REPORT ON
GEOTECHNICAL INVESTIGATIONS
May 2023
1.1 General 1
1.2 Scope of Work 1
1.3 Methodology 2
2 FIELD INVESTIGATIONS 3
2.1 General 3
2.2 Drilling of Exploratory Boreholes 3
2.3 In-situ Testing 4
2.3.1 Standard Penetration Test (SPT) 4
2.4 Sampling 4
2.5 Groundwater Observations 5
3 LABORATORY TESTING 6
3.1 General 6
3.2 Particle Size Distribution 6
3.3 Atterberg Limits 6
3.4 Specific Gravity 7
3.5 Bulk Density 7
3.6 Direct Shear 7
3.7 Unconfined Compression 7
3.8 Chemical Analyses of Soil 7
4.1 General 8
4.2 Topography 8
4.3 Stratigraphy 8
4.4 Chemical Aggressivity 9
4.5 Site Classification 9
4.6 Seismicity 9
4.7 Groundwater Observations 9
5 FOUNDATION DESIGN 10
5.1 General 10
5.2 Type of Foundation 10
5.3 Design Parameters 10
5.4 Shallow Foundations 11
7 REFERENCES 14
Figures
Tables
APPENDIX-D Photographs
1.1 General
The Client, M/s Lahore Smart City (LSC), intends to construct a 250-bed hospital in
Lahore Smart City (LSC), Kala Shah Kaku (KSK). The hospital will be a 15-storey
structure, consisting of a basement, ground floor and 15 additional floors. M/s Berkeley
Associates (Pvt.) Ltd. (BAL) has been contracted to conduct geotechnical
investigations at the designated site.
The entire fieldwork was carried out under the fulltime supervision of site
geologists/supervisors of M/s Berkeley Associates (Pvt.) Ltd.
The fieldwork for these geotechnical investigations was carried out from April 30, 2023
to May 12, 2023.
- Drilling of total nine (09) exploratory boreholes; eight (08) down to 30.5m (100
ft) depth and one (01) down to 46.5m (150 ft) depth below existing ground level
(EGL) using hydraulic feed straight rotary technique.
1.3 Methodology
Field investigations were carried out in accordance with the scope of work. The
exploratory borings were advanced using rotary wash boring technique. Standard
Penetration Tests (SPTs) were performed in all the boreholes in accordance with
ASTM D 1586.
Soil samples were collected from designated depths from each borehole for
identification and subsequent laboratory testing. Selected soil samples were subjected
to various laboratory tests for classification, estimation of strength and chemical
characteristics.
The report has been compiled based on the geotechnical investigations conducted at
the project site and the subsequent laboratory testing performed on the selected soil
and water samples. It includes an assessment of the subsurface soil stratigraphy,
foundation design parameters and recommendations regarding the allowable bearing
capacity of shallow foundations, as well as the chemical aggressivity of subsurface
soil.
The locations of all the investigation points are indicated on the Geotechnical
Investigation Plan, as illustrated in Fig. 2-1 in Appendix-A.
2.1 General
A total of nine (09) exploratory boreholes were conducted at the site, with eight (08)
drilled to a depth of 30.5 meters (100 feet) below the existing ground level (EGL) and
one (01) drilled to a depth of 46.5 meters (150 feet) below EGL. All the boreholes were
drilled using straight rotary drilling rig and the holes were stabilized by circulating
bentonite mud in the holes The diameter of all the boreholes is approximately 150mm.
Split spoon sampler was used without liner and SPTs were performed in these
boreholes at 1.0m depth interval down to 30m depth and thereafter at 1.5m interval
down to maximum drilled depth of 46.5m. Undisturbed soil samples were collected
from cohesive strata using Denison tubes.
Borehole logs were maintained to document all materials encountered during drilling
and data from the Standard Penetration Tests (SPTs) conducted in each borehole was
recorded on these logs. These borehole logs, as well as photographs taken in the field,
can be found in Appendix-B and Appendix-D, respectively.
The locations of the boreholes drilled during these investigations are depicted on the
Geotechnical Investigations Plan, which is provided in Fig. 2-1 of Appendix-A.
During these field investigations, in-situ Standard Penetration Test (SPT) was
performed in each borehole. A brief discussion of the in-situ test in boreholes is
provided below.
2.4 Sampling
Disturbed soil samples were obtained from the boreholes through split spoon sampler
while performing SPTs. The disturbed samples were placed in polythene bags and
preserved in wide-mouthed plastic jars. The jars were clearly labelled to indicate the
project name, project code, borehole designation and depth of sampling.
Undisturbed soil samples were obtained from the boreholes at designated depths by
using Shelby/Denison samplers. The undisturbed soil samples were properly waxed
and labelled to indicate the project name, project code, borehole designation and depth
of sampling.
All soil samples were transported with great care to the laboratory testing facility of M/s
Berkeley Associates (Pvt) Ltd., located in Lahore, for subsequent laboratory testing.
3.1 General
The following sections provide a brief description of these tests, while a summary of
the laboratory test results is presented in Table 3-1, which can be found in Appendix-
A.
For classifying the subsurface soils, ninety-two (92) selected soil samples were
subjected to grain size analyses during these studies. The sieve analyses were
performed in accordance with the procedures specified in ASTM D-422. The
percentage of fines (passing sieve no. 200) and sand/gravel fractions of the tested soil
samples are also indicated in Table 3-1 (Appendix-A). Results of grain size analyses
were plotted in the form of gradation curves and are presented in Appendix-C.
Atterberg limits were performed on thirty-eight (38) selected soil samples. The tests
were performed as specified in ASTM D-4318. All these tests were performed with at
least three trials. The test results are summarized in Table 3-1 and Casagrande’s
Plasticity Chart has been attached as Fig. 3-1 in Appendix-A, respectively.
Fifteen (15) soil samples were tested for the estimation of specific gravity. The tests
were carried out in accordance with ASTM D-854. The test results are provided in Table
3-1 (Appendix-A). Its value ranges from 2.65 to 2.73.
Fifteen (15) soil samples were tested for the determination of bulk density. The test
results are summarized in Table 3-1 (Appendix-A). Its value ranges from 17.6 kN/m3
to 19.8 kN/m3.
In order to estimate shear strength characteristics of foundation soils, seven (07) soil
samples were subjected to direct shear tests. The tests were carried out in accordance
with the procedure explained in ASTM D-3080. The test results are provided in Table
3-1 (Appendix-A). Its value ranges from 31.2 to 37.2 degrees. The corresponding
laboratory test sheets are attached in Appendix-C.
In order to determine the chemical characteristics of the subsoil, one (01) selected soil
sample was tested for estimation of chemical composition. The results are summarized
in Table 3-1 (Appendix-A).
Sulfate
The sulfate content of the tested soil sample is 0.09%.
Chloride
The chloride content of the tested soil sample is 0.05%.
4.1 General
The geotechnical investigations for the project involved a combination of field and
laboratory work The field and laboratory investigations were aimed at evaluating the
engineering characteristics of the foundation soils. The subsurface conditions and
engineering and chemical characteristics of the soils existing at the proposed project
site are discussed in the following sections.
4.2 Topography
The topography of the project site is predominately flat. The alluvial deposits were
encountered in the project area which mainly consist of flood plain deposits. As
provided by the Client, ground elevation of all boreholes is taken as El.0.00m.
4.3 Stratigraphy
• Loose man-made Fill Material overlying the 1st natural soil layer, comprises
Clayey Silt/Silty Clay intermixed with gravel. It varies in thickness from 0.3m to
0.6m.
• The 1st natural soil layer comprises LEAN CLAY / SILTY CLAY that extends
to maximum depth of 5.0m below EGL.
• The 2nd natural soil layer comprises SILTY SAND / POORLY GRADED SAND
with SILT which extends to maximum explored depth of 46.5m below EGL.
Some small pockets of Lean Clay have also been observed in some boreholes.
The above information has been detailed on the respective borehole logs and linear
subsurface profiles developed on the basis of borehole logs as shown in Fig. 4-1 to
Fig 4-3 (Appendix-A).
On the basis of concentrations of sulfates determined in the foundation soil and water
samples collected from boreholes, the severity is classified as "Not Applicable" with
“Class S0” as explained in ACI 318M-08 Table 4.2.1. Based on the concentrations of
sulfates, it is recommended to use Ordinary Portland Cement (OPC) for substructure.
