Manuscript Seagull

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

SLID

E NR
1 AMENITIES
GOOD__________________
I AM ___________________________ AND I WILL BE PRESENTING TO YOU THE
EXERISE DIRECTOR’S PLAN FOR MARITIME TRAINING ACTIVITY CODENAMED
SEAGULL 08/18
2 THE SCOPE OF MY PRESENTATION IS AS SHOWN
3 REFERENCES
4 AS SHOWN ARE THE REFERENCES FOR THIS YEARS MARITIME TRAINING
ACTIVITY SEAGULL 08/18.
5 OVERVIEW
6 AS AN OVERVIEW, THIS YEAR’S MTA SEAGULL IS THE EIGHT IN THE SERIES OF
BI-LATERAL ENGAGEMENT BETWEEN THE PHILIPPINE NAVY AND THE ROYAL
BRUNEI NAVY WHICH IS HELD EVERY TWO YEARS.
THE BILATERAL ACTIVITY WILL FOCUS ON THE CONDUCT OF NAVAL
OPERATIONS BY COMBINED NAVAL TASK GROUP

THE EXERCISE AIMS TO STRENGTHEN THE RELATIONSHIP AND ENHANCE


MUTUAL COOPERATION BETWEEN THE PHILIPPINES AND BRUNEI.
7 SITUATION
8 MTA SEAGULL 2018 WILL BE CONDUCTED AT NAVAL FORCES CENTRAL AREA
OF RESPONSIBILITY FROM 23 – 29 SEPTEMBER 2018 WITH THE FOIC, PN AS
OFFICER SCHEDULING EXERCISE AND THE COMMANDER NAVAL FORCES
CENTRAL AS THE DESIGNATED OCE. THE DEPUTY COMMANDER WILL BE THE
EXERCISE DIRECTOR.
THE TRAINING ACTIVITIES COVER SUBJECT MATTER EXPERT EXCHANGES
FROM THE PARTICIPATING UNITS DURING THE HARBOR PHASE. WHILE THE AT
SEA PHASE WILL BE PARTICIPATED IN BY PN AND RBN VESSEL.
THE HARBOR PHASE EXERCISES WILL BE CONDUCTED ABOARDSHIP AND AT
NAVAL BASE RAFAEL RAMOS WHILE THE AT SEA PHASE WILL BE AT VICINITY
OFF CAMOTES AND VISAYAN SEA.
9 MISSION
10 THE MISSION OF THIS EXERCISE IS TO CONDUCT A COMBINED MARITIME
TRAINING ACTIVITY CODENAMED SEAGULL 08/18 THROUGH FIELD TRAINING
EXERCISES AT NFC AOR FROM 23 – 29 SEPTEMBER 2018 IN ORDER TO
ENHANCE INTEROPERABILITY, MUTUAL UNDERSTANDING AND COOPERATION
BETWEEN THE PN AND THE RBN
11 COMBINED OBJECTIVES
12 SHOWN ARE THE COMBINED OBJECTIVES OF THE EXERCISE.
1. TO STRENGTHEN BILATERAL RELATIONSHIPS BETWEEN PN AND RBN;
2. TO IMPROVE COMBINED EXERCISE/ OPERATIONAL PLANNING COMPETENCY;
3. TO IMPROVE COMBAT READINESS OF PARTICIPATING UNITS;
4. TO ENHANCE INTEROPERABILITY BETWEEN PN AND RBN IN COMBINED
NAVAL OPERATIONS;
5. TO PROVIDE PARTICIPATING PERSONNEL THE EXPERIENCE OF WORKING
TOGETHER AND DEVELOP CAMARADERIE; AND,
6. TO EVALUATE RESPECTIVE DOCTRINES, TECHNIQUES, TACTICS, AND
PROCEDURES (TTPS).
13 CONOPS
14 THE EXERCISE WILL BE CONDUCTED IN THREE PHASES.

THE FIRST PHASE IS THE PREPARATION PHASE WHICH BEGUN LAST 23


JANUARY 2018 DURING THE EXERCISE PLANNING CONFERENCE. CONDUCT OF
COORDINATING CONFERENCES AND THE ACTIVATION OF THE EXERCISE
HEADQUARTERS IS INCLUDED IN THIS PHASE
15 THE SECOND PHASE IS THE FIELD TRAINING EXERCISE WHICH IS FURTHER
SUBDIVIDED IN TWO (2) PARTS.

