SYSTEM INFORMATION
Protected Room / location
Type of Fire Protection System ✔ Pre-action Deluge
Type of Pre-action Single Interlock Non-Interlock
*Not applicable for deluge system ✔
Double Interlock
Product Approval Ref. No.
TESTING AND COMMISSIONING
Pre-Commissioning
System is installed as per approved drawing ✔
Yes No
System is in normal condition ✔ Yes No
Testing equipment is calibrated (e.g. Pressure gauge) ✔ Yes No
Functional Test
Detection devices are tested ✔
Yes No
Pre-action / deluge valve operation is tested ✔ Yes No
Manual release is tested ✔ Yes No
Interfacing with other life safety system ✔ Yes No N/A
Air System Pressure (Pre-action only) 32 psi
Air Cut-in Pressure (Pre-action only) 42 psi
Static Water System Pressure 120 psi
Residual Water Pressure 105 psi
Time to release the water 0 sec
CERTIFICATION
The system as specified above has been installed and tested, in accordance with latest edition of NFPA, QCDD FSS and QCDD
approved drawings.
__________________________________ _______________________________________________
( 29240001137/ 50320520 )
Fire Fighting Contractor (QCDD Certificate No. / ID No. / Mobile No.)
(Signature over Printed Name with Company Stamp)
CERTIFICATION
The undersigned accepted the installation and testing of the system as specified above.
__________________________________ _______________________________________________
Consultant (UPDA No. / ID No. / Mobile No.)
(Signature over Printed Name with Company Stamp)
Note: All fields are mandatory
Page 1 of 1