In accordance with the Building Code of Pakistan (Ref. 7.2), the criteria for
classification of uncemented soil profiles are to be based on;
• 𝑣̅𝑠 = average shear wave velocity of the top 100 ft (30 m).
or
• ̅ 𝑜𝑟 ̅̅̅̅̅
𝑁 𝑁𝑐ℎ = average field SPT resistance for the top 100 ft (30 m).
or
• 𝑠̅𝑢 = average undrained shear strength for the top 100 ft (30 m).
4.6 Seismicity
According to the Building Code of Pakistan (BCP-2021) Table C-1 issued by Pakistan
Engineering Council (Ref. 7.2), the spectral acceleration with ground motion level at
2% probability of exceedance in 50 years (2475 Years Return Period) for Lahore City
is as follows:
Short-Period Spectral Response acceleration (0.2-second), Ss = 0.49
Long-Period Spectral Response acceleration (1-second), S1= 0.14
Design parameters have been selected on the basis of field & laboratory test results,
literature and engineering judgement. Evaluations have been made for allowable
bearing pressures for the shallow foundations which are discussed in the following
sections.
Field and laboratory test data have been used to determine the foundation design
parameters. Following soil parameters are recommended for design of shallow
foundations below existing ground level;
Sr. Depth
Material Type Selected Parameters
No. (m)
The type and depth of footings, design criteria and net allowable bearing pressures are
discussed in the following sections.
For evaluation of allowable bearing pressures, the following two criteria are adopted;
i- The allowable load should not initiate shear failure of the foundation
soils, and
The allowable bearing pressures as provided in this report are for normal axial loads
on level ground. For eccentric loading conditions, the axial load, Pa will be:
Pa = qa . Aeff
Since, the allowable bearing pressures are controlled by settlement criteria therefore
Factor of Safety (FS) should be taken as 1.0.
The soils at foundation level should be carefully inspected prior to placing the
foundations to ensure that the soils are similar to those encountered in the boreholes.
For any different soil conditions, geotechnical engineer must be consulted prior to
initiating foundation construction.
̅) observed
3. On the basis of average field standard penetration resistance (𝑁
down to 15m depth, the site soil as per Building Code of Pakistan should be
classified as Site Class D (Stiff Soil).
SYMBOL DESCRIPTION
BH-08
BH-04 46.5m (150ft) DEEP BOREHOLE
BH-03 BH-05
BH-02 BH-01
BH-06 CLIENT:
LAHORE SMART CITY
PROJECT:
Smart 250-Bed Hospital
AR
ba
berkeley
Berkeley Associates (Pvt) Ltd
Consulting Engineers
10
15
20
Depth (m)
25
30
35
40
45
50
55
60
BH-1 BH-2 BH-3 BH-4 BH-5 Average N
10
15
20
Depth (m)
25
30
35
40
45
50
55
60
BH-6 BH-7 BH-8 BH-9 Average N
10
15
Depth (m)
20
25
30
35
40
45
50
BH-1 BH-2 BH-3 BH-4 BH-5 Average N
10
15
Depth (m)
20
25
30
35
40
45
50
BH-6 BH-7 BH-8 BH-9 Average N
50
40
Plasticity Index (PI)
30
CH
CL
20
CL - ML
10 MH & OH
ML & OL
0
0 10 20 30 40 50 60 70 80 90 100
Liquid Limit (%)
2'-6"
E.G.L (El. 0'-0")
SQUARE/STRIP
FOOTING
12'-0"
BASEMENT FLOOR LEVEL (El. -12'-0")
4'-6"
FOUNDATION LEVEL (El. -16'-6")
2'-6"
E.G.L (El. 0'-0")
RAFT/MAT
FOUNDATION
12'-0"
LAHORE SMART CITY (LSC)
BASEMENT FLOOR LEVEL (El. -12'-0")
SMART 250-BED HOSPITAL
AT LAHORE SMART CITY (KSK)
4'-6"
SCHEMATIC SKETCH FOR FOUNDATION
Distance(m)
Distance (m)
Distance (m)
Distance (m)
250
Allowable Bearing Pressures (kPa)
200
Gross Allowable Bearing Pressure
100
50
Fig. 5-2 Net / Gross Allowable Bearing Pressure for Mat Foundatins placed at El. -5.0m i.e at
1.0m below basement level of El. -4.0m.
Berkeley
Associates (Pvt) Ltd
Consulting Engineers
160
Net Allowable Bearing Pressures (kPa)
140
120
80
60
Fig. 5-1 Net Allowable Bearing Pressure for Square/ Strip footings placed at El. -5.0m i.e at
1.0m below basement level of El. -4.0m.
Berkeley
Associates (Pvt.) Ltd.
Consulting Engineers
SPT-1 1.00 0.34 18.29 54.68 26.69 31.6 11.5 CL Lean Clay with Sand
UDS-1 1.50 2.70 0.00 8.05 74.66 17.29 24.1 4.2 18.64 17.32 171.33 7.9 CL-ML Silty Clay
SPT-8 8.00 0.00 90.29 9.71 - SP-SM Poorly Graded Sand with Silt
BH-1
SPT-11 11.00 0.20 89.17 10.63 - 0.2 37.2 SP-SM Poorly Graded Sand with Silt
SPT-16 16.00 0.72 9.52 60.32 29.45 32.6 11.3 CL Lean Clay
SPT-28 28.00 0.00 93.06 6.94 - SP-SM Poorly Graded Sand with Silt
SPT-1 1.00 0.00 10.76 63.54 25.71 30.3 9.9 CL Lean Clay
SPT-2 2.00 0.00 1.80 68.94 29.27 31.0 10.2 CL Lean Clay
UDS-1 2.50 2.73 2.95 7.41 61.14 28.51 32.3 11.1 19.74 17.19 374.59 7.9 CL Lean Clay
SPT-3 3.00 0.90 8.30 64.14 26.67 30.8 9.8 CL Lean Clay
SPT-4 4.00 0.00 0.70 80.64 18.67 26.1 6.9 CL-ML Silty Clay
BH-2 SPT-7 7.00 0.00 93.06 6.94 - 1.5 33.1 SP-SM Poorly Graded Sand with Silt
SPT-15 15.00 0.50 7.55 61.79 30.16 32.6 11.3 CL Lean Clay
SPT-19 19.00 0.00 93.40 6.60 - SP-SM Poorly Graded Sand with Silt
SPT-1 1.00 0.4 4.22 66.96 28.42 32.1 11.2 CL Lean Clay
UDS-1 1.50 2.73 8.71 10.18 56.94 24.18 31.9 11.6 19.33 17.79 146.49 10.0 CL Lean Clay with Sand
SPT-2 2.00 3.75 3.39 68.91 23.96 28.9 8.8 CL Lean Clay
SPT-3 3.00 0.00 1.05 74.41 24.54 29.1 8.8 CL Lean Clay
SPT-4 4.00 0.00 0.75 78.61 20.65 25.1 5.1 CL-ML Silty Clay
SPT-5 5.00 0.00 91.94 8.06 - SP-SM Poorly Graded Sand with Silt
SPT-10 10.00 0.00 96.55 3.45 - 2.1 35.3 SP Poorly Graded Sand
SPT-15 15.00 7.30 24.30 50.75 17.65 26.3 5.8 CL-ML Sandy Silty Clay
SPT-29 29.00 0.00 94.67 5.33 - SP-SM Poorly Graded Sand with Silt
Berkeley
Associates (Pvt.) Ltd.
Consulting Engineers
UDS-1 1.50 2.71 9.32 18.18 50.39 22.12 28.3 8.2 18.51 17.00 199.50 7.9 CL Lean Clay with Sand
UDS-2 2.50 2.73 0.00 0.05 70.17 29.79 31.6 11.2 18.95 18.57 171.61 6.4 CL Lean Clay
SPT-3 3.00 0.00 0.43 86.83 12.75 24.1 4.2 CL-ML Silty Clay
SPT-4 4.00 0.00 90.02 9.98 - SP-SM Poorly Graded Sand with Silt
BH-4
SPT-6 6.00 0.00 87.89 12.11 - 0.20 33.00 SM Silty Sand
SPT-10 10.00 1.26 88.93 9.81 - SP-SM Poorly Graded Sand with Silt
SPT-30 30.50 0.00 89.22 10.78 - SP-SM Poorly Graded Sand with Silt
Berkeley
Associates (Pvt.) Ltd.
