Substation For Wko Facilities: General Notes
Substation For Wko Facilities: General Notes
A ANALYSIS ALARM
HS J POWER SCAN
COOLING ON/OFF
AIRCOOLED TIME OR TIME RATE OR CONTROL
CONDENSING UNIT K TIME SCHEDULE CHANGE STATION
RUNNING (NOTE-1) LIGHT
L LEVEL LOW, CLOSED
(PILOT)
AIRCOOLED
CONDENSING UNIT M MOISTURE MONITORING
AIR COOLED FAULT
N CORROSION USER'S USER'S USER'S
CONDENSING UNIT CHOICE CHOICE CHOICE
ORIFICE
O USER'S CHOICE
LCP CU LOCAL CONTROL PANEL RESTRICTION
PRESSURE OR POINT (TEST)
P VACUUM
(APPLICABLE FOR CONNECTION
OTHER AIR CO0LLED QUANTITY OR INTEGRATE OR INTEGRATE
CONDENSING UNIT ALSO)
Q EVENT TOTALIZE OR TOTALIZED
R RADIATION RECORD OR
TT TS (NOTE-3) PRINT
S SPEED OR
SAFETY SYSTEM SWITCH SELECTOR LEGEND
ROOM FREQUENCY
T TEMPERATURE TRANSMIT
RETURN AIR
PDA PDA
FAN TRIPPED (NOTE-2) I
PDS FAN RUN (NOTE-2)
PDS PDS
GDT GDF
MD
FS
(NOTE-2)
F.A. LOUVER REMOTE HVAC LFAGP
PDG PDG CONTROL PANEL(RCP)
H2S DETECTOR
COMBUSTIBLE
GAS DETECTOR HS JA
MOTORIZED DAMPER
POWER LAMP POWER
FRESH AIR FILTER ON TEST SUPPLY
FAULT
LITO MAY2016