LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/09/21 2079/09/21 2079/09/21
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 800.00 802.00 804.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.27 2.28
KN 27.00 28.00 30.00
Compressive Load
kg 2752.29 2854.23 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 57.10 61.18
Compressive Strength
2
N/mm 5.40 5.60 6.00
kg/cm2 57.78
Average
2
N/mm 5.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/10/12 2079/10/12 2079/10/12
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 817.00 815.00 820.00
Volume of Cubes cm3 353.39 353.39 353.39
3
Density gm/cm 2.31 2.31 2.32
KN 50.00 47.00 46.00
Compressive Load
kg 5096.84 4791.03 4689.09
Area of Cubes cm2 49.98 49.98 49.98
2
kg/cm 101.97 95.85 93.81
Compressive Strength
2
N/mm 10.00 9.40 9.20
kg/cm2 97.21
Average
N/mm2 9.54

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/09/21 2079/09/21 2079/09/21
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 792.00 793.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.24 2.24
KN 27.00 25.00 28.00
Compressive Load
kg 2752.29 2548.42 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 50.98 57.10
Compressive Strength
2
N/mm 5.40 5.00 5.60
kg/cm2 54.38
Average
2
N/mm 5.33

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/10/12 2079/10/12 2079/10/12
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 809.00 810.00 808.00
Volume of Cubes cm3 353.39 353.39 353.39
3
Density gm/cm 2.29 2.29 2.29
KN 48.00 48.00 45.00
Compressive Load
kg 4892.97 4892.97 4587.16
Area of Cubes cm2 49.98 49.98 49.98
2
kg/cm 97.89 97.89 91.77
Compressive Strength
2
N/mm 9.60 9.60 9.00
kg/cm2 95.85
Average
N/mm2 9.40

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/09/21 2079/09/21 2079/09/21
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 794.00 795.00 792.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.25 2.24
KN 35.00 35.00 33.00
Compressive Load
kg 3567.79 3567.79 3363.91
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 71.38 71.38 67.30
Compressive Strength
2
N/mm 7.00 7.00 6.60
kg/cm2 70.02
Average
2
N/mm 6.87

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/10/12 2079/10/12 2079/10/12
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 810.00 808.00 809.00
Volume of Cubes cm3 353.39 353.39 353.39
3
Density gm/cm 2.29 2.29 2.29
KN 48.00 50.00 49.00
Compressive Load
kg 4892.97 5096.84 4994.90
Area of Cubes cm2 49.98 49.98 49.98
2
kg/cm 97.89 101.97 99.93
Compressive Strength
2
N/mm 9.60 10.00 9.80
kg/cm2 99.93
Average
N/mm2 9.80

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/09/21 2079/09/21 2079/09/21
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 798.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.25
KN 28.00 27.00 25.00
Compressive Load
kg 2854.23 2752.29 2548.42
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 55.06 50.98
Compressive Strength
2
N/mm 5.60 5.40 5.00
kg/cm2 54.38
Average
2
N/mm 5.33

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/10/12 2079/10/12 2079/10/12
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 813.00 812.00 814.00
Volume of Cubes cm3 353.39 353.39 353.39
3
Density gm/cm 2.30 2.30 2.30
KN 48.00 50.00 49.00
Compressive Load
kg 4892.97 5096.84 4994.90
Area of Cubes cm2 49.98 49.98 49.98
2
kg/cm 97.89 101.97 99.93
Compressive Strength
2
N/mm 9.60 10.00 9.80
kg/cm2 99.93
Average
N/mm2 9.80

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/09/21 2079/09/21 2079/09/21
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 796.00 792.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.24 2.25
KN 35.00 34.00 31.00
Compressive Load
kg 3567.79 3465.85 3160.04
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 71.38 69.34 63.22
Compressive Strength
2
N/mm 7.00 6.80 6.20
kg/cm2 67.98
Average
2
N/mm 6.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/10/12 2079/10/12 2079/10/12
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 809.00 805.00 805.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.29 2.28 2.28
KN 49.00 46.00 47.00
Compressive Load
kg 4994.90 4689.09 4791.03
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 99.93 93.81 95.85
Compressive Strength
2
N/mm 9.80 9.20 9.40
kg/cm2 96.53
Average
2
N/mm 9.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/09/21 2079/09/21 2079/09/21
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 792.00 798.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.26 2.26
KN 34.00 33.00 33.00
Compressive Load
kg 3465.85 3363.91 3363.91
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 69.34 67.30 67.30
Compressive Strength
2
N/mm 6.80 6.60 6.60
kg/cm2 67.98
Average
2
N/mm 6.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/14 2079/09/14 2079/09/14
Date of Testing 2079/10/12 2079/10/12 2079/10/12
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 790.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.24 2.25
KN 46.00 50.00 44.00
Compressive Load
kg 4689.09 5096.84 4485.22
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 93.81 101.97 89.73
Compressive Strength
2
N/mm 9.20 10.00 8.80
kg/cm2 95.17
Average
2
N/mm 9.34
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 796.00 798.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.26
KN 27.00 28.00 28.00
Compressive Load
kg 2752.29 2854.23 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 57.10 57.10
Compressive Strength
2
N/mm 5.40 5.60 5.60
kg/cm2 56.42
Average
2
N/mm 5.54

