International Rescue Committee

Project Name:Emergency Response to Improve Access to WASH Services in Yemen (SDC)


Intervention: Rehabilitate School
Environmental Health (WASH) Team
Sana'a Government_ Jehanh District
Estimation & Bill Of Quantity for Al Samh Ben Malek School
Estimated ($)
Item
Description of work Unit Remark
No. Qu Unit cost Total cost

A Rehabilitathion of Latrines

Remove the old valve then Supplying and installing steel water valve (1/2") for Bathroom after remove the broken one
and take into account the use of taps which stop leak; the price includes all needs for the completion of the item,
A2 according to the specifications and instructions Supervising engineer. Pics 2

‫") مع كل ما يلزم لتشغيل الحمام والسعر يشمل جميع مايلزم النجاز العمل وبحسب‬1/2(‫ازالة المحبس الجداري التالف ثم توريد وتركيب محبس جديد حديد‬
.‫تعليمات المهندس المشرف‬
F Water Supply Scheme

Supply and installation of plastic pipes 3/4 inch (hot connection type) to feed the 2 tanks on the roof of the school
and on the roof of the latrines with the water from the 5000 liter plastic tank in the yard using pump 1 hp ,and connect
the water point in the latrines to be feeded by water, pipes must be plastic hot connection with all valves and fittings
necessary for installiation and running , according to the specifications, drawings and instructions of the supervising
F4 engineer m 24.0

‫ هنش لزوم الربط من الخزان الجديد في حوش المدرسة الى الخزانات الجديده في سطح مبنى المدرسة‬3/4 ‫توريد وتركيب مواسير بالستيك كبس حراري‬
‫وكذلك سطح الحمامات الواقعة في حوش المدرسة والربط بعد ذلك الى نقاط المياه داخل جميع الحمامات والمغاسل مع عمل المحابس الالزمة والملحقات‬
‫ بحسب الرسومات و المواصفات وتوجيهات المهندس‬,‫ متر‬2 ‫ و العمل كذلك يشمل تثبيت المواسير الظاهرة بكليبات لكل‬, ‫الالزمة للتركيب و التشغيل‬
.‫المشرف‬
0
Prepared by :Mohamed Alhuthi