alerarranta son
seen eet
wT yea sratert
aHaTera, aE yoo 08%
www.maharashtra.gov.in
fea: gt) 09 how
a, Soper wea areal Aye Sete farararad Sate soa arena
fete RR/ou/RoRe a
z Rar
a ATTA 0.00 ATHAT
we i, SSAA Hetearer Sie see, & ATTA, Harr, aS
fava aatetata Sat weReTTTET on
| Se sei, Satara Pree |
aeateiat St Pata aaa, AAA (SN)
at at area ag, aT Sa
3. cea sere, are aT
ve, re er ary, fre fear
4. at RS afaa, Prats fart
| 8. creme Tar oreenrata Serer, Fara
| 9, Reretarers, Herat, Tot
Je. dare, ae a
8. at ate abst, vas csi
to, aaa date atraret
ord aan aries agen faarnd aera a sates ys shears aed dara
deuiia favernatet afer feomit a facfaaict at (soft Copy/(Email-
demprograme@maharashtra.gov.in ) 41 HAAS 4 Hate ASHE SITE HH AAT.
aoe ara meee aferaren ata aeatd sfage dora
atenvjeqéas ait araiedta ada alee ania aoste qe wart 7
‘aa ANE era.
dots era aercart doamaat tu fare dower foarelt safters were.
aoe airariet deat sfaqe a sa qert agate aretardt ure feat
ara faa wrt afeTAH we. TATOOS MAYA RE(TAAL), erie ¥
FE, 2088 Bete aAS Peer arer wera,
aeiconteret Safer Fafa arctan ade satan wetter are carer aaew arrest
aera a Fay ara, Faria.
row?
‘aivaz)
arnt afar
OR-AORWOU/WOOLY
wa rare afera (st), sein, sont a erm Pru sister, Hag,
Wa
2) AT at ah aie art afaa, tare, Has
2 BL ea at Gah aia Gert afaa, darera, daeSu 's on accelerating it
1. Simplify approval process for faster installation
a. Process applications directly through STU instead of routing through MEDA. Only
MEDA registration to continue (refer to table in annexure)
b. Issue GR for procedure of use of agriculture land for purposes of renewable energy
project: currently each circle is making its own interpretation
Exemption of Electricity Duty should continue for projects commissioned before 31.3,2024
a. Under the old renewable energy policy, Electricity Duty was exempt for 10 years
b. Under new policy, all projects commissioned after 31.12.2021 will not have this
benefit
Electricity Duty for captive projects is Rs 1.2 per unit now
d._ If same consumer is buying power from MSEDCL, Electricity Duty is Rs 0.7 pu (7.5%
of the total bill amount)
3. Reduction in transmission charges for 10 years to encourage new projects
Transmission charges in Maharashtra are 82 paisa per unit compared to just 8 paisa
being charged in Karnataka
Injection [Transmission [Distribution [Transmission [Distribution
lLevel__|state Charges [Charges _|Losses(%) _|Losses (%)
(Maharashtra 0.82| 0.57| 3.0% 8.0%
DISCOM |Karnataka 0.08] 0.41] 3.0%) 5.0%
(Maharashtra 0.82| 3.0%|
TRANSCO [Karnataka 0.08] 3.054
Note: If buying/selling from outside Maharashtra other charges of 50-60 paisa will apply
b. Reduction in transmission charges for new projects will not have any impact on
financial health of MSETCL or MSEDCL
c. There is existing spare capacity in the system to accommodate new projects
4. Good and stable banking policy for next 10 years
2. Maharashtra currently allows monthly banking which should be changed to annual
banking
b. Banking policy should be stable for at least 10 years5. Remove tariff cap on Solar Agri Feeder tenders
a. Current tenders have not been successful - bids received only for 150 MW against
tendered volume of 1500 MW
Tender Tariff Cap Bid Quantity Bid received
Susan 3.05-3.10 500 MW. 69 Mw
KucUMC 2.30 500 MW. No response so far
Bid has been
extended
b. Main reason is unviable cap on tariff
c. We believe that if state allows price to be discovered through free market, it will
attract lot of investors
d. Agri Feeder projects can be commissioned in relatively shorter period compared to
large solar parks
6. Encouragement to private industries to boost renewables production including wind, solar
and biomass
‘a. Allow capacity of upto 200% of Contract Demand under Net Billing and 2 MW under
net meteringGrid connectivity Process
Pa