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/05/13 2079/05/13 2079/05/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 808.00 808.00 806.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.29 2.29 2.28
KN 48.00 48.00 46.00
Compressive Load
kg 4892.97 4892.97 4689.09
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 97.89 97.89 93.81
Compressive Strength
2
N/mm 9.60 9.60 9.20
kg/cm2 96.53
Average
2
N/mm 9.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 787.00 793.00 794.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.23 2.24 2.25
KN 24.00 28.00 28.00
Compressive Load
kg 2446.48 2854.23 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 48.94 57.10 57.10
Compressive Strength
2
N/mm 4.80 5.60 5.60
kg/cm2 54.38
Average
2
N/mm 5.33

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/05/13 2079/05/13 2079/05/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 796.00 795.00 794.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.25 2.25
KN 50.00 44.00 49.00
Compressive Load
kg 5096.84 4485.22 4994.90
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 101.97 89.73 99.93
Compressive Strength
2
N/mm 10.00 8.80 9.80
kg/cm2 97.21
Average
2
N/mm 9.54
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 802.00 800.00 805.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.26 2.28
KN 30.00 29.00 32.00
Compressive Load
kg 3058.10 2956.17 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 59.14 65.26
Compressive Strength
2
N/mm 6.00 5.80 6.40
kg/cm2 61.86
Average
2
N/mm 6.07

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/10/13 2079/10/13 2079/10/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 810.00 812.00 810.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.29 2.30 2.29
KN 48.00 49.00 48.00
Compressive Load
kg 4892.97 4994.90 4892.97
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 97.89 99.93 97.89
Compressive Strength
2
N/mm 9.60 9.80 9.60
kg/cm2 98.57
Average
2
N/mm 9.67
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 789.00 792.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.23 2.24 2.25
KN 29.00 30.00 31.00
Compressive Load
kg 2956.17 3058.10 3160.04
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 59.14 61.18 63.22
Compressive Strength
2
N/mm 5.80 6.00 6.20
kg/cm2 61.18
Average
2
N/mm 6.00

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/10/13 2079/10/13 2079/10/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 800.00 801.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.27 2.26
KN 47.00 48.00 45.00
Compressive Load
kg 4791.03 4892.97 4587.16
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 95.85 97.89 91.77
Compressive Strength
2
N/mm 9.40 9.60 9.00
kg/cm2 95.17
Average
2
N/mm 9.34
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 787.00 782.00 790.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.23 2.21 2.24
KN 27.00 29.00 30.00
Compressive Load
kg 2752.29 2956.17 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 59.14 61.18
Compressive Strength
2
N/mm 5.40 5.80 6.00
kg/cm2 58.46
Average
2
N/mm 5.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/10/13 2079/10/13 2079/10/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 785.00 790.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.22 2.24
KN 48.00 52.00 49.00
Compressive Load
kg 4892.97 5300.71 4994.90
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 97.89 106.05 99.93
Compressive Strength
2
N/mm 9.60 10.40 9.80
kg/cm2 101.29
Average
2
N/mm 9.94
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 796.00 792.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.25 2.24
KN 27.00 31.00 30.00
Compressive Load
kg 2752.29 3160.04 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 63.22 61.18
Compressive Strength
2
N/mm 5.40 6.20 6.00
kg/cm2 59.82
Average
2
N/mm 5.87

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/10/13 2079/10/13 2079/10/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 780.00 785.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.22 2.23
KN 46.00 54.00 46.00
Compressive Load
kg 4689.09 5504.59 4689.09
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 93.81 110.13 93.81
Compressive Strength
2
N/mm 9.20 10.80 9.20
kg/cm2 99.25
Average
2
N/mm 9.74
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 805.00 801.00 797.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.28 2.27 2.26
KN 30.00 25.00 30.00
Compressive Load
kg 3058.10 2548.42 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 50.98 61.18
Compressive Strength
2
N/mm 6.00 5.00 6.00
kg/cm2 57.78
Average
2
N/mm 5.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/10/13 2079/10/13 2079/10/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 805.00 815.00 812.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.28 2.31 2.30
KN 42.00 48.00 42.00
Compressive Load
kg 4281.35 4892.97 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 85.65 97.89 85.65
Compressive Strength
2
N/mm 8.40 9.60 8.40
kg/cm2 89.73
Average
2
N/mm 8.80
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/09/22 2079/09/22 2079/09/22
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 792.00 788.00 800.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.23 2.26
KN 28.00 30.00 26.00
Compressive Load
kg 2854.23 3058.10 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 61.18 53.02
Compressive Strength
2
N/mm 5.60 6.00 5.20
kg/cm2 57.10
Average
2
N/mm 5.60

