8-44-6001 R-0 Clearances

You might also like

Download as pdf
Download as pdf
You are on page 1of 3
Lowe PIPING rECETS OVERHEAD CLEARANCES ~ EQUIPMENT, STRUCTURE, PLATFORMS, PIPING TO PROVIOE THE FOLLOWING CLEARANCES OVERHEAD Q.1TS SUPPORTS SHALL BE AR RANGED OVER RAIL ROADS, TOP OF RAIL TO GOTTOM OF ANY OBSTRUCTION. OVER PLANT ROADS FOR MAJOR MOBILE EQUIPHENT OVER SECONDARY ROADS (BOTTOM OF PIPE) AND ACCESS Ways FOR MOBILE EQUIPMENT. OVER GRAD.'& BOTTOM OF PIPE (WWSIOE BATTERY LIMIT ) ay pUNP ROW ACCESS WAY, ways; PASS-WAYS & PLATFORMS [0 NEAREST 2M OVER WALK ‘Ano WWSIOE BUILDING. 08 STRUCTION 13M over EXCHANGERS AT GRADE, SHELL COVER CHANNEL END HORIZONTAL CLEARA NCES BETWEEN EXCHANGERS (AISLES BETWEEN PIPING) 7 » oc! AROUND PUMPS c FIRED HEATERS 10 PUMPS HANDLING FLAMMAaLE STOCK FIRED HEATERS 1 OTHER FLAMMABLE CONTAINING EQUIPMENT NOT CLOSELY ASSOCIATED WITH HEATERS, AT ORIVER ENO OF PUMPS; WHERE TRUCK ACCESS Is REQUIRED. , ‘AT oRiven EO OF PUMPS WHERE TRUCK ACCESS IS NOT Lew REQUIRED. AT SHELL COVER ENO OF EXCHANGERS AT GRADE, FOR ACCESS WAY nae “2M BETWEEN SHELLS OF, ADJACENT HORIZONTAL VESSELS PIPE BERTHING unpgq ¢RouNo 300 mn MINIMUM CLEAR GAP GETWEEN PIPES. NoRMAL - FLANGE TO BARE PIPE (OR WWSULATION) PLUS 23 mm su tora ENGINEERING 57AND ARD B- 64-5001 INEERS INDIA LIMITED : NEW DELHI CLEARANCES EQUIPMENT SPACING SMALL PUMPS Gi7kw A LESS) MOUNTED ON COMMCN FCUNDATIONS. SUITABLE CENTRE TO CENTRE DISTANCE MIOIUM PUMPS 900 mm CLEAR AISLE (ZEW & LESS} . LARGER PUMPS 00 mm CLEAR AISLE (ABOVE 22.5KW) EXCHANGERS AND OTHER EQUIPMENT 300 mm MINIMUM CLEAR AISLE ON srRc runes, PLATEORMS :— wu HORIZONTAL VESSELS. TOWERS , VERTICAL & DISTANCE OF PLATFORM — BELOW —CENTRELINE OF 300-1050 MANHOLE FLANGE-SIDE PLATFORM, WIDTH OF MANHOLE PLATFORM FROM MANHOLE COVER'TO OUTSIDE EDGE OF PLATFORM. - Asad PLATFORM EXTENSION BEYOND CENTRE LINE OF MANHOLE - SIDE PLATFORM. . soo DISTANCE OF PLATFORM BELOW UNDER SIDE OF FLANGE - HEAD PLATFORM :1ns WIDTH OF PLATFORM FROM THREE SIDES OF MANHOLE ~ MEAD PLATFORM. 730 HORIZONTAL EXCHANGER: ; CLEARANCE FRONT CHANNEL OR BONNET + 100 FLANGE . HEAT EXCHANGER TUBE QUNOLE LENGTH +16 BUNDLE REMOVAL SPACE MIN CLEARANCE FROM EDGE OF FLANGES 300 VERTICAL EXCHANGER OISTANCE..OF PLATFORM BELOW TOP FLan: 1500 AANEL On BONNET SH.29F 3 ENGINEERING 3 :AMOARL | REV GINEERS INDIA ‘LIMITED: ® NEW DELHI CLEARANCES Eeeeaor weloare ATION “Tay [ewe] armors] Ne hazes|_1S3Ue0 aS STANOARO | hen] Qo Bm ASLG] lo EURNAC ES - WIDTH OF THE PLATFORM AT SIDE OF HORIZONTAL AND VERTICAL TUBE FURNACE +730 min WITDTH OF PLATEFORM AT ENDS OF HORIZON TAL TUBE FURNACES. + 1000 MIN. ENGINEERING STANOARD] REV 8-44-6001 NEERS INDIA LIMITED NEW DELHI CLEARANCES

You might also like