Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ANALOG COMMUNICATION;4th SEM

Deptt. OF ETC,JIST Expt 12.a PPM

Experiment 12.b
Aim :Study of PPM using Sine wave Input
Equipments :
Scientech 2110 with Power Supply cord
Scientech Oscilloscope with connecting probe
 Connecting cords
Connection Block Diagram:

Procedure:
 Connect the circuit as shown in next figure and also described below for clarity.

• Input of pulse position modulation blocks to sine wave output of FG block.


 Switch ‘On’ the Power Supply & Oscilloscope.
 Observe the output of PPM block TP (7) together with modulation signal input TP (6).
Use Alternate Triggering to make the output stable at the Oscilloscope screen. Also
decrease the amplitude of modulation signal generator gradually to fix the PPM pattern
at the screen.
[CH1(Y) – 2V; CH2(X) – 2V; Time base – 0.2mS]

You might also like