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+680
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/15 2079/09/15 2079/09/15
Date of Testing 2079/10/13 2079/10/13 2079/10/13
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 785.00 801.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.22 2.27 2.25
KN 45.00 48.00 40.00
Compressive Load
kg 4587.16 4892.97 4077.47
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 97.89 81.57
Compressive Strength
2
N/mm 9.00 9.60 8.00
kg/cm2 90.41
Average
2
N/mm 8.87
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 800.00 796.00 791.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.25 2.24
KN 30.00 28.00 28.00
Compressive Load
kg 3058.10 2854.23 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 57.10 57.10
Compressive Strength
2
N/mm 6.00 5.60 5.60
kg/cm2 58.46
Average
2
N/mm 5.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 807.00 802.00 805.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.28 2.27 2.28
KN 45.00 40.00 42.00
Compressive Load
kg 4587.16 4077.47 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 81.57 85.65
Compressive Strength
2
N/mm 9.00 8.00 8.40
kg/cm2 86.33
Average
2
N/mm 8.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 780.00 795.00 784.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.25 2.22
KN 26.00 30.00 32.00
Compressive Load
kg 2650.36 3058.10 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 53.02 61.18 65.26
Compressive Strength
2
N/mm 5.20 6.00 6.40
kg/cm2 59.82
Average
2
N/mm 5.87

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 785.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.22 2.23
KN 40.00 42.00 50.00
Compressive Load
kg 4077.47 4281.35 5096.84
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 81.57 85.65 101.97
Compressive Strength
2
N/mm 8.00 8.40 10.00
kg/cm2 89.73
Average
2
N/mm 8.80
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 794.00 798.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.23
KN 34.00 36.00 32.00
Compressive Load
kg 3465.85 3669.72 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 69.34 73.42 65.26
Compressive Strength
2
N/mm 6.80 7.20 6.40
kg/cm2 69.34
Average
2
N/mm 6.80

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 803.00 800.00 806.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.26 2.28
KN 50.00 46.00 48.00
Compressive Load
kg 5096.84 4689.09 4892.97
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 101.97 93.81 97.89
Compressive Strength
2
N/mm 10.00 9.20 9.60
kg/cm2 97.89
Average
2
N/mm 9.60
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 778.00 785.00 790.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.20 2.22 2.24
KN 25.00 29.00 27.00
Compressive Load
kg 2548.42 2956.17 2752.29
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 50.98 59.14 55.06
Compressive Strength
2
N/mm 5.00 5.80 5.40
kg/cm2 55.06
Average
2
N/mm 5.40

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 805.00 795.00 802.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.28 2.25 2.27
KN 42.00 44.00 42.00
Compressive Load
kg 4281.35 4485.22 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 85.65 89.73 85.65
Compressive Strength
2
N/mm 8.40 8.80 8.40
kg/cm2 87.01
Average
2
N/mm 8.54
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 805.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.28 2.26
KN 35.00 30.00 32.00
Compressive Load
kg 3567.79 3058.10 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 71.38 61.18 65.26
Compressive Strength
2
N/mm 7.00 6.00 6.40
kg/cm2 65.94
Average
2
N/mm 6.47

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 810.00 805.00 809.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.29 2.28 2.29
KN 45.00 42.00 45.00
Compressive Load
kg 4587.16 4281.35 4587.16
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 85.65 91.77
Compressive Strength
2
N/mm 9.00 8.40 9.00
kg/cm2 89.73
Average
2
N/mm 8.80
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 780.00 795.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.25 2.23
KN 28.00 30.00 25.00
Compressive Load
kg 2854.23 3058.10 2548.42
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 61.18 50.98
Compressive Strength
2
N/mm 5.60 6.00 5.00
kg/cm2 56.42
Average
2
N/mm 5.54

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 788.00 780.00 784.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.23 2.21 2.22
KN 45.00 42.00 40.00
Compressive Load
kg 4587.16 4281.35 4077.47
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 85.65 81.57
Compressive Strength
2
N/mm 9.00 8.40 8.00
kg/cm2 86.33
Average
2
N/mm 8.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 805.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.28 2.26
KN 30.00 35.00 30.00
Compressive Load
kg 3058.10 3567.79 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 71.38 61.18
Compressive Strength
2
N/mm 6.00 7.00 6.00
kg/cm2 64.58
Average
2
N/mm 6.34

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 791.00 780.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.24 2.21
KN 50.00 48.00 48.00
Compressive Load
kg 5096.84 4892.97 4892.97
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 101.97 97.89 97.89
Compressive Strength
2
N/mm 10.00 9.60 9.60
kg/cm2 99.25
Average
2
N/mm 9.74
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/09/24 2079/09/24 2079/09/24
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 785.00 796.00 784.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.22 2.25 2.22
KN 33.00 29.00 27.00
Compressive Load
kg 3363.91 2956.17 2752.29
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 67.30 59.14 55.06
Compressive Strength
2
N/mm 6.60 5.80 5.40
kg/cm2 60.50
Average
2
N/mm 5.94

