Reference No.

of the Punchlist Type of work / Section Completed Inspection Date

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00102 16-Jan-23

KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00104 15-Jan-23
KAFD-MUP-SBC-ARC-IRE-00108 9-Jan-23
KAFD-MUP-SBC-CIV-IRE-00123 16-Jan-23
KAFD-MUP-SBC-CIV-IRE-00123 16-Jan-23
KAFD-MUP-SBC-CIV-IRE-00123 16-Jan-23

KAFD-MUP-SBC-CIV-IRE-00124 15-Jan-23
KAFD-MUP-SBC-CIV-IRE-00125 16-Jan-23

KAFD-MUP-SBC-CIV-IRE-00126 15-Jan-23

KAFD-MUP-SBC-CIV-IRE-00127 15-Jan-23

KAFD-MUP-SBC-CIV-IRE-00128 17-Jan-23

KAFD-MUP-SBC-CIV-IRE-00129 15-Jan-23

KAFD-MUP-SBC-CIV-IRE-00132 17-Jan-23

KAFD-MUP-SBC-CIV-IRE-00133 16-Jan-23
KAFD-MUP-SBC-CIV-IRE-00139 19-Jan-23
KAFD-MUP-SBC-CIV-IRE-00140 19-Jan-23
KAFD-MUP-SBC-CIV-IRE-00142 19-Jan-23
KAFD-MUP-SBC-CIV-IRE-00143 19-Jan-23
KAFD-MUP-SBC-CIV-IRE-00144 19-Jan-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23
KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-ELE-IRE-00001 12-Feb-23

KAFD-MUP-SBC-IRR-IRE-00016 21-Jan-23
Area Parcel Supervision Consultant Contractor Discipline

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural


AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Architectural
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil


AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil


AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil
AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Civil

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical


AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Electrical

AREA-1 Ground Level Ashbelya Consulting Engineers SBCM Irrigation


Description of snag/Punchlist Items
Missing bollards to be installed near water
feature 3
Missing manhole with inlaid paving near
water feature 4, to be installed
Paving and curbstone along water feature 3
shall be continued and installed
Missing manhole with inlaid paving near
water feature 3, to be installed
Missing manhole with inlaid paving near
water feature 2, to be installed. Also missing
cladding of water feature 2 shall be fixed
Install missing paving along the curbstone of
water feature 2
Missing bollards to be installed near water
feature 2
Missing manhole with inlaid paving near
water feature 1, to be installed
Complete the hardscape rectification works
along Part 1 of ROW. Refer to the
dilapidation report

Continuation of sidewalk installation at the


Area 1 Entrance and Exit has not yet
executed on-site. Refer to the approved shop
drawing and issued KAFD demolishing layout
plan
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Timber bench installation not yet done – Shall be included in the Outstanding Works
Architectural works – Phase (2) Bridge Crossing No.2
SBCM is to submit WIR for installation of handrail
for electrical works
Polish the handrails as per the project specs finish
Testing and commissioning of handrail LED lighting
SBCM to do painting works of all existing vent grills
including fabrication of remaining vent grills in area
1 Ground floor (OUTSTANDING WORKS FOR
ALL AREAS)
SBCM is to install all ventilation boxes in Area 1
inner ring road (OUTSTANDING WORKS)
SBCM is to install all Bollards in Area 1 Ground
floor including the Inner ring road (OUTSTANDING
WORKS)
SBCM is to install all boards for signages as per
the approved shop drawing KAFD-MUP-SBCARC-SHD-00057 R01. (OUTSTANDING WORKS)
SBCM is to repair all expansion joints in Area 1,
Ground Floor (OUTSTANDING WORKS)
SBCM is to install all movement joints in Area 1
(OUTSTANDING WORKS)
SBCM is to continue the installation of Railing in
Area 1 Ground floor near the pedestrian bridge and
other areas for railing (OUTSTANDING WORKS)
SBCM is to construct drainage in Area 1 along
parcel 1.05 (OUTSTANDING WORKS)
Civil & Architectural works – Stair at Parcel1.02 Corner
Civil & Architectural works – Inner Ring Road Ramp at Parcel 1.02 Corner
Civil & Architectural works – Area (1) – Void Near Parcel 1.18
Civil & Architectural works – Phase (11) Area Between Parcels 1.11 & 1.12
Civil & Architectural works – Phase (2) Bridge Crossing No.1

SBCM to complete the termination and


installation of the solenoid valve inside the
valve Box, Including checking the continuity
& Megger Tester of each cable/wire coming
from the Irrigation controller located at the
planter (Typical)

SBCM to complete the installation and


termination of irrigation controller in area -1
Inner Ring Road
Installation and termination of the junction
boxes of the landscape lighting
Installed and terminate of the bench light
fixtures in the area and must terminated to
the power supply source
To complete the termination and installation
of Irrigation wire and cable of irrigation system from loop to loop going to irrigation
controllers
Seal and closed the opening of existing
junction boxes of lighting fixtures
SBCM to check the DB like, termination of
cable, Spare MCB, MCCB and must be
conducting a Megger Resistance and
Continuity test of all the cable and wires
SBMC to check the driver and test the wire
inside the enclosure and must work
completely
Complete termination and installation of
grounding system including Rod, Clamp,
Insulated grounding

SBCM to check the DB like, termination of


cable, Spare MCB, MCCB and must be
conducting a Megger Resistance and
Continuity test of all the cable and wires

SBCM must provide the cable tagging of each


cable and wire corresponding to solenoid
valve and Irrigation Controller
Testing and Commissioning of the electrical
work at area – 1 Inner Ring Road
Final testing and commissioning when water becomes available from mainline, with full
automation of the system