This survey report documents a site inspection of the Reybanpac Cuarta Fase development. The report provides an overview of the survey and photos of various areas inspected including fiber connectivity assets, racks, and other equipment labeled as FCAM-001 through FCAM-009. Edgar Jonathan Villegas conducted the survey on May 19, 2023 to inspect and document the network infrastructure at the site.
This survey report documents a site inspection of the Reybanpac Cuarta Fase development. The report provides an overview of the survey and photos of various areas inspected including fiber connectivity assets, racks, and other equipment labeled as FCAM-001 through FCAM-009. Edgar Jonathan Villegas conducted the survey on May 19, 2023 to inspect and document the network infrastructure at the site.
This survey report documents a site inspection of the Reybanpac Cuarta Fase development. The report provides an overview of the survey and photos of various areas inspected including fiber connectivity assets, racks, and other equipment labeled as FCAM-001 through FCAM-009. Edgar Jonathan Villegas conducted the survey on May 19, 2023 to inspect and document the network infrastructure at the site.