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/17 2079/09/17 2079/09/17
Date of Testing 2079/10/15 2079/10/15 2079/10/15
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 802.00 790.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.27 2.24
KN 45.00 44.00 42.00
Compressive Load
kg 4587.16 4485.22 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 89.73 85.65
Compressive Strength
2
N/mm 9.00 8.80 8.40
kg/cm2 89.05
Average
2
N/mm 8.74
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+820 to 0+860
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/18 2079/09/18 2079/09/18
Date of Testing 2079/09/25 2079/09/25 2079/09/25
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 798.00 800.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.26
KN 32.00 35.00 30.00
Compressive Load
kg 3261.98 3567.79 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 65.26 71.38 61.18
Compressive Strength
2
N/mm 6.40 7.00 6.00
kg/cm2 65.94
Average
2
N/mm 6.47

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+820 to 0+860
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/18 2079/09/18 2079/09/18
Date of Testing 2079/10/16 2079/10/16 2079/10/16
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 802.00 800.00 805.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.26 2.28
KN 52.00 55.00 50.00
Compressive Load
kg 5300.71 5606.52 5096.84
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 106.05 112.16 101.97
Compressive Strength
2
N/mm 10.40 11.00 10.00
kg/cm2 106.73
Average
2
N/mm 10.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+820 to 0+860
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/18 2079/09/18 2079/09/18
Date of Testing 2079/09/25 2079/09/25 2079/09/25
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 782.00 794.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.25 2.26
KN 30.00 25.00 32.00
Compressive Load
kg 3058.10 2548.42 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 50.98 65.26
Compressive Strength
2
N/mm 6.00 5.00 6.40
kg/cm2 59.14
Average
2
N/mm 5.80

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 0+820 to 0+860
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/18 2079/09/18 2079/09/18
Date of Testing 2079/10/16 2079/10/16 2079/10/16
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 785.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.22 2.23
KN 45.00 42.00 50.00
Compressive Load
kg 4587.16 4281.35 5096.84
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 85.65 101.97
Compressive Strength
2
N/mm 9.00 8.40 10.00
kg/cm2 93.13
Average
2
N/mm 9.14
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/18 2079/09/18 2079/09/18
Date of Testing 2079/09/25 2079/09/25 2079/09/25
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 782.00 790.00 785.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.24 2.22
KN 30.00 26.00 30.00
Compressive Load
kg 3058.10 2650.36 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 53.02 61.18
Compressive Strength
2
N/mm 6.00 5.20 6.00
kg/cm2 58.46
Average
2
N/mm 5.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+437
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/18 2079/09/18 2079/09/18
Date of Testing 2079/10/16 2079/10/16 2079/10/16
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 798.00 791.00 784.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.24 2.22
KN 42.00 45.00 40.00
Compressive Load
kg 4281.35 4587.16 4077.47
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 85.65 91.77 81.57
Compressive Strength
2
N/mm 8.40 9.00 8.00
kg/cm2 86.33
Average
2
N/mm 8.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/09/26 2079/09/26 2079/09/26
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 898.00 891.00 895.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.54 2.52 2.53
KN 28.00 30.00 32.00
Compressive Load
kg 2854.23 3058.10 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 61.18 65.26
Compressive Strength
2
N/mm 5.60 6.00 6.40
kg/cm2 61.18
Average
2
N/mm 6.00

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/10/17 2079/10/17 2079/10/17
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 788.00 795.00 7965.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.23 2.25 22.54
KN 42.00 44.00 48.00
Compressive Load
kg 4281.35 4485.22 4892.97
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 85.65 89.73 97.89
Compressive Strength
N/mm2 8.40 8.80 9.60
kg/cm2 91.09
Average
N/mm2 8.94

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/09/26 2079/09/26 2079/09/26
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 785.00 791.00 796.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.22 2.24 2.25
KN 26.00 25.00 28.00
Compressive Load
kg 2650.36 2548.42 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 53.02 50.98 57.10
Compressive Strength
2
N/mm 5.20 5.00 5.60
kg/cm2 53.70
Average
2
N/mm 5.27

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/10/17 2079/10/17 2079/10/17
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 805.00 785.00 792.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.28 2.22 2.24
KN 38.00 45.00 42.00
Compressive Load
kg 3873.60 4587.16 4281.35
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 77.50 91.77 85.65
Compressive Strength
N/mm2 7.60 9.00 8.40
kg/cm2 84.97
Average
N/mm2 8.34

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/09/26 2079/09/26 2079/09/26
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 785.00 800.00 792.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.22 2.26 2.24
KN 30.00 32.00 27.00
Compressive Load
kg 3058.10 3261.98 2752.29
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 65.26 55.06
Compressive Strength
2
N/mm 6.00 6.40 5.40
kg/cm2 60.50
Average
2
N/mm 5.94

