Screen Calculations
Flow Capacity Guidelines *The charts below should be used for approximations only*
)
approximations only*
Quick Volume Conversions
Gallons Quarts Cubic Feet Cubic Yards Barrells
0.00 0.00 0.000 0.00
0 0.00 0.000 0.00
0.00 0.00 0.000 0.00
0.00 0.00 0 0.00
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000 0.00
0.00 0.00 0.00 0.000 0.00
Field Calculations
= Piping ID (inches)
= Velocity (feet/sec)
= Velocity (meters/sec)
= Head (feet)
= Head (meters)
Head equivalent of pressure (feet)
using specific gravity
Pressure and specific gravity are known 6000 = Pressure (psi)
KVA Calculation
The KVA required to supply power to = Voltage (V)
equipment from a portable 3 phase
generator can be calculated if the = Combined amp draw of equipment (A)
voltage and the combined amp drawn of
all components are known. 0.00 = Kilovolt amperes for 3 phase power (KVA)
Hole Volume
bbl, cubic feet or cubic yards = Hole diameter (inches)
1.6
Barrells Liters Cubic Meters
0.00 0.00 0.000
0.00 0.00 0.000
0.00 0.00 0.000
0.00 0.00 0.000
0.00 0.000
0.00 0.000
0.00 0.00
ferential (rpm)
on in (G's)
es)
icrons)
centipoise)
sec)
t (inches)
G's)
t)
e (psi)
e (psi)
w of equipment (A)
bl)
mal equivalent)
bl)
ubic meters)
es)
et)
feet)
yards)
es)
eters)
meters)
month (inches)
onth)
meters/month)
SG M3/hr gpm
1.1 110 484
1.2 121 533
1.3 132 581
1.4 143 630
1.5 155 682
1.6 165 726
1.7 177 779
1.8 190 837
1.9 200 881
2.0 212 933
223 982
235 1035
Baroid Surface Solutions™
ESTIMATED WASTE VOLUMES PER INTERVAL
Interval 1 2 3 4 5
Hole Size, in
Section Length, ft
Rock Density, ppg
Mud Type WBM
Washout/Swelling Factor OBM
Mud on Cuttings (% by Volume) SBM
Mud Density, ppg
Max. ROP for Section, ft/hr
Dilution Factor (for Slurrification/Injection)
Skip Capacity, ton
Section Drilling Days
CUTTINGS GENERATION
Interval 1 2 3 4 5 Totals
Drilled Rock, bbl 0.00 0.00 0.00 0.00 0.00 0.00
Drilled Rock, ton 0.00 0.00 0.00 0.00 0.00 0.00
Max Rock Generation Rate, bbl/hr 0.00 0.00 0.00 0.00 0.00
Max Rock Generation Rate, tonnes/hr 0.00 0.00 0.00 0.00 0.00
MaxMud Lost on Cuttings Rate, bbl/hr 0.00 0.00 0.00 0.00 0.00
Max Mud Lost on Cuttings Rate, ton/hr 0.00 0.00 0.00 0.00 0.00
Max Mud & Cuttings Rate, bbl/hr 0.00 0.00 0.00 0.00 0.00
Max Mud & Cuttings Rate, ton/hr 0.00 0.00 0.00 0.00 0.00
Total Lost Mud, bbl 0.00 0.00 0.00 0.00 0.00 0.00
Total Lost Mud, ton 0.00 0.00 0.00 0.00 0.00 0.00
Total Wet Cuttings, bbl 0.00 0.00 0.00 0.00 0.00 0.00
Total Wet Cuttings, ton 0.00 0.00 0.00 0.00 0.00 0.00
Interval 1 2 3 4 5 Totals
Slurry Volume, bbl 0.00 0.00 0.00 0.00 0.00 0.00
Max Slurry Rate, bbl/hr 0.00 0.00 0.00 0.00 0.00
Max Slurry Rate, bbl/min 0.00 0.00 0.00 0.00 0.00
Interval 1 2 3 4 5 Totals
Required Skips 0
Skips per day
Slip Cycle, min
Full Circle Cuttings Injection Calculations
= Pressure (psi)
e (bbls/min)
ntration (% by volume)
s)
ntration (% by volume)
sec)
wear (mm)
radient (ppg)
Screens
Weight of the sample kg
Time taking the cuttings sample sec
Volume of the sample litres
Cone underflow Time sec/l 0
Density of the wet sample SG
Time of feed sample sec
Time Overflow sec
Screen underflow density SG
Density cone overflow SG
Cone header pressure psi
Density of feed (inflow) SG
Density of Discharge (outflow) SG
Flow Rate lpm
Motor(Shaker)/Bowl(Centrif) speed rpm
Stroke Length/Bowl ID in
Hours of operation hr
Weight of Empty retort ass. gr
Weight of cell+wet cuttings gr
Weight of dry cell + dry cutting gr
Volume of base fluid in retort mls
Volume of water in retort mls
Weight of base oil in retort gr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
% Solids by weight %
Wet solids discharged kg/hr 0 0 0
Dry solids discharged kg/hr
Liquid discharged l/hr
Average specific gravity of solids SG
% Barite in dry solids % 0 0 0 0 0 0 0 0 0
Barite discharged kg/hr 0 0 0 0 0 0 0 0 0
Drill Solids discharged kg/hr
G Force G's 0 0 0 0 0 0 0 0
Individual Efficiency* %
Oil on Dry Cuttings (by weight) %
Add to SC Efficiency (Y or N) Y or N