PIPING rECETS
OVERHEAD CLEARANCES ~
EQUIPMENT, STRUCTURE, PLATFORMS, PIPING
TO PROVIOE THE FOLLOWING CLEARANCES OVERHEAD
Q.1TS SUPPORTS SHALL BE AR RANGED
OVER RAIL ROADS, TOP OF RAIL TO GOTTOM OF ANY
OBSTRUCTION.
OVER PLANT ROADS FOR MAJOR MOBILE EQUIPHENT
OVER SECONDARY ROADS (BOTTOM OF PIPE) AND ACCESS
Ways FOR MOBILE EQUIPMENT.
OVER GRAD.'& BOTTOM OF PIPE (WWSIOE BATTERY LIMIT )
ay pUNP ROW ACCESS WAY,
ways; PASS-WAYS & PLATFORMS [0 NEAREST 2M
OVER WALK
‘Ano WWSIOE BUILDING.
08 STRUCTION
13M
over EXCHANGERS AT GRADE, SHELL COVER CHANNEL END
HORIZONTAL CLEARA NCES
BETWEEN EXCHANGERS (AISLES BETWEEN PIPING)
7 » oc!
AROUND PUMPS c
FIRED HEATERS 10 PUMPS HANDLING FLAMMAaLE STOCK
FIRED HEATERS 1 OTHER FLAMMABLE CONTAINING EQUIPMENT
NOT CLOSELY ASSOCIATED WITH HEATERS,
AT ORIVER ENO OF PUMPS; WHERE TRUCK ACCESS
Is REQUIRED. ,
‘AT oRiven EO OF PUMPS WHERE TRUCK ACCESS IS NOT Lew
REQUIRED.
AT SHELL COVER ENO OF EXCHANGERS AT GRADE, FOR ACCESS WAY nae
“2M
BETWEEN SHELLS OF, ADJACENT HORIZONTAL VESSELS
PIPE BERTHING
unpgq ¢RouNo 300 mn MINIMUM CLEAR GAP GETWEEN
PIPES.
NoRMAL - FLANGE TO BARE PIPE (OR
WWSULATION) PLUS 23 mm
su tora
ENGINEERING 57AND ARD
B- 64-5001
INEERS INDIA LIMITED
: NEW DELHI
CLEARANCESEQUIPMENT SPACING
SMALL PUMPS
Gi7kw A LESS)
MOUNTED ON COMMCN FCUNDATIONS.
SUITABLE CENTRE TO CENTRE DISTANCE
MIOIUM PUMPS 900 mm CLEAR AISLE
(ZEW & LESS} .
LARGER PUMPS 00 mm CLEAR AISLE
(ABOVE 22.5KW)
EXCHANGERS AND
OTHER EQUIPMENT 300 mm MINIMUM CLEAR AISLE
ON srRc runes,
PLATEORMS :—
wu
HORIZONTAL VESSELS.
TOWERS , VERTICAL &
DISTANCE OF PLATFORM — BELOW —CENTRELINE OF 300-1050
MANHOLE FLANGE-SIDE PLATFORM,
WIDTH OF MANHOLE PLATFORM FROM MANHOLE COVER'TO OUTSIDE
EDGE OF PLATFORM. - Asad
PLATFORM EXTENSION BEYOND CENTRE LINE OF MANHOLE -
SIDE PLATFORM. . soo
DISTANCE OF PLATFORM BELOW UNDER SIDE OF FLANGE -
HEAD PLATFORM :1ns
WIDTH OF PLATFORM FROM THREE SIDES OF MANHOLE ~
MEAD PLATFORM. 730
HORIZONTAL EXCHANGER: ;
CLEARANCE FRONT CHANNEL OR BONNET + 100
FLANGE .
HEAT EXCHANGER TUBE QUNOLE LENGTH +16
BUNDLE REMOVAL SPACE
MIN CLEARANCE FROM EDGE OF FLANGES 300
VERTICAL EXCHANGER
OISTANCE..OF PLATFORM BELOW TOP FLan: 1500
AANEL On BONNET
SH.29F 3
ENGINEERING 3 :AMOARL | REV
GINEERS INDIA ‘LIMITED: ®
NEW DELHI
CLEARANCES Eeeeaorweloare ATION “Tay [ewe] armors]
Ne hazes|_1S3Ue0 aS STANOARO | hen] Qo Bm ASLG]
lo
EURNAC ES -
WIDTH OF THE PLATFORM AT SIDE OF HORIZONTAL
AND VERTICAL TUBE FURNACE +730 min
WITDTH OF PLATEFORM AT ENDS OF HORIZON TAL
TUBE FURNACES. + 1000 MIN.
ENGINEERING STANOARD] REV
8-44-6001
NEERS INDIA LIMITED
NEW DELHI
CLEARANCES