Professional Documents
Culture Documents
Notes For Afriline
Notes For Afriline
Notes For Afriline
ROADWORKS
The 500mm layer referred to in the standard drawings is just wetting and compacting
the existing in-situ material (effective to a depth of 500mm) (sufficiently weighted
roller compactor required to avoid excavation)
Thereafter, 150mm G7 to be layed and compacted.