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/10/17 2079/10/17 2079/10/17
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 791.00 798.00 797.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.24 2.26 2.26
KN 46.00 40.00 45.00
Compressive Load
kg 4689.09 4077.47 4587.16
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 93.81 81.57 91.77
Compressive Strength
N/mm2 9.20 8.00 9.00
kg/cm2 89.05
Average
N/mm2 8.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/09/26 2079/09/26 2079/09/26
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 791.00 786.00 785.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.22 2.22
KN 28.00 31.00 26.00
Compressive Load
kg 2854.23 3160.04 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 63.22 53.02
Compressive Strength
2
N/mm 5.60 6.20 5.20
kg/cm2 57.78
Average
2
N/mm 5.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/19 2079/09/19 2079/09/19
Date of Testing 2079/10/17 2079/10/17 2079/10/17
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 785.00 780.00 785.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.22 2.21 2.22
KN 40.00 45.00 40.00
Compressive Load
kg 4077.47 4587.16 4077.47
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 81.57 91.77 81.57
Compressive Strength
N/mm2 8.00 9.00 8.00
kg/cm2 84.97
Average
N/mm2 8.34

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/09/27 2079/09/27 2079/09/27
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 798.00 792.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.26 2.24
KN 32.00 27.00 30.00
Compressive Load
kg 3261.98 2752.29 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 65.26 55.06 61.18
Compressive Strength
2
N/mm 6.40 5.40 6.00
kg/cm2 60.50
Average
2
N/mm 5.94

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/10/18 2079/10/18 2079/10/18
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 788.00 785.00 801.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.23 2.22 2.27
KN 45.00 40.00 42.00
Compressive Load
kg 4587.16 4077.47 4281.35
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 91.77 81.57 85.65
Compressive Strength
N/mm2 9.00 8.00 8.40
kg/cm2 86.33
Average
N/mm2 8.47

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/09/27 2079/09/27 2079/09/27
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 785.00 781.00 784.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.22 2.21 2.22
KN 27.00 32.00 26.00
Compressive Load
kg 2752.29 3261.98 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 65.26 53.02
Compressive Strength
2
N/mm 5.40 6.40 5.20
kg/cm2 57.78
Average
2
N/mm 5.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/10/18 2079/10/18 2079/10/18
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 780.00 784.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.25 2.21 2.22
KN 40.00 40.00 44.00
Compressive Load
kg 4077.47 4077.47 4485.22
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 81.57 81.57 89.73
Compressive Strength
N/mm2 8.00 8.00 8.80
kg/cm2 84.29
Average
N/mm2 8.27

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/09/27 2079/09/27 2079/09/27
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 792.00 785.00 780.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.22 2.21
KN 34.00 26.00 29.00
Compressive Load
kg 3465.85 2650.36 2956.17
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 69.34 53.02 59.14
Compressive Strength
2
N/mm 6.80 5.20 5.80
kg/cm2 60.50
Average
2
N/mm 5.94

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/10/18 2079/10/18 2079/10/18
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 798.00 805.00 795.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.26 2.28 2.25
KN 40.00 42.00 45.00
Compressive Load
kg 4077.47 4281.35 4587.16
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 81.57 85.65 91.77
Compressive Strength
N/mm2 8.00 8.40 9.00
kg/cm2 86.33
Average
N/mm2 8.47

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/09/27 2079/09/27 2079/09/27
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 784.00 792.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.22 2.24
KN 30.00 35.00 28.00
Compressive Load
kg 3058.10 3567.79 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 71.38 57.10
Compressive Strength
2
N/mm 6.00 7.00 5.60
kg/cm2 63.22
Average
2
N/mm 6.20

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/20 2079/09/20 2079/09/20
Date of Testing 2079/10/18 2079/10/18 2079/10/18
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 788.00 782.00 800.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.23 2.21 2.26
KN 42.00 38.00 50.00
Compressive Load
kg 4281.35 3873.60 5096.84
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 85.65 77.50 101.97
Compressive Strength
N/mm2 8.40 7.60 10.00
kg/cm2 88.37
Average
N/mm2 8.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+660
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/21 2079/09/21 2079/09/21
Date of Testing 2079/09/28 2079/09/28 2079/09/28
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 790.00 785.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.22 2.25
KN 33.00 28.00 25.00
Compressive Load
kg 3363.91 2854.23 2548.42
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 67.30 57.10 50.98
Compressive Strength
2
N/mm 6.60 5.60 5.00
kg/cm2 58.46
Average
2
N/mm 5.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+660
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/21 2079/09/21 2079/09/21
Date of Testing 2079/10/19 2079/10/19 2079/10/19
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 805.00 807.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.27 2.28 2.28
KN 40.00 42.00 44.00
Compressive Load
kg 4077.47 4281.35 4485.22
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 81.57 85.65 89.73
Compressive Strength
N/mm2 8.00 8.40 8.80
kg/cm2 85.65
Average
N/mm2 8.40

