Engineer with 14+ Years of experience in Electrical Engineering for EPC projects in the field of Oil
and gas, Chemical and power industry.
Excellent professional track record in integrated engineering activities right through preparation of
electrical design philosophy, Single Line diagrams, Sizing and selection of electrical equipments,
preparation of data sheets and specifications, Preparation of typical schematic diagrams, Preparation
of RFQ's for electrical packages, Bid evaluations, review of vendor drawings and Inspection &
witnessing factory acceptance test.
Review of electrical detail design drawings such as Switchgear equipment layouts, Cable tray
routing, earthing layouts and illumination layouts. Preparation of cable schedules, Preparation of
schematic and Interconnection diagrams.
Good inter department co-ordination skill and client interaction skill for project execution.
CAREER HISTORY:
Worked as a Senior Technical Professional – Electrical in KBR (Kellogg Brown & Root
Engineering & Construction India Private Limited), Chennai. I have been deputed and worked in
DOW Chemical International Private Limited (DOW India) from 6th June 2019 to 4th May 2020.
Worked as a Senior Engineer-Electrical for Thyssenkrupp Industrial Solutions India Pvt Ltd
(formerly Uhde India Private Limited) from 1st October 2017 to 7th November 2018.
Worked as a Design Engineer-II (Engineering- Electrical department) for Fluor Daniel India Private
Limited, New Delhi, from 25th November 2013 to 08th June 2017.
Worked as a Senior Engineer in Electrical department of Air Liquide Engineering India Pvt. Ltd,
from 1st October 2007 to 15th December 2010.
AREAS OF EXPERIENCE:
Design basis and Preparation of following drawings/documents for detail engineering.
SLDs. Design basis.
Single line diagram
Load list
Page 1 of 4
Equipment Perform following design calculations/ Equipment sizing.
Sizing Transformer Sizing Calculations
Calculations Cable sizing calculation
Earthing design calculations
Lightning Protection design calculations
illuminations design calculation
Battery & battery charger sizing calculation
Capacitor bank sizing calculation
Technical Preparation of Technical specifications, Data sheets, Drawings for Material
Specifications Requisition of the following Electrical equipments.
and data sheets HV & LV Transformers
HV Switchgear & LV Switchgears and Power distribution boards.
HV & LV Bus ducts
HV & LV Power cables and Control cables
HV & LV Motors
Variable speed drives (VFD)& VFD Panels
Uninterrupted Power Supply (UPS) & UPS Distribution Boards
Battery (VRLA, Ni-Cad etc.)
Battery charger & DCDB
Neutral Grounding Resister (NGR)
Automatic Power Factor Correction Panels (APFC Panels)
Local control stations (LCS)
Illumination System (Lighting fixtures, High mast lighting, lighting poles &
lighting junction boxes etc.)
Earthing & Lightning Protection Materials.
Cable trays, HT end terminations kits, Cable glands, cable lugs
Technical Bid Review of various offers received from vendors and preparation of technical
Evaluation clarifications (TC) and Technical Bid Evaluation (TBE).
(TBE) and Preparation of purchase specifications as required for ordering.
Vendor Drawing Review of Vendors drawings.
Review.
Layout Preparation and Review of following detail engineering drawings
Engineering/ Substation/ Switchgear room equipment layout drawings.
Detail Cable routing drawings.
Engineering Earthing and Lightning protection drawings.
Drawing review. Lighting and small power layout drawings.
Typical power & control schemes for HV Switchgear, LV Switchgear and
Electrical control panel.
Cable schedules and cable interconnection drawings.
Process/ Review of electrical related drawings/ documents for the following Mechanical/
Mechanical Process equipments for Power Plants
Equipments Water Treatment Plant (WTP)
Boiler
Electro Static Precipitator (ESP)
Coal Handling Plant (CHP)
Ash Handling Plant (AHP)
ETAP study Perform Power System Studies such as Load Flow Analysis, Short Circuit
Analysis, Motor Starting Analysis by using ETAP
Factory Inspection & Witnessing factory acceptance test, routine & type test at vendor
acceptance test works for electrical equipments like Motors, Switchgear and Cables.
Page 2 of 4
(FAT)
Other Inter discipline coordination as a part of detail engineering activities
responsibilities Document Approval process cycle of Electrical deliverables with PMC/Company.
Understanding of relevant IS, IEC, IEEE & Other international standards, code of
practice and procedures.
Provide technical direction, assign and coordinates work to draftsman, designer
and engineer.
Coordinating with the site engineer and site visits if required.
Maintenance of Drawings and other Engineering Documents.
SOFTWARE SKILLS:
Electrical Transient Analysis Program (ETAP)
Smart Plant Electrical (SPEL)
Navisworks Freedom (3D Model Review Tool)
Dialux, Chalmit (Lighting Software Tool)
MS Office (MS Word, MS Excel & MS Power point)
Bayport Provox I/O Migration: Electrical scope of this project is to perform Input /
Output migration from Provox Modicon to the newly installed BSM Delta V SIS cabinets
in the MCC Building.
PROFESSIONAL QUALIFICATION:
Bachelor of Technology (B.Tech) in Electrical & Electronics Engineering from Jawaharlal Nehru
Technological University College of Engineering (Autonomous), Hyderabad, India in 2005.
PERSONAL PROFILE:
Name : Amarender. Gudikandula
Father Name : Ramachandram.
Date of Birth : 31-03-1984.
Nationality : Indian.
Marital status : Married
Languages Known : English, Telugu and Hindi.
Passport Details : Z4589752 (Validity up to 29/08/2028)
DECLARATION:
I hereby declare above furnished information’s are correct and I am responsible for its accuracy.
Amarender. Gudikandula
Page 4 of 4