When new products are introduced, learning-curve effects can have a major
influence on production scheduling.
3. The cumulative average-time learning model with a 90% learning curve indicates
that if it takes 100 minutes to manufacture the first unit of a new model, then the
second unit will take only 90 minutes to manufacture.
4. The incremental unit-time learning model with a 90% learning curve indicates that if
it takes 100 minutes to manufacture the first unit of a new model, then the second unit
will take only 90 minutes to manufacture.
5. A learning curve is a function that measures how labor-hours per unit decrease, as
units of production increase.
6. Data collection problems can arise when data is recorded manually rather than
electronically.