Professional Documents
Culture Documents
Valenzuela AOP 2022 Enhance Form 3.1
Valenzuela AOP 2022 Enhance Form 3.1
AOP Form 3.1. LGU INVESTMENT NEEDS FOR HEALTH FACILITY DEVELOPMENT AND WATER/S
Region : NCR
Province/HUC/ICC: : VALENZUELA CITY
AOP Year: : 2022
Municipality/
Name of
District Component Category Project Description
Facility
(1) City/ Barangay (3) (5)
(4)
(2)
Fetal Doppler
Infant weighing scale
Medicine cabinet
minor surgical set
Desktop sterilizer
Autoclave units, 20 liters
Portable UV light sterilizer with
remote control
1 Valenzuela CO-E Lying-in
Fetal Doppler
Generator set
staff locker
1&2 Valenzuela CO-E Nutrition Unit WYD Checker
1&2 Valenzuela CO-E Vaccine room vaccine refrigerator
1 Valenzuela CO-E VCEH Type 2 Ambulance
Vehicle for
1&2 Valenzuela CO-E CESU/CHO
OplanSita/Surveillance
1&2 Valenzuela CO-E Sanitation Unit vehicle for implementation
Maysan PT
1&2 Valenzuela CO-E Desktop Computer with printer
Clinic
1&2 Valenzuela CO-E Nutrition Unit laptop
1&2 Valenzuela CO-E Supply Unit Laptop
1&2 Valenzuela CO-E Health Centers laptop
1&2 Valenzuela CO-E Vaccine room Computer printer
Subtotal
II. Maintenance and Other Operating Expenses
Microtoise
Infrared-non-contact thermometer
Physical Medium ankle weights
1&2 Valenzuela MOOE
Therapy Clinic
Thermal scanner
Digital BP apparatus
Negatoscope
Aneroid BP apparatus
Oxygen tank
Pulse Oximeter (finger tip)
Refrigerator Thermometer
Stethoscope, adult, littman
Thermal scanner
3 Panel screen
Digital BP apparatus
Emergency light
filing cabinet
1&2 Valenzuela MOOE Lying-in clinics Generator Battery
Manual BP apparatus
Thermal scanner
Sub-total
Total
xcludes the legislative districts covered by the HUC/ICC where they will also be reflected in the latter’s respective plans.
he facilities are located; indicate if area covers GIDA/IP/Urban poor and other vulnerable population
Station (BHS); Others - those which are categorized as hospital, RHU or BHS (eg. CHO, Blood Centers, LGU TRC etc)
acility – the exact name of the facility
per LGU facility, e.g. expansion of OPD, construction of RHU birthing facility, upgrading and equipping
(6) Facility Investment Needs – the specific investment needed for the facility
construction, repair, rehab, upgrading of facilities
pment –specific equipment needed for the facility
r Vehicle – ambulance, patient transport
nvestment for the facility after summation of all required resources
which/what office will be able to fund the investment
H Central Office, Centers for Health Development
Consolidated from PLGU (province), CLGU (city), MLGU (municipality); BLGU (Barangays)
§ Others - Other Fund Sources: from Official Development Assistance (eg. UN Agencies, development
partners); other national agencies; NGOs/CSOs whether local or national; private and other sectors; and
unfunded PPAs
VELOPMENT AND WATER/SANITATION FACILITIES
30,000,000.00 30,000,000.00
15,000.00 810,000.00
16,000.00 80,000.00
15,000.00 150,000.00
17,500.00 175,000.00
15,500.00 186,000.00
45,000.00 405,000.00
15,000.00 345,000.00
25,000.00 50,000.00
20,000.00 160,000.00
17,500.00 175,000.00
50,000.00 100,000.00
15,000.00 105,000.00
45,000.00 45,000.00
123,960.00 123,960.00
15,500.00 46,500.00
50,000.00 50,000.00
200,500.00 401,000.00
2,500,000.00 5,000,000.00
1,158,000.00 1,158,000.00
1,158,000.00 1,158,000.00
55,000.00 55,000.00
55,000.00 55,000.00
40,000.00 40,000.00
40,000.00 40,000.00
40,000.00 480,000.00
16,000.00 16,000.00
otal 41,409,460.00
2,000.00 120,000.00
4,000.00 280,000.00
4,500.00 225,000.00
6,000.00 18,000.00
2,900.00 8,700.00
230.00 690.00
2,500.00 7,500.00
6,000.00 18,000.00
9,000.00 9,000.00
6,000.00 282,000.00
8,500.00 34,000.00
3,559.00 56,944.00
5,400.00 415,800.00
420.00 11,340.00
1,750.00 8,750.00
2,600.00 2,600.00
8,273.00 24,819.00
8,000.00 136,000.00
5,800.00 5,800.00
1,000.00 29,000.00
1,100.00 24,200.00
8,000.00 40,000.00
2,500.00 215,000.00
4,750.00 14,250.00
10,000.00 20,000.00
5,400.00 10,800.00
2,200.00 33,000.00
8,273.00 8,273.00
10,500.00 21,000.00
6,000.00 12,000.00
8,500.00 59,500.00
2,500.00 7,500.00
otal 2,159,466.00
tal 43,568,926.00
e latter’s respective plans.
equipping
encies, development
d other sectors; and
Cost per Fund Source (PhP)
(7)
DOH
Remarks
LGU Others
Central Office CHD
30,000,000.00
810,000.00 54 units
80,000.00 5 units
150,000.00 10 units
175,000.00 10 units
186,000.00 12 units
405,000.00 10 units
345,000.00 23 units
50,000.00 2 units
160,000.00 8 sets
175,000.00 10 units
100,000.00 2 units
105,000.00 7 units
45,000.00 1 unit
123,960.00
46,500.00 3 unit
50,000.00 1 unit
401,000.00 2 units
5,000,000.00 2 units
1,158,000.00
1,158,000.00
55,000.00
55,000.00 1 unit
40,000.00
40,000.00
480,000.00 12 units PBSP
16,000.00
8,613,460.00 - 32,316,000.00 480,000.00
120,000.00 60 pcs
280,000.00 70 pcs
225,000.00 50 pcs
18,000.00 3 units
8,700.00 3 pcs
690.00 3 pairs
7,500.00 3 units
18,000.00 3 units
9,000.00 3 units
282,000.00 47 units
34,000.00 4 units
56,944.00 16 units
415,800.00 77 units
11,340.00 27 pcs
8,750.00 5 units
2,600.00 1 unit
24,819.00 3 units
136,000.00 17 units
5,800.00 1 tank
29,000.00 39 pcs
24,200.00 22 units
40,000.00 5 pcs
215,000.00 86 pcs
14,250.00
20,000.00 2 sets
10,800.00 2 unit
33,000.00 15 unit
8,273.00 1 unit
21,000.00 2 units
12,000.00 2 units
59,500.00 7 units
7,500.00 3 unit
- - 2,159,466.00 -
420,460.00