THE 1ST PART OF THE FTX IS HARBOR PHASE WHICH INCLUDES THE COUTESY
CALL OF THE PHILIPPINE NAVY AND ROYAL BRUNEI NAVY SHIPS COMMANDING
OFFICERS TO COMMANDER NAVAL FORCES CENTRAL AND TO COMMANDER
CENTRAL COMMAND. THE OPENING CEREMONY WILL BE ON 24 SEPTEMBER
2018 AND SHIPS TOUR WILL BE CONDUCTED AT KDB DARULAMAN (DLM 08) AND
BRP GREGORIO DEL PILAR (FF15). A PN HOSTED COCKTAIL RECEPTION WILL
ALSO BE CONDUCTED DURING THIS PHASE ABOARD FF15 FLIGHT DECK. PRE-
SAIL BRIEFING, FTX OPERATIONS CONFERENCE AND OTHER RELATED
PREPARATIONS WILL TAKE PLACE PRIOR THE AT SEA PHASE ACTIVITIES.
THE 2ND PART IS THE AT SEA PHASE WHEREIN EXECUTION OF THE DIFFERENT
AT SEA SERIALS WILL BE CONDUCTED. DURING BORDEX, BOARDING TEAMS
FROM THE TWO (2) VESSELS WILL BOARD BRP IVATAN (LC298) WHICH WILL
PLAY THE ROLE OF CONTACT OF INTEREST. COS FIRESIDE WILL BE
UNDERTAKEN ON EACH VESSEL TO GIVE TIME FOR THE COS TO DISCUSS THE
ACTIVITIES FOR THE DAY AND UPCOMING ACTIVITIES. DECK LANDING
PROFICIENCY WILL BE CONDUCTED ABOARD KDB DARULAMAN (DLM08).
16 THE LAST PHASE IS THE POST EXERCISE PHASE. DURING THIS PHASE,
HOTWASH, CLOSING CEREMONY AND REPORT WRITING WILL TAKE PLACE.
THE EXERCISE DIRECTORATE HEADQUARTERS WILL ALSO BE DEACTIVATED.
17 SHOWN IS THE AREA WHERE THE MARITIME TRAINING ACTIVITY WILL BE HELD.
MOST OF THE SERIALS WILL TAKE PLACE IN THE VICINITY OFF CAMOTES SEA
AND THE VISAYAN SEA.
18 GUNNEX AREA IS LOCATED AT 3.5 NAUTICAL MILES SOUTH OFF TUDLAN POINT,
CAMOTES ISLAND, CEBU WHICH IS BOUNDED BY THE COORDINATES AS
SHOWN.
19 FORCE COMMITMENT
20 FOR THIS MARITIME TRAINING ACTIVITY, PHILIPPINE NAVY WILL COMMIT ONE
DEL PILAR CLASS FRIGATE, ONE NAVAL HELICOPTER, ONE LANDING CRAFT AS
COI AND ONE PATROL CRAFT AS ADMIN VESSEL. ONE NAVAL HELICOPTER,
AND THE NAVAL SPECIAL OPERATIONS UNIT 5 WITH ONE SNIPER TEAM OF
MARSOG ARE ALSO COMMITTED.
21 THE ROYAL BRUNEI NAVY, ON THE OTHER HAND, COMMITTED ONE
DARUSALAM CLASS OFFSHORE PATROL VESSEL AND ONE TEAM OF NAVAL
SURFACE ACTION GROUP.
22 TASK ORGANIZATION
23 AS SHOWN IS THE ORGANIZATION FOR THIS YEARS SEAGULL.
THE DIRECTOR FOR THE EXERCISE WILL BE YOURS TRULY.
THERE WILL BE TWO TASK GROUPS: NAVAL TASK GROUP 50.1 WILL BE THE
SURFACE GROUP THAT WILL CONTROL ALL SURFACE ACTIVITES AND
NAVAL TASK GROUP 50.2 WILL BE THE SUPPORT GROUP FOR THE SUPPORT
REQUIREMENTS OF THE PARTICIPATING UNITS.
24 LIKEWISE, THE ORGANIZATION OF EXERCISE DIRECTORATE HEADQUARTERS
IS AS SHOWN
25 THE SURFACE GROUP WILL BE ORGANIZED WITH CAPT JUNJIE B TABUADA PN
(MNSA) AS THE COMMANDER. UNDER HIS COMMAND ARE THE COMMANDING
OFFICERS OF BRP GREGORIO DEL PILAR AS CNTU 50.1.1 AND NAVAL SPECIAL
OPERATIONS UNIT 5 AS CNTU 50.1.2
26 THE SUPPORT GROUP, ON THE OTHER HAND, WILL BE HEADED BY CAPT
CARPIO PN(GSC). THE GROUP IS COMPOSED OF SERVICE SUPPORT FOR ALL
THE TRANSPORTATION AND OTHER REQUIREMENTS, THE FORCE PROTECTION
WHICH IS HEADED BY CO, NAVAL IINTELIGENCE SECURITY GROUP CENTRAL,
THE MEDICAL AND THE PUBLIC AFFAIRS.
27 SOE
28 AS SHOWN IS THE SCHEDULE OF EVENTS.
HARBOR PHASE WILL START WITH THE MEETING PROCEDURES DURING THE
ARRIVAL OF RBN SHIP AT CEBU INTERNATIONAL PIER, CEBU CITY ON 23
SEPTEMBER 2018. ADMIN AND SECURITY BRIEFING FOR THE CREW OF DLM08,
REVIEW OF SEQUENCE OF EVENTS AND COMMS PLANNING BOARD WILL BE
CONDUCTED AT THE FOLLOWING VENUE AS SHOWN.
29 SHOWN IS THE SCHEDULE OF EVENTS ON THE SECOND DAY OF THE HARBOR
PHASE.
COMMANDING OFFICERS OF BOTH SHIPS WILL BE ACCOMPANIED BY
SELECTED PERSONALITIES OF EXERCISE DIRECTOR’S HEADQUARTERS
DURING THE SCHEDULED COURTESY CALLS. IMMEDIATELY AFTER THE
COURTESY CALL, OPENING CEREMONY WITH COMMANDER CENTRAL
COMMAND AS GUEST OF HONOR AND SPEAKER WILL BE HELD AT IMH.
30 SHOWN ARE THE DIFFERENT EVENTS SCHEDULED AFTER THE OPENING
CEREMONY. THE SECOND DAY OF THE HARBOR PHASE WILL CULMINATE WITH
A PN COCKTAIL RECEPTION.
31 SHOWN ARE THE EVENTS FOR THE THIRD DAY OF MTA SEAGULL. SPECIAL
OPERATIONS ENGAGEMENT WILL BE HELD ABOARD LC928. SHIP’S TOUR, PRE-
SAIL BRIEF PRESENTATION AND SPORTS ACTIVITIES WILL ALSO BE
CONDUCTED ON THAT DAY.
32 THE SUCCEEDING SLIDES WILL SHOW THE SCHEDULED EVENTS FOR THE 4 TH
AND 5TH DAY.
33 CONTINUATION…
34 CONTINUATION…
35 SHOWN IS THE SCHEDULE OF EVENTS ON THE 6TH DAY OF MTA SEAGULL
WHICH ARE TO TAKE PLACE IN BACOLOD CITY.
36 AFTER THE FRIDAY PRAYERS OF DLM 08 CREW, CLOSING CEREMONY AND
PRESS CONFERENCE WILL BE HELD ABOARD DLM 08 FLIGHT DECK. IT WILL BE
FOLLOWED BY A RBN COCKTAIL RECEPTION.
AND ON 29 SEPTEMBER, RESPECTIVE SHIPS WILL SAIL ACCORDING TO THEIR
SCHEDULE.
37 POE
38 AS SHOWN IS THE PROGRAM OF EXPENDITURE.