Consulting Engineers
UDS-1 1.50 2.71 1.91 12.20 62.02 23.88 28.9 8.9 18.80 18.42 150.23 10.6 CL Lean Clay
SPT-3 3.00 0.00 0.99 86.69 12.33 24.2 4.3 CL-ML Silty Clay
BH-5 SPT-30 30.50 3.40 88.10 8.50 - SP-SM Poorly Graded Sand with Silt
UDS-2 36.50 2.72 0.00 0.05 76.16 23.79 30.3 8.6 18.69 21.06 258.32 11.4 CL Lean Clay
SPT-38 42.00 0.00 89.78 10.22 0.00 SP-SM Poorly Graded Sand with Silt
SPT-1 1.00 1.32 22.11 55.29 21.29 30.2 10.1 CL Lean Clay with Sand
UDS-1 1.50 2.73 0.00 2.40 67.54 30.06 33.3 12.1 19.98 14.68 171.93 3.6 CL Lean Clay
SPT-2 2.00 0.36 8.07 67.95 23.63 31.3 10.3 CL Lean Clay
UDS-2 2.50 2.71 3.55 0.29 71.36 24.81 30.0 9.6 19.89 17.08 167.35 10.0 CL Lean Clay
SPT-3 3.00 0.00 2.04 75.63 22.34 31.1 10.2 CL Lean Clay
SPT-4 4.00 0.00 0.42 80.86 18.72 25.0 5.1 CL-ML Silty Clay
SPT-11 11.00 0.00 94.96 5.04 - SP-SM Poorly Graded Sand with Silt
SPT-18 18.00 0.00 90.39 9.61 - SP-SM Poorly Graded Sand with Silt
SPT-22 22.00 0.76 90.08 9.16 - SP-SM Poorly Graded Sand with Silt
UDS-1 1.50 2.72 6.93 6.89 64.81 21.38 28.7 8.7 19.29 15.24 65.99 7.1 CL Lean Clay
UDS-2 2.50 2.73 0.00 1.22 75.27 23.51 29.0 8.9 19.12 18.50 225.00 6.4 CL Lean Clay
UDS-3 3.50 2.70 0.00 0.55 77.77 21.68 28.7 8.4 19.09 18.93 126.30 7.1 CL Lean Clay
SPT-10 10.00 0.00 90.02 9.98 - SP-SM Poorly Graded Sand with Silt
SPT-20 20.00 0.00 94.28 5.72 - SP-SM Poorly Graded Sand with Silt
UDS-1 1.50 2.70 3.95 11.22 67.19 17.65 27.8 7.6 18.23 17.17 39.25 4.3 CL Lean Clay with Sand
SPT-3 3.00 0.00 0.15 77.09 22.77 29.3 8.9 CL Lean Clay
SPT-15 15.00 0.00 89.86 10.14 - 0.1 37.0 SP-SM Poorly Graded Sand with Silt
SPT-30 30.50 3.08 85.62 11.30 - SP-SM Poorly Graded Sand with Silt
UDS-1 1.50 2.72 18.00 6.60 53.30 22.11 28.3 8.6 19.75 14.09 74.36 4.3 CL Lean Clay with Gravel
SPT-3 3.00 0.00 0.22 81.02 18.76 26.3 5.9 CL-ML Silty Clay
BH-9 SPT-4 4.00 0.00 30.93 60.23 8.84 Non-Plastic ML Sandy Silt
SPT-23 23.00 0.00 94.20 5.80 0.00 SP-SM Poorly Graded Sand with Silt
SPT-24 24.00 26.19 38.56 30.04 5.22 22.9 3.2 SM Silty Sand with Gravel
APPENDIX – B
(BOREHOLE LOGS)
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
8 SPT-8 DS 8 8
11 May 2023
9 SPT-9 DS 9 14
10 SPT-10 DS 10 12
11 SPT-11 DS 11 14
12 SPT-12 DS 12 17
13 SPT-13 DS 13 20
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 19
15 SPT-15 DS 15 20
16 m
16 SPT-16 DS EL -16 m 16 9
UDS-3 UDS
17 SPT-17 DS LEAN CLAY (CL); brownish to grey; stiff to very 17 20
stiff; wet; trace mica 17 m
18 SPT-18 DS EL -17 m 18 15
SILTY SAND (SM) to POORLY GRADED SAND
19 SPT-19 DS with SILT (SP-SM); medium dense; grey; trace 19 21
mica
20 SPT-20 DS 20 23
21 SPT-21 DS 21 24
22 SPT-22 DS 22 26
23 SPT-23 DS 23 28
24 SPT-24 DS 24 50
25 SPT-25 DS 25 54
26 SPT-26 DS 26 54
27 SPT-27 DS 27 57
28 SPT-28 DS 28 74
29 SPT-29 DS 29 64
30 SPT-30 DS 30 55
30.5 m
EL -30.5 m
31 31
Bottom of the borehole at (30.5m)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-02
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 9, 2023 JOB #: J-827
Smart City FINISHED: May 10, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417236.97, 11509850.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
8 SPT-8 DS 8 8
10 May 2023
9 SPT-9 DS 9 9
10 SPT-10 DS 10 13
11 SPT-11 DS 11 15
12 SPT-12 DS 12 18
13 SPT-13 DS 13 15
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 13
15 m
15 SPT-15 DS EL -15 m 15 8
UDS-2 UDS
16 SPT-16 DS LEAN CLAY (CL); stiff; brown; trace concretion
16 m 16 22
EL -16 m
17 SPT-17 DS SILTY SAND (SM) to POORLY GRADED SAND 17 19
with SILT (SP-SM); dense to medium dense;
18 SPT-18 DS grey; wet; trace mica; trace concretion 18 21
19 SPT-19 DS 19 21
20 SPT-20 DS 20 26
21 SPT-21 DS 21 27
22 SPT-22 DS 22 24
23 SPT-23 DS 23 26
24 SPT-24 DS 24 22
25 SPT-25 DS 25 25
26 SPT-26 DS 26 30
27 SPT-27 DS 27 48
28 SPT-28 DS 28 58
29 SPT-29 DS 29 51
30 SPT-30 DS 30 50
30.5 m
EL -30.5 m
31 31
Bottom of the borehoe at (30.5)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-03
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 8, 2023 JOB #: J-827
Smart City FINISHED: May 9, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417236.97, 11509890.8 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
2 SPT-2 DS 2 10
3 SPT-3 DS 3 11
4 SPT-4 DS 4 10
5m
5 SPT-5 DS EL -5 m 5 20
8 SPT-8 DS 8 10
09 May 2023
9 SPT-9 DS 9 16
10 SPT-10 DS 10 19
11 SPT-11 DS 11 15
12 SPT-12 DS 12 21
13 SPT-13 DS 13 15
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 22
15 m
15 SPT-15 DS EL -15 m 15 24
20 SPT-20 DS 20 29
21 SPT-21 DS 21 32
22 SPT-22 DS 22 31
23 SPT-23 DS 23 38
24 SPT-24 DS 24 39
25 SPT-25 DS 25 33
26 SPT-26 DS 26 50
27 SPT-27 DS 27 60
28 SPT-28 DS 28 66
29 SPT-29 DS 29 62
30 SPT-30 DS 30 61
30.5 m
EL -30.5 m
31 31
Bottom of the borehole at (30.5m)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-04
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 5, 2023 JOB #: J-827
Smart City FINISHED: May 7, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417290.72, 11509930.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
3 SPT-3 DS 3 9
4m
4 SPT-4 DS EL -4 m 4 13
7 SPT-7 DS 7 11
8 SPT-8 DS 8 9
07 May 2023
9 SPT-9 DS 9 10
10 SPT-10 DS 10 12
11 SPT-11 DS 11 25
12 SPT-12 DS 12 19
13 SPT-13 DS 13 9
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 15
15 SPT-15 DS 15 16
16 SPT-16 DS 16 18
17 SPT-17 DS 17 22
18 SPT-18 DS 18 14
19 SPT-19 DS 19 16
20 SPT-20 DS 20 19
21 SPT-21 DS 21 20
22 SPT-22 DS 22 21
23 SPT-23 DS 23 29
24 SPT-24 DS 24 27
25 SPT-25 DS 25 29
26 SPT-26 DS 26 39
27 SPT-27 DS 27 49
28 SPT-28 DS 28 45
29 SPT-29 DS 29 40
30 SPT-30 DS 30 41
30.5 m
EL -30.5 m
31 31
Bottom of the borehole at (30.5)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-05
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 5, 2023 JOB #: J-827
Smart City FINISHED: May 7, 2023 FINAL DEPTH: 46.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417320.72, 11509890.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 2
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
8 SPT-8 DS 8 9
07 May 2023
9 SPT-9 DS 9 13
10 SPT-10 DS 10 15
11 SPT-11 DS 11 12
12 SPT-12 DS 12 16
13 SPT-13 DS 13 15
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 16
15 SPT-15 DS 15 15
16 SPT-16 DS 16 16
17 SPT-17 DS 17 19
18 SPT-18 DS 18 24
19 SPT-19 DS 19 20
20 SPT-20 DS 20 29
21 SPT-21 DS 21 28
22 SPT-22 DS 22 22
23 SPT-23 DS 23 24
24 SPT-24 DS 24 25
25 SPT-25 DS 25 40
26 SPT-26 DS 26 48
27 SPT-27 DS 27 50
28 SPT-28 DS 28 52
29 SPT-29 DS 29 46
30 SPT-30 DS 30 54
31 31
SPT-31 DS 54
32 32
Disclaimer: This log is intended for geotechnical purposes.
