Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

001 / PUMA / PROD - From / 23

1 2 3 4 5 6 7 8

N5 N1 N3 N6
N5 No. Document
A N3 N4 N4
007 / PUMA / PROD - Gbr / 01-23 A
FRONT

B B

426

426

426
TC#10 TC#9 TC#4 TC#3 TC#6 TC#5

1051
1201

1201
157 200 260 400 261 260 400 261
C C
427

427

427
76

CABLE LENGTH
10 METERS
D D
150

1080 1080
RIGHT SIDE ELEVATION FRONT ELEVATION REAR ELEVATION

300 161
N6 N1 N5 N4 N6
E E
FRONT REAR
ITM QTY DESCRIPTION SIZE TYPE NOTICE
ON BROS RB NOS

80
IS . SO I
E-VENT . E-VENT
N1 1 INLET 4 INCH STEEL PIPE CLOSED WITH BLIND FLANGE

RR
MOR
FIG. 245 RELIEF FIG. 245 RELIEF

. OC
CO

OM
PRESSURE <0.5 PSI PRESSURE <0.5 PSI

.
LISTED LISTED

CABLE ROLL
C U US
L 97Y9
AUTOMOTIVE FUELS AND SIMILAR LIQUIDS
FOR INSTALLATION BY QUALIFIED
97Y9 US LU C

AUTOMOTIVE FUELS AND SIMILAR LIQUIDS


FOR INSTALLATION BY QUALIFIED
N2 1 INTERSTITIAL / MONITOR 2 INCH STEEL PIPE CLOSED WITH HUBCAP
TC#1
PERSONS-FOLLOW ALL INSTRUCTIONS PERSONS-FOLLOW ALL INSTRUCTIONS

TIED WITH WITH W / O SCREEN 331750 SCFH


N7
W / O SCREEN 331750 SCFH

N3 1
W / SCREEN 277011 SCFH W / SCREEN 277011 SCFH

CABLE TIES
VENT CAPACITY
AT 2.5 PSI
VENT CAPACITY
AT 2.5 PSI
OUTLET 4 INCH STEEL PIPE CLOSED WITH BLIND FLANGE

299
4 FILL

665
N1 N3 N4 3 INCH STEEL PIPE CLOSED WITH HUBCAP
E
HOL TC#12
N5 1 PRIMARY E -VENT 6 INCH STEEL PIPE INSTALLED PRIMARY E-VENT
77 TC#11 N2
F N6 1 SECONDARY E -VENT 6 INCH STEEL PIPE INSTALLED SECONDARY E-VENT F
426

N7 1 NORMAL VENT 2 INCH STEEL PIPE CLOSED WITH HUBCAP, REMOVED

87
TC#2 DURING THE TEST

TC#8 TC#7
381 80 N4 FRONT
ITM DESCRIPTION
1201

1080 1080
157 200 BOTTOM ELEVATION TOP ELEVATION TC#1 + TC#2 Located on the top of the tank
FR
G ON TC#3 + TC#4 Located on the front of the tank G
T
427

TC#5 + TC#6 Located on the rear of the tank


TC#7 + TC#8 Located on the left of the tank
#1 TC#9 + TC#10 Located on the right of the tank
TC
TC TC#11 + TC#12 Located on the bottom of the tank
#8
#2 TC TC# Termocouple With Cable Lenght 10 Meters
H TC #7 PROJECTION : H
# 6 SCALE : SIGN DATE
TC
#3
LEFT SIDE ELEVATION TC DRAWING : AS 01/02/2023
#5
TC CHECKED : JS 01/02/2023
NOTE :

TC #4
#10 TC
TC CHECKED :
# 9
I I
APPROVED :
# 11
TC THERMOCOUPLE POSITION
12
SAMPLE MODULAR
#
TC
PT. PRIMA USAHA MITRA ABADI
Drawing No.
A3
J ISOMETRI 23-PUMA-MT-S-01 J
PRIMARY TANK Jl. Raya By Pass Jomin No. 88 Cikampek Sheet Rev
Telp. ( 0264 ) 8330.330 / ( 0264 )8330.155 1-1 1
1 2 3 4 5 6 7 8

You might also like