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+900
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/22 2079/09/22 2079/09/22
Date of Testing 2079/09/29 2079/09/29 2079/09/29
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 780.00 788.00 786.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.23 2.22
KN 26.00 28.00 26.00
Compressive Load
kg 2650.36 2854.23 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 53.02 57.10 53.02
Compressive Strength
2
N/mm 5.20 5.60 5.20
kg/cm2 54.38
Average
2
N/mm 5.33

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+900
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/22 2079/09/22 2079/09/22
Date of Testing 2079/10/20 2079/10/20 2079/10/20
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 795.00 800.00
3
Volume of Cubes cm 353.39 353.39 353.39
Density gm/cm3 2.27 2.25 2.26
KN 42.00 41.00 46.00
Compressive Load
kg 4281.35 4179.41 4689.09
2
Area of Cubes cm 49.98 49.98 49.98
kg/cm2 85.65 83.61 93.81
Compressive Strength
N/mm2 8.40 8.20 9.20
kg/cm2 87.69
Average
N/mm2 8.60

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+900
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/22 2079/09/22 2079/09/22
Date of Testing 2079/09/29 2079/09/29 2079/09/29
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 802.00 798.00 794.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.26 2.25
KN 30.00 25.00 28.00
Compressive Load
kg 3058.10 2548.42 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 50.98 57.10
Compressive Strength
2
N/mm 6.00 5.00 5.60
kg/cm2 56.42
Average
2
N/mm 5.54

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+900
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/22 2079/09/22 2079/09/22
Date of Testing 2079/10/20 2079/10/20 2079/10/20
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 798.00 795.00 791.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.25 2.24
KN 40.00 42.00 40.00
Compressive Load
kg 4077.47 4281.35 4077.47
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 81.57 85.65 81.57
Compressive Strength
2
N/mm 8.00 8.40 8.00
kg/cm2 82.93
Average
2
N/mm 8.14
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+900
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/22 2079/09/22 2079/09/22
Date of Testing 2079/09/29 2079/09/29 2079/09/29
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 795.00 797.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.25 2.26
KN 30.00 26.00 30.00
Compressive Load
kg 3058.10 2650.36 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 53.02 61.18
Compressive Strength
2
N/mm 6.00 5.20 6.00
kg/cm2 58.46
Average
2
N/mm 5.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 1+900
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/22 2079/09/22 2079/09/22
Date of Testing 2079/10/20 2079/10/20 2079/10/20
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 780.00 784.00 790.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.22 2.24
KN 38.00 50.00 44.00
Compressive Load
kg 3873.60 5096.84 4485.22
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 77.50 101.97 89.73
Compressive Strength
2
N/mm 7.60 10.00 8.80
kg/cm2 89.73
Average
2
N/mm 8.80
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/01 2079/10/01 2079/10/01
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 781.00 795.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.21 2.25 2.23
KN 25.00 28.00 32.00
Compressive Load
kg 2548.42 2854.23 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 50.98 57.10 65.26
Compressive Strength
2
N/mm 5.00 5.60 6.40
kg/cm2 57.78
Average
2
N/mm 5.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/22 2079/10/22 2079/10/22
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 805.00 807.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.28 2.28
KN 40.00 42.00 44.00
Compressive Load
kg 4077.47 4281.35 4485.22
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 81.57 85.65 89.73
Compressive Strength
2
N/mm 8.00 8.40 8.80
kg/cm2 85.65
Average
2
N/mm 8.40
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/01 2079/10/01 2079/10/01
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 792.00 785.00 791.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.22 2.24
KN 27.00 34.00 31.00
Compressive Load
kg 2752.29 3465.85 3160.04
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 69.34 63.22
Compressive Strength
2
N/mm 5.40 6.80 6.20
kg/cm2 62.54
Average
2
N/mm 6.14

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/22 2079/10/22 2079/10/22
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 790.00 788.00 785.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.23 2.22
KN 44.00 50.00 48.00
Compressive Load
kg 4485.22 5096.84 4892.97
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 89.73 101.97 97.89
Compressive Strength
2
N/mm 8.80 10.00 9.60
kg/cm2 96.53
Average
2
N/mm 9.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/01 2079/10/01 2079/10/01
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 796.00 798.00 785.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.22
KN 30.00 28.00 26.00
Compressive Load
kg 3058.10 2854.23 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 57.10 53.02
Compressive Strength
2
N/mm 6.00 5.60 5.20
kg/cm2 57.10
Average
2
N/mm 5.60

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/22 2079/10/22 2079/10/22
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 805.00 807.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.28 2.28
KN 45.00 40.00 45.00
Compressive Load
kg 4587.16 4077.47 4587.16
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 81.57 91.77
Compressive Strength
2
N/mm 9.00 8.00 9.00
kg/cm2 88.37
Average
2
N/mm 8.67
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/01 2079/10/01 2079/10/01
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 793.00 800.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.26 2.23
KN 27.00 28.00 25.00
Compressive Load
kg 2752.29 2854.23 2548.42
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 55.06 57.10 50.98
Compressive Strength
2
N/mm 5.40 5.60 5.00
kg/cm2 54.38
Average
2
N/mm 5.33