50
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
32 32
(continued)
33 SPT-32 DS 33 50
SILTY SAND (SM) to POORLY GRADED SAND
34 with SILT (SP-SM); brownish to grey; medium 34
SPT-33 DS dense; moist to wet; trace mica; trace concretion 39
35 35
36 m
36 SPT-34 DS EL -36 m 36 20
UDS-2 UDS
37 LEAN CLAY (CL); brownish to grey; very stiff to 37
SPT-35 DS hard; moist 37 m 45
38 EL -37 m 38
SILTY SAND (SM) to POORLY GRADED SAND
39 SPT-36 DS with SILT (SP-SM); grey; very dense; wet; 39 63
trace mica
40 40
SPT-37 DS 51
41 41
(78)
42 SPT-38 DS 42 78
43 43
SPT-39 DS 53
44 44
45 SPT-40 DS 45 70
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
46 46
46.5 m
SPT-41 DS EL -46.5 m 70
47 47
Bottom of the borehole at (46.50m)
48 48
49 49
50 50
51 51
52 52
53 53
54 54
55 55
56 56
57 57
58 58
59 59
60 60
61 61
62 62
63 63
64 64
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-06
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 11, 2023 JOB #: J-827
Smart City FINISHED: May 12, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417370.72, 11509840.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
8 SPT-8 DS 8 15
12 May 2023
9 SPT-9 DS 9 10
10 SPT-10 DS 10 14
11 SPT-11 DS 11 9
12 SPT-12 DS 12 12
13 SPT-13 DS 13 26
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 19
15 SPT-15 DS 15 14
16 SPT-16 DS 16 15
17 SPT-17 DS 17 20
18 SPT-18 DS 18 26
19 SPT-19 DS 19 18
20 SPT-20 DS 20 19
21 SPT-21 DS 21 21
22 SPT-22 DS 22 20
23 SPT-23 DS 23 27
24 SPT-24 DS 24 28
25 SPT-25 DS 25 35
26 SPT-26 DS 26 41
27 SPT-27 DS 27 45
28 SPT-28 DS 28 51
29 SPT-29 DS 29 48
30 SPT-30 DS 30
30.5 m
EL -30.5 m 46
31 31
Bottom of the borehole at (30.5m)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-07
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: April 30, 2023 JOB #: J-827
Smart City FINISHED: May 1, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417320.72, 11509974.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
01 May 2023
9 SPT-9 DS 9 14
10 SPT-10 DS 10 17
11 SPT-11 DS 11 17
12 SPT-12 DS 12 15
13 SPT-13 DS 13 13
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 26
15 SPT-15 DS 15 17
16 SPT-16 DS 16 24
17 SPT-17 DS 17 15
18 SPT-18 DS 18 17
19 SPT-19 DS 19 20
20 SPT-20 DS 20 19
21 SPT-21 DS 21 26
22 SPT-22 DS 22 20
23 SPT-23 DS 23 33
24 SPT-24 DS 24 40
25 SPT-25 DS 25 33
26 SPT-26 DS 26 47
27 SPT-27 DS 27 36
28 SPT-28 DS 28 41
29 SPT-29 DS 29 42
30 SPT-30 DS 30 45
30.5 m
EL -30.5 m
31 31
Bottom of the borehole at (30.5m)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-08
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 3, 2023 JOB #: J-827
Smart City FINISHED: May 4, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417370.72, 11509934.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
3 SPT-3 DS 3 9
4m
4 SPT-4 DS EL -4 m 4 10
04 May 2023
9 SPT-9 DS 9 12
10 SPT-10 DS 10 10
11 SPT-11 DS 11 16
12 SPT-12 DS 12 21
13 SPT-13 DS 13 14
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 27
15 SPT-15 DS 15 18
16 SPT-16 DS 16 18
17 SPT-17 DS 17 15
18 SPT-18 DS 18 17
19 SPT-19 DS 19 19
20 SPT-20 DS 20 17
21 SPT-21 DS 21 18
22 SPT-22 DS 22 21
23 SPT-23 DS 23 23
24 SPT-24 DS 24 26
25 SPT-25 DS 25 28
26 SPT-26 DS 26 37
27 SPT-27 DS 27 41
28 SPT-28 DS 28 58
29 SPT-29 DS 29 49
30 SPT-30 DS 30 50
30.5 m
EL -30.5 m
31 31
Bottom of the borehole at (30.5m)
32 32
Disclaimer: This log is intended for geotechnical purposes.
BOREHOLE LOG: BH-09
PROJECT: Smart 250-Bed Hospital at Lahore STARTED: May 2, 2023 JOB #: J-827
Smart City FINISHED: May 3, 2023 FINAL DEPTH: 30.5m
LOCATION: KalaShah Kaku (KSK) DEPTH OF GWT: 7.5 m LOGGED BY: M.Ali Chughtai
COORDINATES: 1417370.72, 11509970.88 DRILLING Straight Rotary CHECKED BY: M.R
GROUND ELEV.: 0.00 m METHOD:
SHEET: 1 of 1
NOTES:
DRILLING DETAIL
SAMPLES
SPT / 0.3 m
Depth (m)
LEGEND
SPT PROFILE
GWT
DESCRIPTION
No. Type
0 25 50 75
Ground Surface EL 0 m
0 0
Rotary Drilled Boring (conventional)
03 May 2023
9 SPT-9 DS 9 8
10 SPT-10 DS 10 11
11 SPT-11 DS 11 10
12 SPT-12 DS 12 16
13 SPT-13 DS 13 8
RSLog / Lahore Smart City-250 bed Hospital / berkeley-associates-private-limited / admin / May 16, 2023 01:54 AM
14 SPT-14 DS 14 25
15 SPT-15 DS 15 14
16 SPT-16 DS 16 22
17 SPT-17 DS 17 4
18 SPT-18 DS 18 20
19 SPT-19 DS 19 18
20 SPT-20 DS 20 19
21 SPT-21 DS 21 21
22 SPT-22 DS 22 22
23 SPT-23 DS 23 24
24 SPT-24 DS 24 21
25 SPT-25 DS 25 40
26 SPT-26 DS 26 39
27 SPT-27 DS 27 44
28 SPT-28 DS 28 49
29 SPT-29 DS 29 50
30 SPT-30 DS 30 54
30.5 m
EL -30.5 m
31 31
Bottom of the borehole at (30.5m)
32 32
Disclaimer: This log is intended for geotechnical purposes.
