Ws Ws
Wtriangle = Wtrapezoid = ¿
3 6
SLAB
16.09(3.6) 16.09(3.6)
Wtriangle = =19.308 kN/m Wtrapezoid = ¿ kN/m
3 6
FIRST FLOOR (3.45m)
Frame 1 (C-D)
Frame 2 (C-D)
Frame 5 (C-D)
Frame 6 (C-D)
Frame A (3-4)
Frame B (3-4)
Frame C (1-6)
Frame K (1-6)
Frame 1 (A-C)
Frame 2 (A-C)
Frame 5 (A-C)
Frame 6 (A-C)
Frame 6 (C-K)
ROOF
AMBBBBOOOOOTTTTT
LIVE LOAD ANALYSIS
Ws Ws
Wtriangle = Wtrapezoid = ¿
3 6
SLAB
12.2(3.6) 12.2(3.6)
Wtriangle = =14.64 kN/m Wtrapezoid = ¿ kN/m
3 6
SECOND FLOOR (4.5m)
Frame A
Frame B
Frame C
Frame 1
Frame 2-5
Frame 6
Frame C&D
Frame C&D
Frame C&D