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/22 2079/10/22 2079/10/22
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 798.00 787.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.23
KN 42.00 40.00 42.00
Compressive Load
kg 4281.35 4077.47 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 85.65 81.57 85.65
Compressive Strength
2
N/mm 8.40 8.00 8.40
kg/cm2 84.29
Average
2
N/mm 8.27
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/01 2079/10/01 2079/10/01
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 791.00 795.00 788.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.25 2.23
KN 28.00 32.00 25.00
Compressive Load
kg 2854.23 3261.98 2548.42
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 65.26 50.98
Compressive Strength
2
N/mm 5.60 6.40 5.00
kg/cm2 57.78
Average
2
N/mm 5.67

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/24 2079/09/24 2079/09/24
Date of Testing 2079/10/22 2079/10/22 2079/10/22
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 799.00 795.00 801.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.25 2.27
KN 44.00 42.00 46.00
Compressive Load
kg 4485.22 4281.35 4689.09
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 89.73 85.65 93.81
Compressive Strength
2
N/mm 8.80 8.40 9.20
kg/cm2 89.73
Average
2
N/mm 8.80
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/02 2079/10/02 2079/10/02
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 790.00 794.00 796.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.25 2.25
KN 28.00 30.00 26.00
Compressive Load
kg 2854.23 3058.10 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 57.10 61.18 53.02
Compressive Strength
2
N/mm 5.60 6.00 5.20
kg/cm2 57.10
Average
2
N/mm 5.60

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/23 2079/10/23 2079/10/23
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 796.00 800.00 805.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.28
KN 40.00 45.00 42.00
Compressive Load
kg 4077.47 4587.16 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 81.57 91.77 85.65
Compressive Strength
2
N/mm 8.00 9.00 8.40
kg/cm2 86.33
Average
2
N/mm 8.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/02 2079/10/02 2079/10/02
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 798.00 792.00 795.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.24 2.25
KN 30.00 26.00 28.00
Compressive Load
kg 3058.10 2650.36 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 53.02 57.10
Compressive Strength
2
N/mm 6.00 5.20 5.60
kg/cm2 57.10
Average
2
N/mm 5.60

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/23 2079/10/23 2079/10/23
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 805.00 798.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.28 2.26
KN 45.00 38.00 44.00
Compressive Load
kg 4587.16 3873.60 4485.22
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 77.50 89.73
Compressive Strength
2
N/mm 9.00 7.60 8.80
kg/cm2 86.33
Average
2
N/mm 8.47
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/02 2079/10/02 2079/10/02
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 788.00 795.00 794.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.23 2.25 2.25
KN 32.00 25.00 26.00
Compressive Load
kg 3261.98 2548.42 2650.36
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 65.26 50.98 53.02
Compressive Strength
2
N/mm 6.40 5.00 5.20
kg/cm2 56.42
Average
2
N/mm 5.54

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+126
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/23 2079/10/23 2079/10/23
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 799.00 802.00 804.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.27 2.28
KN 40.00 40.00 42.00
Compressive Load
kg 4077.47 4077.47 4281.35
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 81.57 81.57 85.65
Compressive Strength
2
N/mm 8.00 8.00 8.40
kg/cm2 82.93
Average
2
N/mm 8.14
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/02 2079/10/02 2079/10/02
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 790.00 795.00 792.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.25 2.24
KN 30.00 32.00 30.00
Compressive Load
kg 3058.10 3261.98 3058.10
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 65.26 61.18
Compressive Strength
2
N/mm 6.00 6.40 6.00
kg/cm2 62.54
Average
2
N/mm 6.14

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/23 2079/10/23 2079/10/23
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 799.00 805.00 802.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.28 2.27
KN 48.00 46.00 44.00
Compressive Load
kg 4892.97 4689.09 4485.22
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 97.89 93.81 89.73
Compressive Strength
2
N/mm 9.60 9.20 8.80
kg/cm2 93.81
Average
2
N/mm 9.20
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/02 2079/10/02 2079/10/02
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 798.00 800.00 796.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.26 2.25
KN 30.00 28.00 28.00
Compressive Load
kg 3058.10 2854.23 2854.23
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 57.10 57.10
Compressive Strength
2
N/mm 6.00 5.60 5.60
kg/cm2 58.46
Average
2
N/mm 5.74

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/25 2079/09/25 2079/09/25
Date of Testing 2079/10/23 2079/10/23 2079/10/23
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 801.00 800.00 805.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.26 2.28
KN 42.00 45.00 44.00
Compressive Load
kg 4281.35 4587.16 4485.22
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 85.65 91.77 89.73
Compressive Strength
2
N/mm 8.40 9.00 8.80
kg/cm2 89.05
Average
2
N/mm 8.74
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/03 2079/10/03 2079/10/03
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 805.00 794.00 794.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.28 2.25 2.25
KN 29.00 30.00 31.00
Compressive Load
kg 2956.17 3058.10 3160.04
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 59.14 61.18 63.22
Compressive Strength
2
N/mm 5.80 6.00 6.20
kg/cm2 61.18
Average
2
N/mm 6.00