APPENDIX – C
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
UDS-2 (2.5 m) 0.25 60.56 39.19 0.00
50
SPT-3 (3.0 m) 0.00 72.07 27.93 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-1 (1.0 m) UDS-1 (1.5 m) SPT-2 (2.0 m) UDS-2 (2.5 m) SPT-3 (3.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-11 (11.0 m) 0.20 89.17 10.63 0.00
50
SPT-14 (14.0 m) 0.45 95.62 3.93 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-4 (4.0 m) SPT-5 (5.0 m) SPT-8 (8.0 m) SPT-11 (11.0 m) SPT-14 (14.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-24 (24.0 m) 0.00 78.16 21.84 0.00
50
SPT-28 (28.0 m) 0.00 93.06 6.94 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-16 (16.0 m) SPT-17 (17.0 m) SPT-21 (21.0 m) SPT-24 (24.0 m) SPT-28 (28.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-24 (24.0 m) 0.00 0.00 100.00 0.00
50
SPT-28 (28.0 m) 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-30 (30.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-3 (3.0 m) 0.90 8.30 64.14 26.67
50
SPT-4 (4.0 m) 0.00 0.70 80.64 18.67
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-1 (1.0 m) SPT-2 (2.0 m) UDS-1 (2.5 m) SPT-3 (3.0 m) SPT-4 (4.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-15 (15.0 m) 0.50 7.55 61.79 30.16
50
SPT-19 (19.0 m) 0.00 93.40 6.60 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-5 (5.0 m) SPT-7 (7.0 m) SPT-13 (13.0 m) SPT-15 (15.0 m) SPT-19 (19.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
NIL 0.00 0.00 100.00 0.00
50
SPT-19 (19.0 m) 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-24 (24.0 m) SPT-27 (27.0 m) SPT-30 (30.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-4 (4.0 m) 0.00 0.75 78.61 20.65
50
SPT-5 (5.0 m) 0.00 91.94 8.06 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-1 (1.0 m) SPT-2 (2.0 m) SPT-3 (3.0 m) SPT-4 (4.0 m) SPT-5 (5.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-17 (17.0 m) 1.23 85.01 13.76 0.00
50
SPT-23 (23.0 m) 0.00 83.45 16.55 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-6 (6.0 m) SPT-10 (10.0 m) SPT-15 (15.0 m) SPT-17 (17.0 m) SPT-23 (23.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-17 (17.0 m) 0.00 0.00 100.00 0.00
50
SPT-23 (23.0 m) 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-26 (26.0 m) SPT-29 (29.0 m) UDS-1 (1.5)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-4 (4.0 m) 0.00 90.02 9.98 0.00
50
SPT-6 (6.0 m) 0.00 87.89 12.11 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
UDS-1 (1.50 m) UDS-2 (2.5 m) SPT-3 (3.0 m) SPT-4 (4.0 m) SPT-6 (6.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
70 SPT-30 (30.50
0.00 89.22 10.78 0.00
Percentage Passing (%)
m)
60
NIL 0.00 0.00 100.00 0.00
50
NIL 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-10 (10.0 m) SPT-19 (19.0 m) SPT-30 (30.50 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-15 (15.0 m) 0.00 84.94 15.06 0.00
50
SPT-30 (30.0 m) 3.40 88.10 8.50 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
UDS-1 (1.50 m) SPT-3 (3.0 m) SPT-4 (4.0 m) SPT-15 (15.0 m) SPT-30 (30.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-41 (46.5 m) 0.00 87.70 12.30 0.00
50
SPT-30 (30.0 m) 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
UDS-2 (36.5 m) SPT-35 (37.5 m) SPT-38 (42.0 m) SPT-41 (46.5 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
UDS-2 (2.5 m) 3.55 0.29 71.36 24.81
50
SPT-3 (3.0 m) 0.00 2.04 75.63 22.34
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-1 (1.0 m) UDS-1 (1.5 m) SPT-2 (2.0 m) UDS-2 (2.5 m) SPT-3 (3.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-11 (11.0 m) 0.00 94.96 5.04 0.00
50
SPT-14 (14.0 m) 22.40 59.55 18.05 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-4 (4.0 m) SPT-5 (5.0 m) SPT-8 (8.0 m) SPT-11 (11.0 m) SPT-14 (14.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-28 (28.0 m) 0.00 86.27 13.73 0.00
50
NIL 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-18 (18.0 m) SPT-22 (22.0 m) SPT-25 (25.0 m) SPT-28 (28.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-4 (4.0 m) 0.00 0.26 86.98 12.77
50
SPT-5 (5.0 m) 0.30 79.48 20.22 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
UDS-1 (1.50 m) UDS-2 (2.5 m) UDS-3 (3.50 m) SPT-4 (4.0 m) SPT-5 (5.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60 SPT-30 (30.50
3.14 82.36 14.50 0.00
m)
50
NIL 0.00 0.00 100.00 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
SPT-6 (6.0 m) SPT-10 (10.0 m) SPT-20 (20.0 m) SPT-30 (30.50 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-15 (15.0 m) 0.00 89.86 10.14 0.00
50
SPT-30 (30.5 m) 3.08 85.62 11.30 0.00
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
UDS-1 (1.50 m) SPT-3 (3.0 m) SPT-4 (4.0 m) SPT-15 (15.0 m) SPT-30 (30.5 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley Grain Size Analysis (ASTM D422)
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
60
SPT-23 (23.0 m) 0.00 94.20 5.80 0.00
50
SPT-24 (24.0 m) 26.19 38.56 30.04 5.22
40
SPT-7 (9.0 m) 0.00 0.00 100.00
30
20
10
0
1000 100 10 1 0.1 0.01 0.001
Average Grain Diameter (mm)
UDS-1 (1.50 m) SPT-3 (3.0 m) SPT-4 (4.0 m) SPT-23 (23.0 m) SPT-24 (24.0 m)
Tested by: Checked by:
Sikandar Hayat Muhammad Ajmal
Sand
Boulders Cobbles Gravel Silt Clay
Coarse Medium Fine
Berkeley
Associates (Pvt.) Ltd.
Consulting Engineers
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-1 Sample No.: SPT-1 Date: '12-05-2023
Depth: (meter) 1.00 Lab Ref: J-827
37
36
35 No. of Moisture
Moisture Content (%)
Blows Content
34
33 (%)
32 18 32.88
31 24 31.76
30 31 30.79
29
28 Liquid Limit (%) 31.6
27 Plastic Limit (%) 20.1
10 15 20 25 30 40 50 100
Plasticity Index ( 11.5
No. of Blows
29
28
No. of Moisture
27
Moisture Content (%)
Blows Content
26 (%)
25 15 25.64
24 21 24.61
23
30 23.57
22
21
20 Liquid Limit (%) 24.1
19
10 15 20 25 30 40 50 100
Plastic Limit (%) 19.9
No. of Blows
Plasticity Index ( 4.2
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-1 Sample No.: SPT-2 Date: '12-05-2023
Depth: (meter) 2.00 Lab Ref: J-827
29
28
27 No. of Moisture
Moisture Content (%)
Blows Content
26
25 (%)
24 17 25.25
23 22 24.48
22 30 23.57
21
20 Liquid Limit (%) 24.1
19 Plastic Limit (%) 20.9
10 15 20 25 30 40 50 100
Plasticity Index ( 3.2
No. of Blows
38
37
No. of Moisture
36
Moisture Content (%)
Blows Content
35 (%)
34 16 34.41
33 23 32.93
32
30 31.89
31
30
29 Liquid Limit (%) 32.6
28
10 15 20 25 30 40 50 100
Plastic Limit (%) 21.3
No. of Blows
Plasticity Index ( 11.3
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-2 Sample No.: SPT-1 Date: '13-05-2023
Depth: (meter) 1.00 Lab Ref: J-827
35
34
33 No. of Moisture
Moisture Content (%)
Blows Content
32
31 (%)
30 15 32.23
29 21 30.95
28 30 29.64
27
26 Liquid Limit (%) 30.3
25 Plastic Limit (%) 20.4
10 15 20 25 30 40 50 100
Plasticity Index ( 9.9
No. of Blows
36
35
No. of Moisture
34
Moisture Content (%)
Blows Content
33 (%)
32 18 32.26
31 24 31.15
30
31 30.20
29
28
27 Liquid Limit (%) 31.0
26
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.8
No. of Blows
Plasticity Index ( 10.2
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-2 Sample No.: UDS-1 Date: '13-05-2023
Depth: (meter) 2.50 Lab Ref: J-827
37
36
35 No. of Moisture
Moisture Content (%)
Blows Content
34
33 (%)
32 19 33.39
31 25 32.30
30 32 31.35
29
28 Liquid Limit (%) 32.3
27 Plastic Limit (%) 21.2
10 15 20 25 30 40 50 100
Plasticity Index ( 11.1
No. of Blows
36
35
No. of Moisture
34
Moisture Content (%)
Blows Content
33 (%)
32 15 32.76
31 22 31.28
30
29 30.25
29
28
27 Liquid Limit (%) 30.8
26
10 15 20 25 30 40 50 100
Plastic Limit (%) 21.0
No. of Blows
Plasticity Index ( 9.8
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-2 Sample No.: SPT-4 Date: '13-05-2023
Depth: (meter) 4.00 Lab Ref: J-827
31
30
29 No. of Moisture
Moisture Content (%)
Blows Content
28
27 (%)
26 17 27.35
25 23 26.36
24 30 25.53
23
22 Liquid Limit (%) 26.1
21 Plastic Limit (%) 19.2
10 15 20 25 30 40 50 100
Plasticity Index ( 6.9
No. of Blows
28
27
No. of Moisture
26
Moisture Content (%)
Blows Content
25 (%)
24 16 24.28
23 21 23.49
22
30 22.50
21
20
19 Liquid Limit (%) 23.0
18
10 15 20 25 30 40 50 100
Plastic Limit (%) 21.0
No. of Blows
Plasticity Index ( 2.0
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-2 Sample No.: SPT-15 Date: '13-05-2023
Depth: (meter) 15.00 Lab Ref: J-827
38
37
36 No. of Moisture
Moisture Content (%)
Blows Content
35
34 (%)
33 19 33.70
32 25 32.60
31 32 31.64
30
29 Liquid Limit (%) 32.6
28 Plastic Limit (%) 21.3
10 15 20 25 30 40 50 100
Plasticity Index ( 11.3
No. of Blows
37
36
No. of Moisture
35
Moisture Content (%)
Blows Content
34 (%)
33 18 33.40
32 24 32.26
31
31 31.28
30
29
28 Liquid Limit (%) 32.1
27
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.9
No. of Blows
Plasticity Index ( 11.2
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-3 Sample No.: SPT-2 Date: '13-05-2023
Depth: (meter) 2.00 Lab Ref: J-827
34
33
32 No. of Moisture
Moisture Content (%)
Blows Content
31
30 (%)
29 15 30.74
28 22 29.35
27 30 28.27
26
25 Liquid Limit (%) 28.9
24 Plastic Limit (%) 20.1
10 15 20 25 30 40 50 100
Plasticity Index ( 8.8
No. of Blows
34
33
No. of Moisture
32
Moisture Content (%)
Blows Content
31 (%)
30 19 30.08
29 25 29.10
28
33 28.14
27
26
25 Liquid Limit (%) 29.1
24
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.3
No. of Blows
Plasticity Index ( 8.8
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-3 Sample No.: SPT-4 Date: '13-05-2023
Depth: (meter) 4.00 Lab Ref: J-827
30
29
28 No. of Moisture
Moisture Content (%)
Blows Content
27
26 (%)
25 17 26.30
24 23 25.35
23 30 24.55
22
21 Liquid Limit (%) 25.1
20 Plastic Limit (%) 20.0
10 15 20 25 30 40 50 100
Plasticity Index ( 5.1
No. of Blows
31
30
No. of Moisture
29
Moisture Content (%)
Blows Content
28 (%)
27 15 27.98
26 21 26.86
25
28 25.94
24
23
22 Liquid Limit (%) 26.3
21
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.5
No. of Blows
Plasticity Index ( 5.8
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City (KSK)
Borehole No. BH-3 Sam ple No.: UDS-1 Date: '13-05-2023
Depth: (m eter 1.50 Lab Ref: J-827
37
36
35 No. of Moisture
Moisture Content (%)
34 Blow s Content
33 (%)
32 19 32.98
31 25 31.90
30 33 30.85
29
28
Liquid Limit (%) 31.9
27
20 25 30 40 50
Plastic Limit (%) 20.3
10 15 100
Plasticity Index (%)11.6
No. of Blow s
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku
Borehole No. BH-4 Sample No.: UDS-1 Date: '10-05-2023
Depth: (meter) 1.50 Lab Ref: J-827
33
32
31 No. of Moisture
Moisture Content (%)
Blows Content
30
29 (%)
28 15 30.10
27 22 28.74
26 30 27.68
25
24 Liquid Limit (%) 28.3
23 Plastic Limit (%) 20.1
10 15 20 25 30 40 50 100
Plasticity Index ( 8.2
No. of Blows
37
36
No. of Moisture
35
Moisture Content (%)
Blows Content
34 (%)
33 17 33.11
32 24 31.76
31
31 30.79
30
29
28 Liquid Limit (%) 31.6
27
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.4
No. of Blows
Plasticity Index ( 11.2
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku
Borehole No. BH-4 Sample No.: SPT-3 Date: '10-05-2023
Depth: (meter) 3.00 Lab Ref: J-827
29
28
27 No. of Moisture
Moisture Content (%)
Blows Content
26
25 (%)
24 15 25.64
23 21 24.61
22 29 23.67
21
20 Liquid Limit (%) 24.1
19 Plastic Limit (%) 19.9
10 15 20 25 30 40 50 100
Plasticity Index ( 4.2
No. of Blows
29
28
No. of Moisture
27
Moisture Content (%)
Blows Content
26 (%)
25 18 25.18
24 24 24.32
23
31 23.58
22
21
20 Liquid Limit (%) 24.2
19
10 15 20 25 30 40 50 100
Plastic Limit (%) 19.9
No. of Blows
Plasticity Index ( 4.3
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku
Borehole No. BH-5 Sample No.: UDS-1 Date: '13-05-2023
Depth: (meter) 1.50 Lab Ref: J-827
34
33
32 No. of Moisture
Moisture Content (%)
Blows Content
31
30 (%)
29 17 30.28
28 23 29.19
27 30 28.27
26
25 Liquid Limit (%) 28.9
24 Plastic Limit (%) 20.0
10 15 20 25 30 40 50 100
Plasticity Index ( 8.9
No. of Blows
35
34
No. of Moisture
33
Moisture Content (%)
Blows Content
32 (%)
31 15 32.13
30 20 31.03
29
27 29.92
28
27
26 Liquid Limit (%) 30.2
25
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.1
No. of Blows
Plasticity Index ( 10.1
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku
Borehole No. BH-6 Sample No.: UDS-1 Date: '13-05-2023
Depth: (meter) 1.50 Lab Ref: J-827
38
37
36 No. of Moisture
Moisture Content (%)
Blows Content
35
34 (%)
33 19 34.42
32 25 33.30
31 32 32.32
30
29 Liquid Limit (%) 33.3
28 Plastic Limit (%) 21.2
