QC DPR-2023-04-08
QC DPR-2023-04-08
8-Apr-23
QC DPR
Pipe Painting Inside
Pipe Line Welding (Joint) Lowering and Coating Piping Pipe Painting Inside Shukier
Ras Bakr
Loweing (per M)
Finished Coat
Finished Coat
Sandblasting
Sandblasting
Total Welds-Inch
Items
2nd Coat
3nd Coat
2nd Coat
3nd Coat
Welding
RT (Per Weld)
Finished Coat
Welds (No.)
2 nd Coat
Done
Done
ACC
ACC
Coat
Scan
Rej.
Rej.
Daily 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Previously 5244 5205 5031 169 307 307 0 921 769 9257 279 1169.5 86 0 0 0 125 125 125 125 0 0 0 0
Total (Done) 5250 5205 5031 169 307 307 0 921 769 9257 279 1169.5 86 0 0 0 125 125 125 125 0 0 0 0
Required 5500 5200 300 1100 12000 504 2613 100 300 270 5
% Done 95.5% 100.1% 96.7% 3.2% 102.3% 100.0% 0.0% 83.7% 69.9% 77.1% 55.4% 44.8% 86.0% 0.0% 0.0% 0.0% 46.3% 46.3% 46.3% 46.3% 0.0% 0.0% 0.0% 0.0%
Supports
Items
Finished Coat
Finished Coat
Finished Coat
Sandblasting
Blasting and
Blasting and
Fabrication
Fabrication
2 nd Coat
2 nd Coat
2nd Coat
Erection
Erection
Erection
1st Coat
1st Coat
Daily 24 12 50 0 10 0 0 0 0 3 0 0 0 0 0
Previously 246 183 145 145 128 528 528 528 528 338 26 25 25 25 0
Total (Done) 270 195 195 145 138 528 528 528 528 341 26 25 25 25 0
% Done 28.0% 20.2% 20.2% 15.0% 14.3% 100.0% 100.0% 100.0% 100.0% 64.6% 76.5% 73.5% 73.5% 73.5% 0.0%