 GENERAL

ILT

Completion date 25 Mar 2016

Complete

HIGH VOLTAGE GENERATOR AVR AND GENERATOR MAINTENANCE & TESTING PJE TERHAD B4 (KHAS
TNB)

ILT

Completion date 4 Mar 2016

Complete

AKTA BEKALAN ELEKTRIK

ILT

Completion date 26 Feb 2016

Complete
BASIC POWER PLANT ELECTRICAL DISTRIBUTION SYSTEM

ILT

Completion date 29 Jan 2016

Complete

UNINTERRUPTIBLE POWER SUPPLY AND BATTERY SYSTEM

BLENDED

Completion date 22 Jan 2016

Complete

7 HABITS FOR HIGHLY OF EFFECTIVE PEOPLE (EXECUTIVE)

ILT

Completion date 25 Nov 2015

Complete

HAZARDOUS CHEMICAL & OIL EXPOSURE RISK

ILT

Completion date 19 Nov 2015

Completed

Sesi Taklimat BO & B4

ILT

Completion date 16 Jun 2015

Complete

KENDALIAN PENCAWANG SETAKAT 33KV MODUL 1-PENGENALAN SISTEM 33KV UNTUK EKSEKUTIF

ILT

Completion date 10 Jun 2015

Complete

SAFE AND EFFICIENT OPERATION


ILT

Completion date 9 Apr 2015

Complete

OPERATIONAL OVERVIEW OF CHARGEMAN FUNCTION IN POWER PLANT

ILT

Completion date 27 Mar 2015

Complete

GAS TURBINE POWER PLANT OPERATION TECHNOLOGY

ILT

Completion date 12 Feb 2015

Completed

SCM : SRM Strategic Purchaser User

ILT

Completion date 29 Nov 2012

Complete

SESI TAKLIMAT ESS - EPM & OJA

ILT

Completion date 21 Nov 2012

Complete

LEADERS DETERMINE PERFORMANCE

ILT

Completion date 13 Sep 2012

Complete
BENGKEL TNA TNI STESENJANAKUASA HIDRO

ILT

Completion date 4 Jul 2012

Complete

FLUKE THERMAL IMAGER TRAINING

ILT

Completion date 7 May 2012

Complete

RELIABILITY CENTERED MAINTENANCE (RCM)

ILT

Completion date 5 Apr 2012

Complete

SESI PENERANGAN DASAR & PROSEDUR PEROLEH

ILT

Completion date 15 Mar 2012

Complete

You might also like