10 15 20 25 30 40 50 100
Plasticity Index ( 12.1
No. of Blows
36
35
No. of Moisture
34
Moisture Content (%)
Blows Content
33 (%)
32 17 32.80
31 23 31.62
30
31 30.50
29
28
27 Liquid Limit (%) 31.3
26
10 15 20 25 30 40 50 100
Plastic Limit (%) 21.0
No. of Blows
Plasticity Index ( 10.3
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku
Borehole No. BH-6 Sample No.: UDS-2 Date: '13-05-2023
Depth: (meter) 2.50 Lab Ref: J-827
35
34
33 No. of Moisture
Moisture Content (%)
Blows Content
32
31 (%)
30 17 31.43
29 23 30.30
28 30 29.35
27
26 Liquid Limit (%) 30.0
25 Plastic Limit (%) 20.4
10 15 20 25 30 40 50 100
Plasticity Index ( 9.6
No. of Blows
36
35
No. of Moisture
34
Moisture Content (%)
Blows Content
33 (%)
32 15 33.08
31 21 31.76
30
28 30.68
29
28
27 Liquid Limit (%) 31.1
26
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.9
No. of Blows
Plasticity Index ( 10.2
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KS
Borehole No. BH-6 Sam ple No.: SPT-4 Date: '13-05-2023
Depth: (m eter 4.00 Lab Ref: J-827
30
29
28 No. of Moisture
Moisture Content (%)
27 Blow s Content
26 (%)
25 19 25.84
24 25 25.00
23 31 24.36
22
21
Liquid Limit (%) 25.0
20
Plastic Limit (%) 19.9
10 15 20 25 30 40 50 100
Plasticity Index (%)5.1
No. of Blow s
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KS
Borehole No. BH-5 Sam ple No.: UDS-2 Date: '13-05-2023
Depth: (m eter 36.50 Lab Ref: J-827
35
34
33 No. of Moisture
Moisture Content (%)
32 Blow s Content
31 (%)
30 17 31.75
29 23 30.61
28 30 29.64
27
26
Liquid Limit (%) 30.3
25
Plastic Limit (%) 21.7
10 15 20 25 30 40 50 100
Plasticity Index (%)8.6
No. of Blow s
Project: Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
34
33
32 No. of Moisture
Moisture Content (%)
Blows Content
31
30 (%)
29 18 29.86
28 23 28.99
27 30 28.07
26
25 Liquid Limit (%) 28.7
24 Plastic Limit (%) 20.0
10 15 20 25 30 40 50 100
Plasticity Index ( 8.7
No. of Blows
34
33
No. of Moisture
32
Moisture Content (%)
Blows Content
31 (%)
30 15 30.85
29 21 29.62
28
30 28.37
27
26
25 Liquid Limit (%) 29.0
24
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.1
No. of Blows
Plasticity Index ( 8.9
Project: Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
34
33
32 No. of Moisture
Moisture Content (%)
Blows Content
31
30 (%)
29 15 30.53
28 23 28.99
27 30 28.07
26
25 Liquid Limit (%) 28.7
24 Plastic Limit (%) 20.3
10 15 20 25 30 40 50 100
Plasticity Index ( 8.4
No. of Blows
28
27
No. of Moisture
26
Moisture Content (%)
Blows Content
25 (%)
24 16 24.59
23 23 23.54
22
30 22.79
21
20
19 Liquid Limit (%) 23.3
18
10 15 20 25 30 40 50 100
Plastic Limit (%) 19.9
No. of Blows
Plasticity Index ( 3.4
Project: Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
33
32
31 No. of Moisture
Moisture Content (%)
Blows Content
30
29 (%)
28 19 28.74
27 25 27.80
26 32 26.98
25
24 Liquid Limit (%) 27.8
23 Plastic Limit (%) 20.2
10 15 20 25 30 40 50 100
Plasticity Index ( 7.6
No. of Blows
34
33
No. of Moisture
32
Moisture Content (%)
Blows Content
31 (%)
30 17 30.70
29 24 29.45
28
31 28.55
27
26
25 Liquid Limit (%) 29.3
24
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.4
No. of Blows
Plasticity Index ( 8.9
Project: Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
33
32
31 No. of Moisture
Moisture Content (%)
Blows Content
30
29 (%)
28 18 29.45
27 23 28.59
26 30 27.68
25
24 Liquid Limit (%) 28.3
23 Plastic Limit (%) 19.7
10 15 20 25 30 40 50 100
Plasticity Index ( 8.6
No. of Blows
31
30
No. of Moisture
29
Moisture Content (%)
Blows Content
28 (%)
27 15 27.98
26 22 26.71
25
30 25.73
24
23
22 Liquid Limit (%) 26.3
21
10 15 20 25 30 40 50 100
Plastic Limit (%) 20.4
No. of Blows
Plasticity Index ( 5.9
Proj ect: Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
28
27
26 No. of Moisture
Moisture Content (%)
Blows Content
25
24 (%)
23 15 24.36
22 20 23.53
21 27 22.69
20
19 Liquid Limit (%) 22.9
18 Plastic Limit (%) 19.7
10 15 20 25 30 40 50 100
Plasticity Index (%) 3.2
No. of Blow s
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-1 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 18.64 kN/m
Weight 1024.0 g NMC 17.32 %
3
Volume 539.00 cm3 Dry Density 15.89 kN/m
200
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
175
0.00 0 0.00 38.50 0.00
1.00 6 0.71 38.78 15.17
2.00 14.2 1.43 39.06 35.65
3.00 23.96 2.14 39.34 59.72 150
4.00 34 2.86 39.63 84.13
5.00 41.8 3.57 39.93 102.67
6.00 49.6 4.29 40.22 120.93 125
7.00 56 5.00 40.53 135.51
Stress (kPa)
50
25
0
0 1 2 3 4 5 6 7 8 9
Strain (%)
Strain = 7.9 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-2 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 2.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.74 kN/m
Weight 1084.8 g NMC 17.19 %
3
Volume 539.00 cm3 Dry Density 16.85 kN/m
400
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
350
0.00 0 0.00 38.50 0.00
1.00 14 0.71 38.78 35.41
2.00 32.2 1.43 39.06 80.85
3.00 50.96 2.14 39.34 127.02 300
4.00 70 2.86 39.63 173.21
5.00 86.8 3.57 39.93 213.20
6.00 103.6 4.29 40.22 252.58 250
7.00 117.6 5.00 40.53 284.57
Stress (kPa)
100
50
0
0 1 2 3 4 5 6 7 8 9 10
Strain (%)
Strain = 7.9 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-3 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.33 kN/m
Weight 1061.9 g NMC 17.79 %
3
Volume 539.00 cm3 Dry Density 16.41 kN/m
160
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
140
0.00 0 0.00 38.50 0.00
1.00 5 0.71 38.78 12.64
2.00 10.3 1.43 39.06 25.86
3.00 15 2.14 39.34 37.39 120
4.00 21 2.86 39.63 51.96
5.00 26 3.57 39.93 63.86
6.00 31 4.29 40.22 75.58 100
7.00 36 5.00 40.53 87.11
Stress (kPa)
20
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)
Strain = 10.0 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '10-05-2023
Borehole No.: BH-4 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 18.51 kN/m
Weight 1017.0 g NMC 17.00 %
3
Volume 539.00 cm3 Dry Density 15.82 kN/m
250
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
0.00 0 0.00 38.50 0.00
1.00 6.12 0.71 38.78 15.48
200
2.00 14 1.43 39.06 35.15
3.00 23.25 2.14 39.34 57.95
4.00 31.35 2.86 39.63 77.57
5.00 39.9 3.57 39.93 98.00
6.00 48.45 4.29 40.22 118.12
7.00 57 5.00 40.53 137.93 150
Stress (kPa)
50
0
0 1 2 3 4 5 6 7 8 9 10
Strain (%)
Strain = 7.9 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '10-05-2023
Borehole No.: BH-4 Sample No.: UDS-2 Lab Ref: J-827
Depth: (meter) 2.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 18.95 kN/m
Weight 1041.0 g NMC 18.57 %
3
Volume 539.00 cm3 Dry Density 15.98 kN/m
200
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
0.00 0 0.00 38.50 0.00
1.00 8.14 0.71 38.78 20.59
160
2.00 18.11 1.43 39.06 45.47
3.00 28.35 2.14 39.34 70.66
4.00 38.75 2.86 39.63 95.88
5.00 49.15 3.57 39.93 120.72
6.00 58.55 4.29 40.22 142.75
7.00 65 5.00 40.53 157.29 120
Stress (kPa)
80
40
0
0 1 2 3 4 5 6 7 8
Strain (%)
Strain = 6.4 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-5 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.10 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 18.80 kN/m
Weight 1040.5 g NMC 18.42 %
3
Volume 542.85 cm3 Dry Density 15.88 kN/m
160
