Remove the old valve then Supplying and installing Croam water valve (1/2 ") for Bathroom after remove the broken
one and take into account the use of taps which stop leak; the price includes all needs for the completion of the item,
A2 according to the specifications and instructions Supervising engineer. Pics 2
") مع كل ما يلزم لتشغيل الحمام والسعر يشمل جميع مايلزم النجاز العمل وبحسب1/2( ازالة المحبس الجداري التالف ثم توريد وتركيب محبس جديد كروم
.تعليمات المهندس المشرف
C Rehabilition of Hand-washing facilitiy ترميم مغسلة
Supplying and installing plastic pipe 4 in sami presuer and connect from all dranage water point in the roof to the water
tank in the yard for collection rain system for one of the school building ; the price includes all needs for the
E2 completion of the item, according to the specifications and drawings and instructions of the supervising engineer. m 25.0
هنش لزوم الربط من نقاط تصريف المياه في السطح وربطه بالخزان االرضي مع عمل محبسين لزوم تجميع مياه4 توريد وتركيب مواسير بالستيك ضغط
.االمطار للمركز الصحي ويتم تثبيتة المواسير والسعر يشمل جميع مايلزم النجاز البند بحسب المواصفات والرسومات وتعليمات المهندس المشرف
Maintenance work for the drainking water point to replace th till to get the pipe that get lacking and faix the damage
then return till works as before the price includes all needs for the completion of the item, according to the
D3 specifications and drawings and instructions of the supervising engineer. L.S 1.0
مفاقدت التسريب الحاصل في نقطة مياة الشرب في حوش المدرسة والتاكد من توقفة بعد خلع البالط لمكان التسريب وتصليح او تغير الماسوره او مكان
.الضرر واعادة العمل كما السابق والسعر يشمل جميع مايلزم النجاز البند بحسب المواصفات والرسومات وتعليمات المهندس المشرف