Work Program Banting Phase 3
Work Program Banting Phase 3
0%
4 ARCHITEC 1 0% 3/1/2024 3/2/2024
6/15/2024 6/16/2024
4.2 ROOF COVERING & FINISHES 1 0%
4.3 DOOR FRAME 1 0% 6/16/2024 6/17/2024
5/15/2025 5/16/2025
4.14 PAINTING WORK (UNDERCONT) 1 0%
4.15 DOOR LEAF 1 0% 5/16/2025 5/17/2025
1/15/2025 1/16/2025
4.16 ALUMINIUM GLASS WORK 1 0%
1/15/2025 1/16/2025
4.2 M&E TESTING & COMMISSIONING 1 0%
1/15/2025 1/16/2025
4.21 PAINTING WORK (FINAL CONT) 1 0%
1/15/2025 1/15/2025
5 EXTERNAL WORK WITH LOT BOUNDARIES 0 0%
5.1 APRON & PERIMETER DRAIN 0 0% 1/15/2025 1/15/2025
1/15/2025 1/15/2025
6 EXTERNAL INFRA WORK 0 0%
0 0% 1/15/2025 1/15/2025
0 0% 1/15/2025 1/15/2025
9 0 0% 1/15/2025 1/15/2025
0 0% 1/15/2025 1/15/2025
10
11
Pembinaan Cangkat Hartamas Sdn. Bhd.
Project: Banting Phase 1C & 9A
Title: Piling Program Sequence
Date: 11/25/2021
Order 1 2 3 4 5 6 7 8
Block No. D1 C3 C2 C1 A12 A11 A10 A9
9 10 11 12 12 13 14 15 16 17 18
A8 A5 A6 A7 A8 A3 A2 A1 B1 B2 B3
19 20 21
B4 B5 B6