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
140
0.00 0 0.00 38.50 0.00
1.00 4.5 0.71 38.78 11.38
2.00 8.5 1.42 39.05 21.34
3.00 13.5 2.13 39.34 33.66 120
4.00 18.2 2.84 39.62 45.04
5.00 23 3.55 39.92 56.51
6.00 27.5 4.26 40.21 67.07 100
7.00 32.1 4.96 40.51 77.70
Stress (kPa)
20
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Strain (%)
Strain = 10.6 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-5 Sample No.: UDS-2 Lab Ref: J-827
Depth: (meter) 36.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 18.69 kN/m
Weight 1027.0 g NMC 21.06 %
3
Volume 539.00 cm3 Dry Density 15.44 kN/m
280
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
0.00 0 0.00 38.50 0.00 240
1.00 7 0.71 38.78 17.70
2.00 13 1.43 39.06 32.64
3.00 20 2.14 39.34 49.85
4.00 26 2.86 39.63 64.33 200
5.00 33.4 3.57 39.93 82.04
6.00 41 4.29 40.22 99.96
7.00 47.5 5.00 40.53 114.94
160
Stress (kPa)
40
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Strain (%)
Strain = 11.4 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-6 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.98 kN/m
Weight 1098.0 g NMC 14.68 %
3
Volume 539.00 cm3 Dry Density 17.43 kN/m
200
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa) 180
0.00 0 0.00 38.50 0.00
1.00 11.3 0.71 38.78 28.58
160
2.00 26.3 1.43 39.06 66.03
3.00 42.3 2.14 39.34 105.44
4.00 57.6 2.86 39.63 142.53 140
5.00 70 3.57 39.93 171.93
6.00 60 4.29 40.22 146.28
120
Stress (kPa)
100
80
60
40
20
0
0 1 2 3 4 5
Strain (%)
Strain = 3.6 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '13-05-2023
Borehole No.: BH-6 Sample No.: UDS-2 Lab Ref: J-827
Depth: (meter) 2.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.89 kN/m
Weight 1093.0 g NMC 17.08 %
3
Volume 539.00 cm3 Dry Density 16.99 kN/m
180
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa) 160
0.00 0 0.00 38.50 0.00
1.00 4.3 0.71 38.78 10.87
2.00 9.3 1.43 39.06 23.35 140
3.00 15 2.14 39.34 37.39
4.00 21 2.86 39.63 51.96
5.00 27 3.57 39.93 66.32 120
6.00 32.9 4.29 40.22 80.21
7.00 38.5 5.00 40.53 93.16
Stress (kPa)
40
20
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Strain (%)
Strain = 10.0 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '05-05-2023
Borehole No.: BH-7 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.29 kN/m
Weight 1059.7 g NMC 15.24 %
3
Volume 539.00 cm3 Dry Density 16.74 kN/m
70
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
0.00 0 0.00 38.50 0.00 60
1.00 3 0.71 38.78 7.59
2.00 6.1 1.43 39.06 15.32
3.00 9.3 2.14 39.34 23.18
4.00 12.6 2.86 39.63 31.18 50
5.00 15.6 3.57 39.93 38.32
6.00 19 4.29 40.22 46.32
7.00 22 5.00 40.53 53.24
40
Stress (kPa)
20
10
0
0 1 2 3 4 5 6 7 8 9
Strain (%)
Strain = 7.1 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '05-05-2023
Borehole No.: BH-7 Sample No.: UDS-2 Lab Ref: J-827
Depth: (meter) 2.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.12 kN/m
Weight 1050.5 g NMC 18.50 %
3
Volume 539.00 cm3 Dry Density 16.13 kN/m
250
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
0.00 0 0.00 38.50 0.00
1.00 9.9 0.71 38.78 25.04
200
2.00 20.3 1.43 39.06 50.97
3.00 31.1 2.14 39.34 77.52
4.00 41.5 2.86 39.63 102.69
5.00 53.1 3.57 39.93 130.42
6.00 65.8 4.29 40.22 160.42
7.00 76.9 5.00 40.53 186.08 150
Stress (kPa)
100
50
0
0 1 2 3 4 5 6 7 8
Strain (%)
Strain = 6.4 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '05-05-2023
Borehole No.: BH-7 Sample No.: UDS-3 Lab Ref: J-827
Depth: (meter) 3.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.09 kN/m
Weight 1049.0 g NMC 18.93 %
3
Volume 539.00 cm3 Dry Density 16.05 kN/m
140
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
0.00 0 0.00 38.50 0.00 120
1.00 4 0.71 38.78 10.12
2.00 9.8 1.43 39.06 24.61
3.00 15 2.14 39.34 37.39
4.00 20 2.86 39.63 49.49 100
5.00 25 3.57 39.93 61.40
6.00 30.4 4.29 40.22 74.12
7.00 35.8 5.00 40.53 86.63
80
Stress (kPa)
40
20
0
0 1 2 3 4 5 6 7 8 9
Strain (%)
Strain = 7.1 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '05-05-2023
Borehole No.: BH-8 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 18.23 kN/m
Weight 1001.9 g NMC 17.17 %
3
Volume 539.00 cm3 Dry Density 15.56 kN/m
45
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa) 40
0.00 0 0.00 38.50 0.00
1.00 4.2 0.71 38.78 10.62
2.00 7.6 1.43 39.06 19.08 35
3.00 11.1 2.14 39.34 27.67
4.00 14.1 2.86 39.63 34.89
5.00 15.8 3.57 39.93 38.81 30
6.00 16.1 4.29 40.22 39.25
7.00 14.2 5.00 40.53 34.36
Stress (kPa)
25
20
15
10
0
0 1 2 3 4 5 6
Strain (%)
Strain = 4.3 %
Project: Construction of Smart 250 Bed Hospital at Lahore Smart City Kalashah Kaku (KSK)
Date: '05-05-2023
Borehole No.: BH-9 Sample No.: UDS-1 Lab Ref: J-827
Depth: (meter) 1.50
2
Length 14.00 cm Area (avg.) 38.50 cm
3
Dia (avg.) 7 cm Bulk Density 19.75 kN/m
Weight 1085.0 g NMC 14.09 %
3
Volume 539.00 cm3 Dry Density 17.31 kN/m
80
Corrected
Deformaton Load Strain Area Stress
(mm) kg (%) (cm2) (kPa)
70
0.00 0 0.00 38.50 0.00
1.00 6.3 0.71 38.78 15.93
2.00 11.9 1.43 39.06 29.88
3.00 17.1 2.14 39.34 42.62 60
4.00 23.1 2.86 39.63 57.16
5.00 27.9 3.57 39.93 68.53
6.00 30.5 4.29 40.22 74.36 50
7.00 29.7 5.00 40.53 71.87
Stress (kPa)
40
30
20
10
0
0 1 2 3 4 5 6
Strain (%)
Strain = 4.3 %
200.0
180.0
160.0
Shear Stress (kPa)
140.0
120.0
100.0
80.0
60.0
40.0
20.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Horizontal Displacement (mm)
y = 0.7579x + 0.2584
400
350
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400
Normal Stress (kPa)
LINEAR REGRESSION
180.0
160.0
140.0
Shear Stress (kPa)
120.0
100.0
80.0
60.0
40.0
20.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Horizontal Displacement (mm)
400
y = 0.651x + 1.4661
350
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400
Normal Stress (kPa)
LINEAR REGRESSION
200.0
180.0
160.0
Shear Stress (kPa)
140.0
120.0
100.0
80.0
60.0
40.0
20.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Horizontal Displacement (mm)
400
y = 0.7079x + 2.1263
350
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400
Normal Stress (kPa)
LINEAR REGRESSION
160.0
140.0
120.0
Shear Stress (kPa)
100.0
80.0
60.0
40.0
20.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Horizontal Displacement (mm)
400
y = 0.6504x + 0.2428
350
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400
Normal Stress (kPa)
LINEAR REGRESSION
300.0
250.0
Shear Stress (kPa)
200.0
150.0
100.0
50.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
Horizontal Displacement (mm)
y = 0.7426x + 1.51
450
400
350
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400 450
Normal Stress (kPa)
LINEAR REGRESSION
160.0
140.0
120.0
Shear Stress (kPa)
100.0
80.0
60.0
40.0
20.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Horizontal Displacement (mm)
400
y=
350 0.6045x + 2.6385
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400
Normal Stress (kPa)
LINEAR REGRESSION
300.0
250.0
Shear Stress (kPa)
200.0
150.0
100.0
50.0
0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
Horizontal Displacement (mm)
y = 0.7524x + 0.0662
450
400
350
300
Shear Stress (kPa)
250
200
150
100
50
0
0 50 100 150 200 250 300 350 400 450
Normal Stress (kPa)
LINEAR REGRESSION
(PHOTOGRAPHS)