Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Notes Consultants

PROJECT

SKI SCHOOL DECK

Owner

4 5 6 7 Ski Dazzle LLC

2 3 info@skidazzle.com

12 0
2 FS0(
?) 2" X
LOCATION

LOS ANGELES CONVENTION


CENTER .1201 S.Figueroa Street
Los Angeles,CA 90015 and other
Convention Center Locations

Drawing Title

3D

-----
Date Issue
20-11-2022 PROGRESS SET

Dwn By K+B
Chkd By
Job No.

Sheet No.

A-1
1 2 3 4 5 6 7
42'-0''
4'-0 8'-0" 8'-0" 8'-0" 8'-0" 6'-0"

4'-0"
Notes Consultants
8'-0"

8'-0"
4'-0"
16'-0"

B PROJECT

SKI SCHOOL DECK

4'-0"
Owner
Ski Dazzle LLC
8'-0"

8'-0"
info@skidazzle.com

PLYWOOD 43 '' ON TOP


OF BOX TUBING

4'-0"
LOCATION

LOS ANGELES CONVENTION


CENTER .1201 S.Figueroa Street
Los Angeles,CA 90015 and other
Convention Center Locations

A
Drawing Title

PLAN

-----
PLAN AT EL. +13 Date Issue
20-11-2022 PROGRESS SET

Dwn By K+B
Chkd By
Job No.

Sheet No.

A-2
1 2 3 4 5 6 7

+13

+9

BR
AC
IN
G-
T
13'-0"

UB
E-
1
BR

.25
AC

''
''
BR

.25

IN
AC

-1
9'-0"

''

G-
.25

BE
IN

TU
-1

-TU
G-

5''
B
BE

TU

1.2
E-1
TUBE-Ø 2'' x 1/8'' Thick
TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


G
TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick

-TU

TUBE-Ø 2'' x 1/8'' Thick


IN

-
BE

BE
.25
AC
G

-1.

TU
''
IN

BR
25

-
NG
AC

''
+2

I
BR

AC
Notes Consultants

BR
2'-0"

BRACING -TUBE-1.25''

+0
4'-0 8'-0" 8'-0" 8'-0" 8'-0" 6'-0"

BRACING -TUBE-1.25''

ELEVATION ON GRID - A
PROJECT

SKI SCHOOL DECK

Owner
1 2 3 4 5 6 7 Ski Dazzle LLC
info@skidazzle.com

LOCATION

+13 LOS ANGELES CONVENTION


CENTER .1201 S.Figueroa Street
Los Angeles,CA 90015 and other
Convention Center Locations

+9 Drawing Title

BR
3D+ELEVATION

AC
ING
-----

-
13'-0"

TU
BE
-
1.2
BR

5''
AC
''
BR

.25
Date Issue

IN
AC

-1
9'-0"

''

G
25
20-11-2022 PROGRESS SET

BE

-TU
IN
-1.

TU
G-

''
BE
BE

5
TU

1.2
G-
TUBE-Ø 2'' x 1/8'' Thick
TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick

-1.
-TU

TUBE-Ø 2'' x 1/8'' Thick


IN

E-
B

2
E-1

B
AC

5''
NG

TU
.25

BR

G-
CI

''

IN
+2
A
BR

AC
BR
2'-0"

BRACING -TUBE-1.25''

+0 Dwn By
Chkd By
K+B

Job No.
4'-0 8'-0" 8'-0" 8'-0" 8'-0" 6'-0"
Sheet No.

BRACING -TUBE-1.25''

A-3
ELEVATION ON GRID C
A B C A B C
8'-0'' 8'-0''
8'-0'' 8'-0''

+13 +13

+9 +9

TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


BRACING -TUBE-1.25'' BRACING -TUBE-1.25''

TUBE-Ø 2'' x 1/8'' Thick


BRACING -TUBE-1.25'' BRACING -TUBE-1.25''

+2 +2 Notes Consultants

+0 +0
ELEVATION ON GRID 7
ELEVATION ON GRID 6
PROJECT

SKI SCHOOL DECK

A B C A B C Owner
Ski Dazzle LLC
info@skidazzle.com
8'-0'' 8'-0'' 8'-0'' 8'-0''

+13 +13
LOCATION

LOS ANGELES CONVENTION


CENTER .1201 S.Figueroa Street
Los Angeles,CA 90015 and other
Convention Center Locations

+9 +9
Drawing Title

3D+ELEVATION
13'-0"

13'-0"
-----
TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


Date Issue
20-11-2022 PROGRESS SET
7'-0''

BRACING -TUBE-1.25'' BRACING -TUBE-1.25''

6'-6"
TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


BRACING -TUBE-1.25'' BRACING -TUBE-1.25''

+2 +2
2'-0"

2'-0"

Dwn By K+B
+0 +0 Chkd By
Job No.

Sheet No.

ELEVATION ON GRID 5 ELEVATION ON GRID 3 A-4


A B C

4'-0"
8'-0'' 8'-0'' PLYWOOD 43 '' ON
+13 TOP OF BOX TUBING

+9 8'-0"
13'-0"

TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick


8'-618"

STEEL ANGLE WELDED WITH PIPE STEEL ANGLE WELDED WITH PIPE
STEEL ANGLE WELDED WITH PIPE STEEL ANGLE WELDED WITH PIPE

4'-0"
TUBE-Ø 2'' x 1/8'' Thick
Notes Consultants
3'-6''

BRACING -TUBE-1.25'' BRACING -TUBE-1.25''

+2
2'-0"

+0
8'-0"
ELEVATION ON GRID 3

''
2''X4'' @24''C.C
3
UNDER PLYWOOD 4 ''

4
3
PROJECT

SKI SCHOOL DECK

A B C 8'-0" Owner
Ski Dazzle LLC
info@skidazzle.com
8'-0'' 8'-0''

+13 LOCATION

LOS ANGELES CONVENTION


CENTER .1201 S.Figueroa Street
Los Angeles,CA 90015 and other
Convention Center Locations

+9 STEEL ANGLE WELDED WITH PIPE

Drawing Title

ELEVATION

-----
TUBE-Ø 2'' x 1/8'' Thick

TUBE-Ø 2'' x 1/8'' Thick

PLYWOOD 43 ''
9'-0"

Date Issue
20-11-2022 PROGRESS SET
TOP OF BOX TUBING
6'-2"

5 21''
STEEL ANGLE WELDED WITH PIPE
STEEL ANGLE WELDED WITH PIPE STEEL ANGLE WELDED WITH PIPE STEEL ANGLE WELDED WITH PIPE STEEL ANGLE WELDED WITH PIPE

+2

5 21''
2'-0"

BRACING -TUBE-1.25'' BRACING -TUBE-1.25''

DETAIL-A Dwn By K+B


+0 Chkd By
Job No.
DETAIL-C
DETAIL-B
Sheet No.
ELEVATION ON GRID 2 A-5

You might also like