Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

14/1/22 13:14 Working Principles - SUN2000-(2KTL-6KTL)-L1 User Manual - Huawei

 

Support

Documentation
 Digital Power   Fusion Solar PV   SUN2000L   Operation & Maintenance   User Manual 

SUN2000-(2KTL-6KTL)-L1 User Manual


This document describes the SUN2000-(2KTL-5KTL)-L1 in terms of its installation, electrical connection, commissioning, maintenance, and troubleshooting.

About This Document


Search in this manual Translation

Safety Information
Favorite
Rate and give feedback:


Product Introduction
Download
Overview

Component Description
Working Principles Updated: 2022-01-04

Label Description
Related
Working Principles Schematic Diagram
Documents
The SUN2000 receives inputs from up to two PV strings. Then the inputs are
SUN2000 Storage grouped into two MPPT routes inside the SUN2000 to track the maximum power SUN2000-4.95KTL-NHL2
point of the PV strings. The DC power is then converted into single-phase AC User Manual
System Installation power through an inverter circuit. Surge protection is supported on both the DC
and AC sides. SUN2000-4.95KTL-JPL1
Electrical Connection User Manual
The SUN2000 uses a reserved battery port for energy storage expansion. Battery
performs charging and discharging operations according to the battery working
System Commissioning SUN2000-(2KTL-6KTL)-L1
mode.
Gebruikershandleiding
Man-Machine Interaction Figure 2-7 Schematic diagram

System Maintenance
Digital Signature
SUN2000 Disposal File
Technical Parameters Digital Signature Authentic
ation Mode
Grid Code
Working Mode
Device Commissioning Share
Figure 2-8 Working modes

Resetting Password

Rapid Shutdown

Locating Insulation Resistance


Faults

Acronyms and Abbreviations

Table 2-3 Working mode description

Working Description
mode

We use cookies on this site,including third party cookies,in order for the site to work properly and to cookie settings
analyse traffic,offer enhanced functionality,social media features and personalise content and
ads.Learn more Accept Cookies

Previous

https://support.huawei.com/enterprise/en/doc/EDOC1100136173/6df06f82/working-principles 1/2
14/1/22 13:14 Working Principles - SUN2000-(2KTL-6KTL)-L1 User Manual - Huawei

Working Description
mode

Standby The SUN2000 enters Standby mode when the external


mode environment does not meet the requirements for starting
the SUN2000. In Standby mode:
The SUN2000 continuously detects its operation status.
Once the operating conditions are met, the SUN2000
enters Operating mode.
If the SUN2000 detects a shutdown command or a fault
after startup, it enters Shutdown mode.

Operating In Operating mode:


mode The SUN2000 converts DC power from PV strings into AC
power and feeds the power to the power grid.
The SUN2000 tracks the maximum power point to
maximize the PV string output power.
If the SUN2000 detects a shutdown command or a fault,
it enters Shutdown mode.
If the SUN2000 detects that the output power of PV
strings does not meet the requirements for grid-tied
power generation, it enters Standby mode.

Shutdown In Standby or Operating mode, if the SUN2000 detects a


mode shutdown command or a fault, it enters Shutdown mode.
In Shutdown mode, if the SUN2000 detects that the fault
is rectified or the startup command is executed, the
SUN2000 enters Standby mode.

Follow Us 
About Huawei 
How to Buy 
Partner 
Resources 
Others 

Huawei e+ App

Copyright © 2021 Huawei Technologies Co., Ltd. All rights reserved.

Privacy | Terms of use | RSS Subscribe | Sitemap

We use cookies on this site,including third party cookies,in order for the site to work properly and to cookie settings
analyse traffic,offer enhanced functionality,social media features and personalise content and
ads.Learn more Accept Cookies

Previous

https://support.huawei.com/enterprise/en/doc/EDOC1100136173/6df06f82/working-principles 2/2

You might also like