THE ADMINISTRATIVE REQUIREMENTS DURING THE PREPARATION PHASE


WILL ENTAIL A TOTAL AMOUNT SEVENTY FIVE THOUSAND TWO HUNDRED
PESOS.
39 AS SHOWN IS THE PROGRAM OF EXPENDITURE.

THE ADMINISTRATIVE REQUIREMENTS DURING THE HARBOR PHASE WILL


ENTAIL A TOTAL AMOUNT OF ONE HUNDRED FIFTY TWO THOUSAND EIGHT
HUNDRED PESOS.
40 WHILE FTX AT-SEA PHASE WILL ENTAIL A TOTAL AMOUNT OF SEVEN
THOUSAND PESOS.
41 ADMINISTRATIVE REQUIREMENTS FOR THE POST EXERCISE PHASE WILL
ENTAIL A TOTAL AMOUNT OF THIRTY SIX THOUSAND FIVE HUNDRED PESOS.
42 FTX HARBOR PHASE WITH ONE HUNDRED THIRTY THOUSAND FOUR HUNDRED
PESOS.
43 AS A RECAP, THE ADMIN REQUIREMENTS FOR MTA SEAGULL 08/18 WILL
ENTAIL A TOTAL AMOUNT OF TWO HUNDRED NINETY SEVEN THOUSAND NINE
HUNDRED PESOS.
44 POL REQUIREMENTS FOR GROUND MOBILITY ARE AS SHOWN
45 LIKEWISE, POL REQUIREMENTS FOR FTX ARE AS SHOWN
46 AS SHOWN IS THE RECAPITULATION OF POL REQUIREMENTS.
47 FURTHERMORE, AS SHOWN IS THE AMMUNITION REQUIREMENTS DURING
THECONDUCT OF GUNNERY EXERCISE AMOUNTING TO ONE MILLION FIVE
HUNDRED SIXTY-NINE THOUSAND PESOS.
48 SHOWN IS THE TOTAL FUND REQUIREMENTS FOR THE MTA SEAGULL 08/18
49 IN THIS REGARD, REQUEST FOR THE APPROVAL OF EXERCISE DIRECTOR’S
PLAN FOR EXERCISE SEAGULL 2018.
50 THAT ENDS MY PRESENTATION. THANK YOU AND GOOD DAY