DEAD LOAD ANALYSIS

Ws Ws
Wtriangle = Wtrapezoid = ¿
3 6

SLAB

16.09(3.6) 16.09(3.6)
Wtriangle = =19.308 kN/m Wtrapezoid = ¿ kN/m
3 6
FIRST FLOOR (3.45m)

Frame C, D (1-3, 4-6)

Slab : =11.628 kN/m


CHB : 4.2(0.3) =1.26 kN/m
Plaster : 0.5(0.3) =0.15 kN/m
Beam : =7.08 kN/m
Total : =20.118 kN/m

Frame 1 (C-D)

Slab : =12.73 kN/m


CHB : 4.2(0.3) =1.26 kN/m
Plaster : 0.5(0.3) =0.15 kN/m
Beam : =7.08 kN/m
Total : =21.22 kN/m

Frame 2 (C-D)

Slab : 12.73(2) =25.46 kN/m


Beam : =7.08 kN/m
Total : =18.708 kN/m

Frame 3&4 (C-D)

Slab : =12.73 kN/m


Beam : =7.08 kN/m
Total : =19.81 kN/m

Frame 5 (C-D)

Slab : 12.73(2) =25.46 kN/m


Beam : =7.08 kN/m
Total : =18.708 kN/m

Frame 6 (C-D)

Slab : =12.73 kN/m


CHB : 4.2(0.3) =1.26 kN/m
Plaster : 0.5(0.3) =0.15 kN/m
Beam : =7.08 kN/m
Total : =21.22 kN/m
SECOND FLOOR (4.5m)

Frame A (1-3, 4-6)

Slab : =19.308 kN/m


CHB : 4.2(3.75) =15.75 kN/m
Plaster : 0.5(3.75) =1.875 kN/m
Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =44.013 kN/m

Frame A (3-4)

Slab : =20.508 kN/m


CHB : 4.2(3.75) =15.75 kN/m
Plaster : 0.5(3.75) =1.875 kN/m
Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =45.213 kN/m

Frame B (1-3, 4-6)

Slab : 19.308(2) =38.616 kN/m


Beam : =7.08 kN/m
Total : =45.696 kN/m

Frame B (3-4)

Slab :19.308+20.508 =39.816 kN/m


Beam : =7.08 kN/m
Total : =46.896 kN/m

Frame C (1-6)

Slab : =19.308 kN/m


Beam : =7.08 kN/m
Total : =26.388 kN/m

Frame K (1-6)

Beam : =7.08 kN/m


CHB : 4.2(3.75) =15.75 kN/m
Plaster : 0.5(3.75) =1.875 kN/m
Total : =24.705 kN/m

Frame 1 (A-C)

Slab : =21.14 kN/m


CHB : 4.2(3.75) =15.75 kN/m
Plaster : 0.5(3.75) =1.875 kN/m
Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =45.845 kN/m
Frame 1 (C-K)

CHB : 4.2(3.75) =15.75 kN/m


Plaster : 0.5(3.75) =1.875 kN/m
Beam :23.6(0.6)(0.4) =7.08 kN/m
Total : =24.705 kN/m

Frame 2 (A-C)

Slab : 21.14(2) =42.28 kN/m


Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =49.36 kN/m

Frame 3&4 (A-C)

Slab : 21.14+22.46 =43.6 kN/m


Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =50.68 kN/m

Frame 5 (A-C)

Slab : 21.14(2) =42.28 kN/m


Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =49.36 kN/m

Frame 6 (A-C)

Slab : =21.14 kN/m


CHB : 4.2(3.75) =15.75 kN/m
Plaster : 0.5(3.75) =1.875 kN/m
Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =45.845 kN/m

Frame 6 (C-K)

CHB : 4.2(3.75) =15.75 kN/m


Plaster : 0.5(3.75) =1.875 kN/m
Beam : 23.6(0.6)(0.4) =7.08 kN/m
Total : =24.705 kN/m
STAIRS

ROOF
AMBBBBOOOOOTTTTT
LIVE LOAD ANALYSIS
Ws Ws
Wtriangle = Wtrapezoid = ¿
3 6

SLAB

12.2(3.6) 12.2(3.6)
Wtriangle = =14.64 kN/m Wtrapezoid = ¿ kN/m
3 6
SECOND FLOOR (4.5m)

Frame A

Along 1-6 : =14.64 kN/m

Frame B

Along 1-6 : =29.28 kN/m

Frame C

Along 1-6 : =14.64 kN/m

Frame 1

Along A-C : =16.031 kN/m

Frame 2-5

Along A-C : =32.062 kN/m

Frame 6

Along A-C : =16.031 kN/m

FIRST FLOOR (3.45m)

Frame C&D

Along 1 : =16.031 kN/m

Frame C&D

Along 2 : =32.062 kN/m

Frame C&D

Along 3 : =16.031 kN/m