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/24 2079/10/24 2079/10/24
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 800.00 802.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.27
KN 49.00 50.00 48.00
Compressive Load
kg 4994.90 5096.84 4892.97
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 99.93 101.97 97.89
Compressive Strength
2
N/mm 9.80 10.00 9.60
kg/cm2 99.93
Average
2
N/mm 9.80
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/03 2079/10/03 2079/10/03
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 793.00 796.00 800.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.24 2.25 2.26
KN 31.00 29.00 32.00
Compressive Load
kg 3160.04 2956.17 3261.98
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 63.22 59.14 65.26
Compressive Strength
2
N/mm 6.20 5.80 6.40
kg/cm2 62.54
Average
2
N/mm 6.14

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+200
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/24 2079/10/24 2079/10/24
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 796.00 799.00 802.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.27
KN 43.00 45.00 47.00
Compressive Load
kg 4383.28 4587.16 4791.03
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 87.69 91.77 95.85
Compressive Strength
2
N/mm 8.60 9.00 9.40
kg/cm2 91.77
Average
2
N/mm 9.00
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/03 2079/10/03 2079/10/03
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 803.00 801.00 799.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.27 2.27 2.26
KN 29.00 32.00 31.00
Compressive Load
kg 2956.17 3261.98 3160.04
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 59.14 65.26 63.22
Compressive Strength
2
N/mm 5.80 6.40 6.20
kg/cm2 62.54
Average
2
N/mm 6.14

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/24 2079/10/24 2079/10/24
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 798.00 799.00 806.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.26 2.28
KN 45.00 49.00 52.00
Compressive Load
kg 4587.16 4994.90 5300.71
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 91.77 99.93 106.05
Compressive Strength
2
N/mm 9.00 9.80 10.40
kg/cm2 99.25
Average
2
N/mm 9.74
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/03 2079/10/03 2079/10/03
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 799.00 802.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.26 2.27
KN 30.00 32.00 31.00
Compressive Load
kg 3058.10 3261.98 3160.04
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 61.18 65.26 63.22
Compressive Strength
2
N/mm 6.00 6.40 6.20
kg/cm2 63.22
Average
2
N/mm 6.20

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/24 2079/10/24 2079/10/24
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 797.00 798.00 802.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.26 2.26 2.27
KN 49.00 48.00 49.00
Compressive Load
kg 4994.90 4892.97 4994.90
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 99.93 97.89 99.93
Compressive Strength
2
N/mm 9.80 9.60 9.80
kg/cm2 99.25
Average
2
N/mm 9.74
Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 1 2 3


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/03 2079/10/03 2079/10/03
Age of Cubes days 7 7 7
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 795.00 805.00 800.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.25 2.28 2.26
KN 32.00 31.00 29.00
Compressive Load
kg 3261.98 3160.04 2956.17
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 65.26 63.22 59.14
Compressive Strength
2
N/mm 6.40 6.20 5.80
kg/cm2 62.54
Average
2
N/mm 6.14

Remarks: Sample were provided by contractor

Tested by: Checked by:


Viswa Consult Pvt. Ltd.
P.O. Box 4316
Dillibazar, Kathmandu
Tel.No.: 4433359, 4433156 Fax: 977-1-4433156
Email: viswa@wlink.com.np; viswaconsult@gmail.com

LAB UNIT

CUBE TEST FOR CEMENT MORTAR


Project: Bhumichuli Budhakhani Tinkhutte Road
Client: Infrastructure Development Office, Dhulikhel, Kavreplanchowk
Contractor: Radha Krishna and Brothers Construction Pvt. Ltd.
Contract No:IDOKAVRE/NCB/W/73/077/078
Sand: Supreme Stone Pvt. Ltd. Chainage: 2+540
Cement: Jagdamba Ultra OPC Mix Ratio: 1:4 (Stone Masonry)

Mortar Cube No. 4 5 6


Date of Casting 2079/09/26 2079/09/26 2079/09/26
Date of Testing 2079/10/24 2079/10/24 2079/10/24
Age of Cubes days 28 28 28
Length of Cube cm 7.07 7.07 7.07
Breadth of Cube cm 7.07 7.07 7.07
Height of Cube cm 7.07 7.07 7.07
Weight of Cubes gm 805.00 802.00 803.00
Volume of Cubes cm3 353.39 353.39 353.39
Density gm/cm3 2.28 2.27 2.27
KN 49.00 50.00 52.00
Compressive Load
kg 4994.90 5096.84 5300.71
Area of Cubes cm2 49.98 49.98 49.98
kg/cm2 99.93 101.97 106.05
Compressive Strength
2
N/mm 9.80 10.00 10.40
kg/cm2 102.65
Average
2
N/mm 10.07
Remarks: Sample were provided by contractor

Tested by: Checked by: