Anant SPG MOM 7-08-18
Anant SPG MOM 7-08-18
Division
MOM
(Minutes of Meeting)
Period of Work
Model M/C No Type of Work Area of complaint
From To
LR9AX SD 01-08-18 Till Now Fine tuning
Running
Total Received power Bare
M/c Installed with Remark
m/c at site on Commissioned
material
LR9AX 25 25 25 25 25 25 All running with material
.
With above setting in machine no.1 we have achieved the gpss level of 195 to 198 gms.
The same setting we are insuring in machine no. 2 & 3 also and meanwhile we will work on m/c no. 1 to
increase the gpss level more than 210gms (as per customer expectation).
We request to procure U1USUDR 6/0 ring traveler for 32CH process, the same is available for 1
machine only hence we are unable to set the rest machines to the same productivity level as machine
no.1
We strongly suggest not to use non standardized bobbins in ring frame which is still running in the
machine. These bobbins are without bush and without any locking slot, this may damage the spindles
button, bobbin lifting during machine running is also common in these bobbins which may disturb the
doffer settings.
The list of FOC component is attached with this report we request the customer to send the defectives to
LMW.