ANCHOR BOLT INSTALLATION REPORT

PROJECT: PENTA OCEAN-PROPOSED ERECTION OF A 20 STOREY ELECTIVE CARE CENTRE


AND NATIONAL DENTAL CENTRE WITH 4 BASEMENTS AT SECOND HOSPITAL AVENUE
(BUKIT MERAH)
LOCATION: PLOT H8

Dear MR/Mrs,

This following item was installed and completed as per reference drawing. To be noted that
our scope for installation of anchor bolt.

S/N GRID LINE TOTAL ANCHOR BOLT PER FOOTING


1 D/6 6
2 C/6 6
3 B/6 6
4 D/8 6
5 D/10 6
6 D/12 6
7 D/13 6
8 D/14 6
9 A1/8 6
10 A1/10 6
11 A1/12 6
12 A1/13 6

Please refer to the attached drawing.


Thanks,

Regards,

TOH LEONG SENG DATE: 5/5/2023


SENIOR PROJECT MANAGER
DLE STEEL INTERNATIONAL PTE LTD